Monthly Operating Rept for Nov 1993 for Callaway Plant Unit 1
ML20058M568
Person / Time
Site: Callaway Ameren icon.png
Issue date: 11/30/1993
From: Blosser J, Mcinvale J
UNION ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
ULNRC-2921, NUDOCS 9312210030
Download: ML20058M568 (6)


Text

.

Cataw<w iant.

r P,w O!11ccikx G20 lut on. l%maan c5251.

December 13,1993 Union Euicnuc 53 Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 ULNRC-2921

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER.1993 The enclosed Monthly Operating Report for November,1993 is submitted pursuant ta section 6,9.1,8 of the Callaway Unit 1 Technical Specifications,

,A 0M.4 p /

e.D.Blosser n

Manager, Callaway Plant Y

$v f(V 3

t 3DB/DT//JAltTA!.1/J t.Ltte y

Enclosure ec: Distribution attached

.k.

b b b

9g22[pggqgibbyp f

g6p,4

cc distribution for ULNRC-2921 with encitsults Mr.1. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region 111 801 Warrenville Road Lisle, IL 60532-4351 Mr. L. R. Wharton (2 copics)

Office of Nuclear Reactor Regulation U.S. Nuc! car Regulatory Commission I White Flint, Nortii Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jerrerson City, MO 65102

4-DOCKET NO.

50-483

{

UNIT NAME CALLAWAY UNIT 1 I

DATE 12 13-93 COMPLETED BY J. B. McInvale I

f TELEPHONE 314/676-8247 i

PART A OPERATIONS

SUMMARY

t The plant was started up after a refueling outage during the month of November.

PART B PORV AND SAFETY VALVE

SUMMARY

t i

t None f

l i

i 4

i Page1of4

~

.-l

a r

4 s

/

9 1

PART C 4-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 12-13-93 COMPLETED BY J. B. McImale TELEPHONE 314/676-8247 MONTH: NOVEMBER 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l

DAY (MWe-Net)

DAY (MWe-Net) f I

O 17 0

l 2

0 18 0

3 0

19 0

4 0

20 0'

5 0

21 0

6 0

22 21 7

0 23 350 8

0 24 458-9 0

25 503

's 10 0

26

'1015 11 0

27 1099 12 0

28 1146 13 0

29

' 1166~

14 0

30 1166 l

15 0

16 0

i i

Page 2 of 4 i

. ~ -

1 I

y i

PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I l

DATE 12-13-93 COMPLETED BY J. B. Mclm ale TELEPHONE 314/676-8247 i

OPERATINO STATUS (YTD)

(CUM) 1.

krf0RTING PERIOD: NOVEMBER 1993 GROSS IlOURS IN REPORTING PERIOD; 720 8,016 - 78,421.5

-i 2

CURRENTLY AUTilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe. Net): 1120 DESIGN ELECTRICAL RATING (MWe-Net): 1171 i

3.

POWER !EVEL TO WillCll RESTRICTED (IF ANY)(MWe-Net):

1 4.

REASONS FOR RESTRICrlON (IF ANY):

Tills MONTil YR TO DATE CUh!ULATIVE 5.

NUMBER OF IlOURS REACTOR WAS CRITICAL 272 6824.0 68,202.7 6.

REACFOR RESERVE SIIUTIX)WN IIOURS 0

0 0

7.

IlOURS GENERATOR ON!lNE 202.9 675.54 66,811.1 8.

UNIT RESERVE SiltrrDOWN IIOURS.

0 0

0 9.

GROSS TIIERMAL IWERGY GENERATED (MWII)...

528,099 23,177,528

-224,257,478 10.

GROSS ElICTRICAL ENEROY GENERATED (MWil) 176.830 7,914,393 76,476,289 r

11.

NET ELECTRICAL ENERGY GENERATED (MWII) 153,560 7,535,641 72,709,739 12.

REACTOR SERVICE FACTOR 37.8 85.1 87.0 13.

REACTOR AVAILABILITY FACTOR 37.8 85.1 87.0 I

14.

UNIT SERVICE FACTOR 28.2 84.3 85.2 15.

UNIT AVAILA111LITY FACTOR.

28.2 84.3 85.2 16.

UNIT CAPACITY FACTOR (Uning MDC).

19.0 83.9 82.8 17.

UNIT CAPACITY FACTOR (Uning Design MWe)....

I 8.2 80.3 79.2 l

-l 18 UNIT FORCED OUTAGE RATE 0.0 0.0 2.56 -

l 19.

SIRTfDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATF, AND DURATION OF EACll):

-l 20.

IF SiRTT DOWN AT FND OF REPORTING PERJOD, ESTIM ATE DATE OF STAR 7UP: N/A l

t 5

i 1

Page 3 of 4 i

  • i.. _

',1 t.

PART E UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-453 UNIT NAME CAllAWAY UNIT I DATE 12-13-93 COMPLETED BY J. B. hicIm31e TELEPliONE 314'676-8247 REPORT MONTil: NOVEMBER 1993 METIIOD OF TYPE SIIUTITNG D0%N F: FORCED DURATION TIIE REACTOR OR

.c EQ DATE S: SCllEDULFD (l!OURS)

REASON REDUCING POWER CORRECTIVFjACTIONS' COMMENTS 5

10-01-93 S

5%.5 C

1 The unit was shutdown for refucimg for the first part of the mtettt 6

11-23-93 S

10.6 B

4 On 11-23 93, a main turbme eerspeed try test was performed.

SUMMARY

REASON METilOD A: EQUIPMENT FAllERE(EXPLAIN) 1: MAWAL B: MAINT.ORTEST 2: hlANUALSCRAh!

C: REFUELING 3: AUTOMATIC SCRAM D. REGUIATORY RESTRICITON 4: OTIIER(EMLAIN)

E: OPERATOR TRAINING AND.

LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(EXTIAIN)

II: OTIIER(EXPLAIN)

Page 4 of 4

=. -

.