Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20058M487 + (ML20058M487)
- 1CAN109303, Requests Withdrawal of Proposed TS Change Request Re Control Room Air Conditioning & Isolation Sys + (ML20058M488)
- ML20058M489 + (ML20058M489)
- ML20058M491 + (ML20058M491)
- ML20058M492 + (ML20058M492)
- ML20058M495 + (ML20058M495)
- ML20058M496 + (ML20058M496)
- NG-93-3784, Documents Results of Visual Exam of Core Spray Spargers Performed During Current (Cycle 12/13) Refueling Outage,Per NRC Bulletin 80-013.Informs of Plan to Repeat Core Spray Sparger Insp During Next Refueling Outage (Cycle 13/14) + (ML20058M497)
- NRC-93-0127, Monthly Operating Rept for Nov 1993 for Fermi 2 + (ML20058M498)
- JPN-93-072, Submits Response to GL 89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment + (ML20058M499)
- IR 05000057/1990002 + (ML20058M500)
- ML20058M501 + (ML20058M501)
- ML20058M502 + (ML20058M502)
- ML20058M503 + (ML20058M503)
- ML20058M504 + (ML20058M504)
- L-93-305, Forwards Rev 16 to Guard Training & Qualification Plan.W/O Encl + (ML20058M505)
- ML20058M506 + (ML20058M506)
- ML20058M508 + (ML20058M508)
- ML20058M512 + (ML20058M512)
- ML20058M513 + (ML20058M513)
- ML20058M516 + (ML20058M516)
- ML20058M518 + (ML20058M518)
- ML20058M519 + (ML20058M519)
- ML20058M521 + (ML20058M521)
- LIC-93-0293, Monthly Operating Rept for Nov 1993 for Fort Calhoun Station + (ML20058M522)
- ML20058M523 + (ML20058M523)
- ML20058M524 + (ML20058M524)
- ML20058M525 + (ML20058M525)
- SNRC-2102, Forwards Response to NRC Inspector Observations Made During Preparation for & Execution of First Irradiated Fuel Shipment from Shoreham to Limerick Generating Station + (ML20058M526)
- ML20058M529 + (ML20058M529)
- 1CAN099302, Forwards Relief Request from Requirements of IWB-2420(b) of ASME Boiler & Pressure Vessel Code,Section XI,1980 Edition Re Successive Insps of RCP Weld Flaw Indications + (ML20058M530)
- ML20058M531 + (ML20058M531)
- 0CAN099303, Submits Responses to NRC GL-89-10,Suppl 5, Inaccuracy of MOV Diagnostic Equipment, .Planned Actions Include Obtaining Estimate Inaccuracy Factor by 931020 + (ML20058M535)
- ML20058M536 + (ML20058M536)
- TXX-9333, Forwards Copy of Application for Renewal of NPDES Permit TX0065854 + (ML20058M538)
- IR 05000461/1993022 + (ML20058M539)
- ML20058M541 + (ML20058M541)
- 05000285/LER-1993-016, :on 931113,CEA Withdrew from Reactor Core & Rod 31 Became Fully Withdrawn.Caused by Lack of Ground Detection Sys for Associated Power Supplies.Ground Detection for CRD Power Supply Installed + (ML20058M542)
- PY-CEI-NRR-1708, Submits Response to Notice of Violation & Proposed Imposition of Civil Penalty in Amount $200,000 Re Insp Rept 50-440/93-11.Corrective Actions:Licensee Failed to Promptly Identify Cause for Poor Cleanliness of Suppression Pool + (ML20058M543)
- ML20058M544 + (ML20058M544)
- ML20058M546 + (ML20058M546)
- ML20058M551 + (ML20058M551)
- IR 05000454/1993016 + (ML20058M552)
- ML20058M553 + (ML20058M553)
- ML20058M558 + (ML20058M558)
- ML20058M560 + (ML20058M560)
- ML20058M561 + (ML20058M561)
- ML20058M563 + (ML20058M563)
- ML20058M565 + (ML20058M565)
- ML20058M567 + (ML20058M567)
- ML20058M568 + (ML20058M568)