Cataw<w iant.
r P,w O!11ccikx G20 lut on. l%maan c5251.
December 13,1993 Union Euicnuc 53 Nuclear Regulatory Commission Document Control Desk Washington,DC 20555 ULNRC-2921
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER.1993 The enclosed Monthly Operating Report for November,1993 is submitted pursuant ta section 6,9.1,8 of the Callaway Unit 1 Technical Specifications,
,A 0M.4 p /
e.D.Blosser n
Manager, Callaway Plant Y
$v f(V 3
t 3DB/DT//JAltTA!.1/J t.Ltte y
Enclosure ec: Distribution attached
.k.
b b b
9g22[pggqgibbyp f
g6p,4
cc distribution for ULNRC-2921 with encitsults Mr.1. N. Jackiw, Chief Reactor Projects Section 3C U.S. Nuclear Regulatory Commission Region 111 801 Warrenville Road Lisle, IL 60532-4351 Mr. L. R. Wharton (2 copics)
Office of Nuclear Reactor Regulation U.S. Nuc! car Regulatory Commission I White Flint, Nortii Mail Stop 13E21 1155 Rockville, MD 20852 NRC Resident inspector Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jerrerson City, MO 65102
4-DOCKET NO.
50-483
{
UNIT NAME CALLAWAY UNIT 1 I
DATE 12 13-93 COMPLETED BY J. B. McInvale I
f TELEPHONE 314/676-8247 i
PART A OPERATIONS
SUMMARY
t The plant was started up after a refueling outage during the month of November.
PART B PORV AND SAFETY VALVE
SUMMARY
t i
t None f
l i
i 4
i Page1of4
~
.-l
a r
4 s
/
9 1
PART C 4-AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-483 UNIT Callaway Unit 1 DATE 12-13-93 COMPLETED BY J. B. McImale TELEPHONE 314/676-8247 MONTH: NOVEMBER 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL l
DAY (MWe-Net)
DAY (MWe-Net) f I
O 17 0
l 2
0 18 0
3 0
19 0
4 0
20 0'
5 0
21 0
6 0
22 21 7
0 23 350 8
0 24 458-9 0
25 503
's 10 0
26
'1015 11 0
27 1099 12 0
28 1146 13 0
29
' 1166~
14 0
30 1166 l
15 0
16 0
i i
Page 2 of 4 i
. ~ -
1 I
y i
PART D OPERATING DATA REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT I l
DATE 12-13-93 COMPLETED BY J. B. Mclm ale TELEPHONE 314/676-8247 i
OPERATINO STATUS (YTD)
(CUM) 1.
krf0RTING PERIOD: NOVEMBER 1993 GROSS IlOURS IN REPORTING PERIOD; 720 8,016 - 78,421.5
-i 2
CURRENTLY AUTilORIZED POWER LEVEL (MWt): 3565 MAX. DEPEND. CAPACITY (MWe. Net): 1120 DESIGN ELECTRICAL RATING (MWe-Net): 1171 i
3.
POWER !EVEL TO WillCll RESTRICTED (IF ANY)(MWe-Net):
1 4.
REASONS FOR RESTRICrlON (IF ANY):
Tills MONTil YR TO DATE CUh!ULATIVE 5.
NUMBER OF IlOURS REACTOR WAS CRITICAL 272 6824.0 68,202.7 6.
REACFOR RESERVE SIIUTIX)WN IIOURS 0
0 0
7.
IlOURS GENERATOR ON!lNE 202.9 675.54 66,811.1 8.
UNIT RESERVE SiltrrDOWN IIOURS.
0 0
0 9.
GROSS TIIERMAL IWERGY GENERATED (MWII)...
528,099 23,177,528
-224,257,478 10.
GROSS ElICTRICAL ENEROY GENERATED (MWil) 176.830 7,914,393 76,476,289 r
11.
NET ELECTRICAL ENERGY GENERATED (MWII) 153,560 7,535,641 72,709,739 12.
REACTOR SERVICE FACTOR 37.8 85.1 87.0 13.
REACTOR AVAILABILITY FACTOR 37.8 85.1 87.0 I
14.
UNIT SERVICE FACTOR 28.2 84.3 85.2 15.
UNIT AVAILA111LITY FACTOR.
28.2 84.3 85.2 16.
UNIT CAPACITY FACTOR (Uning MDC).
19.0 83.9 82.8 17.
UNIT CAPACITY FACTOR (Uning Design MWe)....
I 8.2 80.3 79.2 l
-l 18 UNIT FORCED OUTAGE RATE 0.0 0.0 2.56 -
l 19.
SIRTfDOWNS SCIIEDULED OVER NEXT 6 MONTilS (TYPE, DATF, AND DURATION OF EACll):
-l 20.
IF SiRTT DOWN AT FND OF REPORTING PERJOD, ESTIM ATE DATE OF STAR 7UP: N/A l
t 5
i 1
Page 3 of 4 i
- i.. _
',1 t.
PART E UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-453 UNIT NAME CAllAWAY UNIT I DATE 12-13-93 COMPLETED BY J. B. hicIm31e TELEPliONE 314'676-8247 REPORT MONTil: NOVEMBER 1993 METIIOD OF TYPE SIIUTITNG D0%N F: FORCED DURATION TIIE REACTOR OR
.c EQ DATE S: SCllEDULFD (l!OURS)
REASON REDUCING POWER CORRECTIVFjACTIONS' COMMENTS 5
10-01-93 S
5%.5 C
1 The unit was shutdown for refucimg for the first part of the mtettt 6
11-23-93 S
10.6 B
4 On 11-23 93, a main turbme eerspeed try test was performed.
SUMMARY
REASON METilOD A: EQUIPMENT FAllERE(EXPLAIN) 1: MAWAL B: MAINT.ORTEST 2: hlANUALSCRAh!
C: REFUELING 3: AUTOMATIC SCRAM D. REGUIATORY RESTRICITON 4: OTIIER(EMLAIN)
E: OPERATOR TRAINING AND.
LICENSE EXAMINATION F: ADMINISTRATION 0: OPERATIONALERROR(EXTIAIN)
II: OTIIER(EXPLAIN)
Page 4 of 4
=. -
.