Text
__
Douglas R. Gipsori Senuar Vice Pres 40ent fjdC,ltist GerwriittOD Detroit. -
r-o coo Noe ome meway Ed O Newprt. %chgan 48166 (3!3) 06fM?49 Reg Guide 1.16 December 15, 1993 NRC-93-0127 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for November, 1993 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November, 1993 This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Brian Stone, at (313) 586-5148.
Sincerely, Enclosure cc:
T. G. Colburn D. R. Hahn W. J. Kropp J. B. Martin M. P. Phillips P. L. Torpey cJ.gn'cd 01 g
il R
lll
OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY B. J. Stone DATE December 15, 1993 TELEP110NE (313) 586-5148 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 i Notes:
(1) Calculated using weight-l 2.
REPORTING PERIOD: November 1993 i ed averages to reflect variations 1
3 LICENSED TilERMAL POWER (MWL):
3430 I in rating (MDC and DER).
l 4.
NAMEPLATE RATING (GROSS MWe):
1179 I (2) Currently limiting power to l
5.
DESIGN ELECT RATING (Net MWe): 1116 I 93 5% CTP maximum to limit turbine 1
6.
MAX DEPENDABLE CAP (GROSS MWe):1135 I component vibration. All ratings 1
7.
HAX DEPENDABLE CAP (Net MWe):1085 l reflect 98% CTP due to turbine l
l throttle valve Ilmitations.
l 8.
IF Cl!ANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TilROUGH 7) SINCE LAST REPORT, GIVE REASONS:
N/A 9.
POWER LEVEL TO WHICll RESTRICTED, IF ANY (MWe Net):
(2)
- 10. REASONS FOR RESTRICTION, IF ANY:
(2)
TilIS MONTil YR TO DATE CUMULATIVE
- 11. IIRS IN REPORTING PERIOD 720 8,016
__ 51,326
- 12. IIRS REACTOR WAS CRITICAL 720 7,552.6 39,955.8
- 13. HEACTOR RESERVE SHUTDOWN !!RS 0
0 0
- 14. Il0VRS GENERATOR ON-LINE 720 7,488.1 38,535.2
- 15. UNIT RESERVE SHUTDOWN IIOURS 0
0 0
- 16. GitOSS TiiERMAL ENERGY GEN (MWil) 2,306,568 23,744,856 117,832,151
- 17. GROSS ELECT ENERGY GEN (MWH) 787,020 8,006,970 39,334,717
- 18. NET ELECT ENERGY GEN (MWil) 753,623 7,671,804 37,620,805 l
- 19. UNIT SERVICE FACTOR 100.0 93.4 75.1
- 20. UNIT AVAILABILITY FACTOR 100.0 93.4 75.1
- 22. UNIT CAP FACTOR (USING DER NET) 93.8 85.8
~ 66.8 (1)
- 23. UNIT FORCED OUTAGE RATE 0.0 2.8 6.9
- 24. SIIUTDOWNS SCllEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACil):
REFUELING: STARTS MARCil 12,.1994:
DURATION 50 DAYS
- 25. IF SilUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACilIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
AVERAGE DAILY UNIT IMH LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE December 15, 1993 COMPLETED BY H. Pirkle TELEPfl0NE (313) 586-5027 Month November, 1993 DAY AVERAGE DAILY POWEH LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(HWe-Net)
P 1
1054 17 1049 2
1052 18 1051 3
1047 19 1044 4
1044 20 1052 5
1037 21 1047 6
1041 22 1047 7
1055 23 1048 8
1052 24 1046 9
1049 25 1050 10 1049 26 1047 11 1044 27 1054 12 1048 28 1055 13 1036 29 1055 i
14 1041 30 1056 15 1041 31 N/A 16 1050 l
i i
i
~.
I f
UNIT SHUTDOWNS AND POWER REDUCTIONS
,a DOCmET NO.
50-34'
- DATE Dece-oe-ts. 199?
t UNIT NAME Fer*4 2 T
COVpLETED BY E.
J.
Stone r
TELEPHONE (313) 59E-514E REPORT MONTM November, 1993 a
h r
5 i
i METHOD Or i
l i
i l.
t SHUTTING Dows i LER I Sv5 i COMr CAUSE & CORRECTIVE t
i NO.
}
DATE TYPE i DUP l REASON i THE REACTOC NO.
I CODE l CODE !
ACTION TO~DREVENT I
}
(1) 1 (HRS)I (2) l OR REDUCING i
l (4) !
(5)
RECURRENCE f
I (6) i (7) l
{ POWER (3) l I
I f
I i
i-1 i
i i
i i
a ___
i l ___
I f
f i
l 1
i 1
i (1) F: FCRCED.
(2) REASON:
(3) METHOD:
(4) INSTRUCTIONS FOR S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING-3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)
E - CDERATOR TRAINING & LICENSE EXAMINATION 5 - REQUCED LOAD F - ADMINISTRATIVE e
9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)
H-OTHER (EXRLAIN) i (5) SAME SOURCE AS (4) 1 (6) R - PREFIX INDICATES POWER REDUCTION.
5 - PREFIX INDICATES PLANT SHUTDOWN.
i (7) DURATION OF REDUCTIONS REPORTED AS ZERO PER REG.
GUIDE 1.16 REV. 4 k
e f
?
-... -... - - - - - - ~ ~ - - - - - - - ~ + - - - -
- - - ~ ~ - ~ ' '