CCN #93-14168.
~
PHILADELPHIA ELECTRIC COMPANY PEACH BOTTOM ATOMIC POWER STATION R.D.1, Box 208 Delta, Pennsylvania 17314 rucu acrrrw-Tun nun w rxsurxs (717) 456-7014 December 15, 1993 Docket Nos. ~50-277 50-278 U.S. Nuclear Regulatory Cammission Document Control Desk Washington, DC 20555 SURTECT:
Peach Bottom Atcxaic Power Station Monthly Operating Report Gentlemen:
Enclosed are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3.for the month of November 1993 forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.
Sincerely, Gerald R. Rainey.
7 Vice President GRR/A3W/GHG/TJN/MSH:wjj Enclosure cc:
R.A. Burricelli, Public Service. Electric & Gas W.P. Dornsife, Commonwealth of Pennsylvania R.I. Wimn, State of Maryland T.T. Martin, Administrator, Region I, LENRC W.L. Schmidt, USNRC, Senior Resident Inspcctor H.C. Schwemm,-Atlantic Electric C.D. Schaefer, Delmarva Power
- INPO Records Center cc1193.NRC
//
2100?
Jk
?!'
1 931221 % hhhh00770h i
PDR A
pna
.R
f
~~ -
W w
PEACH BOTTOM ATOMIC POWER STATION MONTHLY UPDATE NOVEMBER 1993 EXECUTIVE
SUMMARY
OVERVIEW OF ACTIVITIES COMMON PLANT The following plant maintenance outages occurred during the month of.
November.
- Motor Driven Fire Pump Also a major cleanup effort to improve the condition of the plant was accomplished.
UNIT 2 Unit 2 began the month of November at a nominal 100% power and operated at that level the entire month.
There were no major reductions in power this month. There were minor power reductions, of approximately 30MWe, to perform surveillance testing. These reductions were for very short time periods.
The following maintenance outages occurred on Unit 2:
- Hydraulic Control Units UNIT 3 Unit 3 began the month of November shutdown in the middle of the ninth refueling outage.
On November 12,1993 the Unit 3 mode switch was taken to the start-up position.
On November 15,1993 the Unit 3 refuel outage ended when the main generator was synchronized to the grid at 2:45 a.m.
On November 19,1993 Unit 3 reached 100% power.
On November 28,1993 at 0414 hours0.00479 days <br />0.115 hours <br />6.845238e-4 weeks <br />1.57527e-4 months <br /> power was reduced due to control rod 34-31 being inoperable caused by HCU failure.
On November 28,1993 at 2040 hours0.0236 days <br />0.567 hours <br />0.00337 weeks <br />7.7622e-4 months <br /> repairs were completed on HCU 34-31 and Unit 3 was returned to 100% power.
Unit 3 ended the month at 100% nominal power.
There were no maintenance outages for Unit 3 this month.
1 a
Docket No. 50-277 Attachment to Monthly Operating Report for November 1993
-4 a
INIT 2 REFUELING INFORMATIm 1.
Name of facility:
Peach Bottom Unit 2 2.
Scheduled date for next refueling shutdown:
Reload 10 scheduled for S?otember 10, 1994.
3.
Scheduled date for restart follwing refueling:
Restart follwing refueling forecast for December 8,1994.
4.
Will refueling or resumption of operation therefore require a technical specification change or other license amendment?
No.
If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for sadraittiIg proposed licensirg actier and supporting information:
N/A 6.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perforrance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel' storage pool:
(a)
Core - 764 Fut1 Assemblies (b)
Fuel Pool - 2154 Fuel Assemblies, 58 Fuel Rods 1
CC1193.NRC i
I
p q
Docket No. 50-277 Attachment to Monthly Operating Report for Noverker 1993 Page 2
~
UNIT 2 REFUFLTJG INIUMATIN (Continued) 8.
'Ihe present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
'Ihe projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity:
September 2003 without full core offload capability.
September 1997 with full core offload capability.
CC1193.NRC
7
{
w Docket No. 50-278 Attachment to Monthly Operatirg.
Report for November 1993 LNIT 3 REFUELTPC INFORKWIOT 1.
Name of facility:
Peach Bottom Unit 3 2.
Scheduled date for next refueling shutdown:
Reload 10 schedaled for Septenber 11,1995 3.
Scheduled date for restart following refueling Restart following refueling scheduled for Noverter 13, 1995 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendnent?
No If answer is yes, what, in general, will these be?
5.
Scheduled date(s) for submittire proposed licensing action and supporting infomation:
N/A 6.
Irportant licensing considerations associated with refueling, e.g., new cr different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
N/A 7.
The number of fuel assemblies -(a) in the core and (b) in the spent fuel storage pool:
(a)
Core - 764 Fuel Assemblies (b)
Fuel Pool - 2201 Fuel Assemblies, 6 Fuel Rods CC1193.NRC
o.
Docket No. 50-278 Attachment to Monthly Operating-Report for November 1993 Page 2 WIT 3 REFUELING INFORRTICE (Continued) 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies.
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assning the present capacity:
Septenber 2004 without full core offload capability.
Septerier 1998 with full core offload capability.
CC1193.NRC
Y.
g.
4 3=.
AVERAGE DAILY UNIT POWER LEVEL C
s.
DOCKET NO. 50 - 277 ao -
UNIT PEACH BOTTOM UNIT 2 DATE DECEMBER 13,1993
~~
COMPANY PHILADELPHI A ELECTRIC COMPANY W. J. JEFFREY PERFORMANCE & RELIABILITY i-SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 t
MONTH NOVEMBER 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 1065 17 1071 2
1063 18 1071 3
1063 19 1067 4
1062 20 1071 5
1059 21 1066 6
1063 22 1069 7
1063 23 1056 8
1064 24 1070 9
1063 25 1066 10 1064 26 1C58 11 1064 27 1062 12 1073 28 1070 13 1064 29 1058 14 1063 30 1062 15 1067 16 1070
~
.; 1 m.
p.
AVERAGE DAILY UNIT POWER LEVEL e
DOCKET NO. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE DECEMBER 13,1993 COMPANY PHILADELPHIA ELECTRIC COMPANY W. J. JEFFREY PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION l
TELEPHONE (717) 456-7014 EXT. 4027 MONTH NOVEMBER 1993
~
DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL e
(MWE-NET)
(MWE-NET)
~
s 1
0 17 262 I
2 0
18 744 s
3 0
19 1019 4
0 20 1051 5
0 21 1060 i
6 0
22 1071 7
0 23 1053
- t..
8 0
24 1063 i
9 0
25 1059 10 0
26 1060 11 8
27 1060
~
12 0
28 965 13 8
29 1039 14 9
30 1051 15 100 16 213 e
i I
1
.a' l
~L. - -
i OPERATING DATA REPORT DOCKET NO. 50 - 277 1
DATE DECEMBER 13,1993 1
COMPLETED BY PHILADELPHIA ELECTRIC COMPANY 9
W. J. JEFFREY PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 2 NOTES:
- 2. REPORTING PERIOD: NOVEMBER, 1993
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE1:
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
kb55
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FOR RESTR!CTIONS, IF ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720 8,016 170,136
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 72bb b,9k b 1bh,3bh$k
- 13. REACTOR RESERVE SHUTDOWN HOURS bb bb bb
- 14. HOURS GENERATOR ON-LINE hbb$b b,bbh$b kbk$Ihb$2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 2,367,734 21,701,343 302,071,087
)
17, GROSS ELECTRICAL ENERGY GENERATED (MWH) 790,500 7,172,900 99,345,290
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 766,695 6,922,200 95,208,919
)
s PAGE 1 0F 2 1
i t
1 i
n A
e ;-
- j OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 277
-4.
-DATE DECEMBER 13,1993 I
THIS MONTH YR TO-DATE CUMULATIVE r
~~
- 19. UNIT SERVICE FACTOR 100.0 85.2 59.6
- 20. UNIT AVAILABILITY FACTOR 100.0 85.2
.59.6
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 1bb 9 31 9 hh b
.x i
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.0 81.1 52.5
- 23. UN]T FORCED OUTAGE RATE 0.0 5.9 14.0
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TTPE, DATE, AND DURATION OF EACH):
i k
- 25. IF SHUTDOWN AT EhD OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS lN 1EST STATUS (PRIOR TO COMMERCIAL OPERAT]CN):
FORECAST ACHIEVED i
INITIAL CRITICALITY 09/16/73 INITIAL ELECTRICITY 02/18/74 i
COMMERCIAL OPERATION 07/05/74 s
PAGE 2 0F 2 j
'1 i
R m
OPERATING DATA REPORT k.
DOCKET No. 50 - 278 DATE DECEMBER 13,1993 COMPLETED BY PHiLEbELPHkk klEbiRib bbMP N5 W. J. JEFFREY PERFORMANCE & RELIABILITY s'
SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 OPERATING STATUS
- 1. UNIT NAME: PEACH BOTTOM UNIT 3 NOTES:
- 2. REPORTING PERIDO: NOVEMBER, 1993
- 3. LICENSED THERMAL POWER (MWT):
3293
- 4. NAMEPLATE RATING (GROSS MWE):
1152
- 5. DESIGN ELECTRICAL RATING (NET MWE):
1065
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 1098 1
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):
1035 j.
8.'IF CHANGES OCCUR IN CAPACITY RAT]NGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT,' GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE):
- 10. REASONS FCR RESTRICTIONS, IF'ANY:
THIS MONTH YR-TO-DATE CUMULATIVE
- 11. HOURS IN REPCRTING PER100 720 8,016 166,032
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL hkh$b bk9b$b kb,h5b$E
- 13. REACTDR RESERVE SHUTDOWN HOURS bb bb bb
- 14. HOURS GENERATOR ON-LINE hhh$b b,khh b kbbBhbb
- 15. UNIT RESERVE SHUTDOWN HOURS b$b b$b b$b
- 16. GROSS THERMAL EhERGY GENERATED (MWH) 1,107,648 18,888,371 297,469,581
- 17. CROSS ELECTRICAL ENERGY GENERATED (MWH) hkh,6bb b,khh,bbb 9h,hbh.,khh
- 18. NET ELECTRICAL ENERGY GENERATED (MWH)-
331,704 5,901,630 93,565,596 PAGE 1 0F 2 4
i l
l i
-i i
l
~l i
b
-~
.x 1
fG Hf L6<
OPERATING DATA REPORT (CONTINUED)
DOCKET NO. 50 - 278 r4 p.
DATE DECEMBER 13,1993 THIS MONTH YR-TO-DATE CUMULATIVE
,m
. i
- 19. UNIT SERVICE FACTOR 53.1 77.1 60.8
- 20. UNIT AVAILABILnTY FACTOR 53.1 77.1 60.8 1
9 t
- 21. UNIT CAPACITY FACTOR (USING HDC NET) 44.5 71.1-54.4
- 22. UNIT CAPACITY FACTOR (USING DER NET) 43.3 69.1 52.9
- 23. UNIT FORCED OUTAGE RATE 0.0 2.4 12.1
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
-)
w
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 11/14/95
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST' ACHIEVED l
INITIAL CRITICALITY 08/07/74 INITIAL ELECTRICITY 09hhk)7$
COMMERCIAL OPERATION 12/23/74 l
I PAGE 2 0F 2 l
'J i
p.
.,+
e
a w
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50 - 277 i.
UNIT NAME PEACH BOTTOM UNIT 2
?
DATE DECEMBER 13,1993 REPORT MONTH NOVEMBER, 1993 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY W. J. JEFFREY PERFORMANCE & RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION-I TELEPHONE (717) 456-7014 EXT. 4027 l
METHOD OF LICENSEE SYSTEM COMPONENT' CAUSE AND CORRECTIVE TYPEjDURATION REASON SHUTTING DDWN ' EVENT CODE CODE ACTION TO
.NO.'
DATE (1)j (HOURS)
(2)
REACTOR (3)
REPORT #
(4)
(5)
PkEVENT RECURRENCE 3
l l
1 1
l I
i
)
l i
i e
1 (1)
(2)
(3)
(4)
.I F FORCED REASON METHOD EXHIBIT G INSTRUCTIONS S - SCHEDULED A + EQUIPMENT FAILURE (EXPLAIN)-
1 - MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE
.C - REFUELING
- 3 - AUTOMATIC SCRAM.
EVENT REPORT (LER)
'D REGULATORY RESTRICT!ON-4 - OTHER (EXPLAIN)
FILE.(NUREG-0161<
E OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)
G
- OPERATIONAL ERROR (EXPLAIN)
H - OTHER(EXPLAIN)
~ EXHIBIT ! - SAME SOURCE t
1
1
)
4.
I l
I
+
UNIT SHUTDOWNS AND POWER REDUCTICNS DOCKET NO. 50 - 278 UNIT NAME PEACH BOTTOM UNIT 3 DATE DECEMBER 13,1993-REPORT MONTH NOVEMBER, 1993 COMPLETED BY PHILADELPHIA htECTRIC COMPANY W. J. JEFFREY PERFORMANCE E RELIABILITY SITE ENGINEERING PEACH BOTTOM ATOMIC POWER STATION TELEPHONE (717) 456-7014 EXT. 4027 j
METHOD OF LICENSEE l SYSTEM COMPONENT l CAUSE AND CORRECTIVE l
TYPE DURATION ' REASON SHUTTING DOWN EVENT l CODE CODE l ACTION TO NO.l DATI (1)
(HOURS)
(2)
REACTOR (3)
REPORT # l (4) l (5) l PREVENT RECURRENCE I
l t
i 21 931101 1 S 338.0 C
1 N/A ZZ l ZZZZZZ UNIT 3 NINTH REFUELING OUTACE 22 931115 Sl 0.0 H
4 N/A ZZ ZZZZZZ POWER ASCENSION AFTER UNIT 3 STARTUD 23 931119 F
7.0 A
4 N/A CB PUMPXX RECIRC PUMP V!BRATICN ALARM REACTOR NOT SHUTDOWN 24 931128 F
49.0 A
4 N/A RC ACCUMU 0-RING FAILURE ON HCU ACCUMULATOR j
REACTOR NOT SHUTDOWN l
n i
394.0 l
F (1)
(2)
(3)
(4)
F - FORCED REASON METHOD EXHIBIT G
- INSTRUCTIONS 9
S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 MANUAL FOR PREPARATION OF DATA B MAINTENANCE OR TEST 2 - MANUAL SCRAM.
ENTRY SHEETS FOR LICENSEE C - REFUELING 3 AUTOMATIC SCRAM.
EVENT REPORT (LER)
D + REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)
FILE (NUREG-0161)
E OPERATOR TRA!NINa + LILENSE EXAMINATION F ADMINISTRATIVE (5)
G - OPERATIONAL ERROR (EXPLAIN)
H
- OTHER(EXPLAIN)
EXHIBli ! - SAME SOURCE E
5
-