ML20058M568

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1993 for Callaway Plant Unit 1
ML20058M568
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1993
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2921, NUDOCS 9312210030
Download: ML20058M568 (6)


Text

.
  • Cataw<wriant .

P,w O!11ccikx G20 lut on. l%maan c5251.

December 13,1993 Union Euicnuc 53 Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 ULNRC-2921

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER.1993 The enclosed Monthly Operating Report for November,1993 is submitted pursuant ta section 6,9.1,8 of the Callaway Unit 1 Technical Specifications,

,A 0 M .4 p / ,

e.D.Blosser n Manager, Callaway Plant Y ,

$v 3 f(V 3DB/DT//JAltTA!.1/Jy t.Ltte t

Enclosure ec: Distribution attached

.k. bb b 9g22[pggqgibbyp f g6p,4

cc distribution for ULNRC-2921 with encitsults Mr.1. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region 111 801 Warrenville Road Lisle, IL 60532-4351 Mr. L. R. Wharton (2 copics)

Office of Nuclear Reactor Regulation U.S. Nuc! car Regulatory Commission I White Flint, Nortii Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident inspector Manager, Electric Department  !

Missouri Public Service Commission P.O. Box 360 Jerrerson City, MO 65102

4-DOCKET NO. 50-483 {

UNIT NAME CALLAWAY UNIT 1 I

DATE 12 13-93 COMPLETED BY J. B. McInvale I TELEPHONE 314/676-8247 f

i PART A OPERATIONS

SUMMARY

t The plant was started up after a refueling outage during the month of November.

PART B PORV AND SAFETY VALVE

SUMMARY

t i

t None  ;

f l

i i

4 l

i l

l l

Page1of4 ,

I

. ~ , . .-l

a r -- 4 s /

9 1 PART C 4-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 12-13-93 COMPLETED BY J. B. McImale ,

TELEPHONE 314/676-8247 MONTH: NOVEMBER 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL ,

l DAY (MWe-Net) DAY (MWe-Net) f I O 17 0 l 2 0 18 0 3 0 19 0 4 0 '

20 0' 5 0 21 0 6 0 22 21 7 0 23 350 ,

8 0 24 458- l 9 0 25 503 's 10 0 26 '1015 '!

11 0 27 1099 12 0 28 1146 13 0 29 ' 1166~

14 0 30 1166 ,

l 15 0 16 0 i

i Page 2 of 4 -

i

. . .-- - . ~ -

1 y .. .' I i

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I l DATE 12-13-93 COMPLETED BY J. B. Mclm ale ,

TELEPHONE 314/676-8247 i

OPERATINO STATUS *

(YTD) (CUM) ,

1. krf0RTING PERIOD: NOVEMBER 1993 GROSS IlOURS IN REPORTING PERIOD; 720 8,016 - 78,421.5 -i 2 CURRENTLY AUTilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe. Net): 1120 DESIGN ELECTRICAL RATING (MWe-Net): 1171 i
3. POWER !EVEL TO WillCll RESTRICTED (IF ANY)(MWe-Net):

1

4. REASONS FOR RESTRICrlON (IF ANY):

Tills MONTil YR TO DATE CUh!ULATIVE  !

5. NUMBER OF IlOURS REACTOR WAS CRITICAL 272 6824.0 68,202.7 ,
6. REACFOR RESERVE SIIUTIX)WN IIOURS 0 0 0
7. IlOURS GENERATOR ON!lNE 202.9 675.54 66,811.1
8. UNIT RESERVE SiltrrDOWN IIOURS. 0 0 0
9. GROSS TIIERMAL IWERGY GENERATED (MWII)... 528,099 23,177,528 -224,257,478
10. GROSS ElICTRICAL ENEROY GENERATED (MWil) 176.830 7,914,393 76,476,289 r
11. NET ELECTRICAL ENERGY GENERATED (MWII) 153,560 7,535,641 72,709,739 *
12. REACTOR SERVICE FACTOR 37.8 85.1 87.0 .
13. REACTOR AVAILABILITY FACTOR 37.8 85.1 87.0 I
14. UNIT SERVICE FACTOR 28.2 84.3 85.2 UNIT AVAILA111LITY FACTOR .
15. 28.2 84.3 85.2
16. UNIT CAPACITY FACTOR (Uning MDC). 19.0 83.9 82.8
17. UNIT CAPACITY FACTOR (Uning Design MWe).... I 8.2 80.3 79.2 l

-l 18 UNIT FORCED OUTAGE RATE 0.0 0.0 2.56 - >

l

19. SIRTfDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATF, AND DURATION OF EACll):

-l

20. IF SiRTT DOWN AT FND OF REPORTING PERJOD, ESTIM ATE DATE OF STAR 7UP: N/A l t

5 1

i 1

Page 3 of 4  ;

i

  • i .. _

',1 t.

PART E UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-453 UNIT NAME CAllAWAY UNIT I DATE 12-13-93 COMPLETED BY J. B. hicIm31e TELEPliONE 314'676-8247 REPORT MONTil: NOVEMBER 1993 METIIOD OF TYPE SIIUTITNG D0%N F: FORCED DURATION TIIE REACTOR OR .c EQ DATE S: SCllEDULFD (l!OURS) REASON REDUCING POWER CORRECTIVFjACTIONS' COMMENTS 5 10-01-93 S 5%.5 C 1 The unit was shutdown for refucimg for the first part of the mtettt 6 11-23-93 S 10.6 B 4 On 11-23 93, a main turbme eerspeed try test was performed.

SUMMARY

REASON METilOD A: EQUIPMENT FAllERE(EXPLAIN) 1: MAWAL B: MAINT.ORTEST 2: hlANUALSCRAh!

C: REFUELING 3: AUTOMATIC SCRAM D. REGUIATORY RESTRICITON 4: OTIIER(EMLAIN)

E: OPERATOR TRAINING AND .

LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(EXTIAIN)

II: OTIIER(EXPLAIN)

Page 4 of 4

. . . _ . - _ ,- - _ - - _ _ - _ _ _ = . - _ _

.