Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20056D769 + (ML20056D769)
- ML20056D771 + (ML20056D771)
- ML20056D772 + (ML20056D772)
- ML20056D776 + (ML20056D776)
- IR 05000445/1993028 + (ML20056D777)
- 05000327/LER-1993-019, :on 930713,containment Isolation Occurred Due to Inaccurate Drawing Used to Develop Clearance Boundary. Returned Valves to Normal Positions & Restored Sys Air Pressure + (ML20056D778)
- ML20056D786 + (ML20056D786)
- NRC-93-0086, Monthly Operating Rept for Jul 1993 for Fermi 2 + (ML20056D790)
- ML20056D793 + (ML20056D793)
- IR 05000382/1993022 + (ML20056D796)
- ML20056D797 + (ML20056D797)
- ML20056D798 + (ML20056D798)
- IR 05000285/1993011 + (ML20056D802)
- 3F0893-04, Forwards fitness-for-duty Program Performance Data for Period of Jan-June 1993,per 10CFR26 + (ML20056D803)
- ML20056D805 + (ML20056D805)
- 3F0893-06, Submits Description of Unsatisfactory Chemical Testing results.Follow-up Lab Investigation Revealed That Error Due to Failure of Instrument to Pick Up Correct Amount of Urine Specimen,Causing Low Creatinine Value & Negative Results + (ML20056D808)
- ML20056D809 + (ML20056D809)
- ML20056D811 + (ML20056D811)
- ML20056D812 + (ML20056D812)
- ML20056D814 + (ML20056D814)
- ML20056D815 + (ML20056D815)
- ML20056D816 + (ML20056D816)
- ML20056D817 + (ML20056D817)
- ML20056D818 + (ML20056D818)
- ML20056D819 + (ML20056D819)
- ML20056D820 + (ML20056D820)
- ML20056D821 + (ML20056D821)
- PNO-IV-93-023, on 930810,reactor Scram Occurred Due to MSIVs Going Closed.Licensee Initiated Task Team to Review Event & Develop Action Plan to Address Turbine Control Problems. State of Louisiana Informed + (ML20056D822)
- ML20056D823 + (ML20056D823)
- ML20056D824 + (ML20056D824)
- 05000254/LER-1993-009-04, :on 930714,SBGT Methyl Iodide Test Failed Due to Age of Charcoal Combined W/Stringent Test Criteria. Replaced Charcoal Absorber in Both Trains of Sbgt + (ML20056D825)
- ML20056D826 + (ML20056D826)
- ML20056D827 + (ML20056D827)
- ML20056D828 + (ML20056D828)
- ML20056D829 + (ML20056D829)
- ML20056D830 + (ML20056D830)
- 05000336/LER-1993-014, :on 930714,discovered Surveillances Procedures Had Not Been Performed within Specified Time Intervals Due to Insufficent Planning.Missed Surveillances Immediately Performed + (ML20056D831)
- ML20056D832 + (ML20056D832)
- ML20056D834 + (ML20056D834)
- 3F0893-05, Monthly Operating Rept for Jul 1993 for Crystal River,Unit 3 + (ML20056D835)
- 05000245/LER-1993-006-01, Forwards Updated LER 93-006-01 Which Was Previously Submitted W/O Rev Bars + (ML20056D836)
- ML20056D840 + (ML20056D840)
- 05000245/LER-1993-006, :on 930604,dicovered Unsealed Fire Barrier Penetration in TS Fire Wall Due to Lack of Detailed Guidance Re Procedure Used in Insp.Established Fire Watch to Compensate for Unsealed Penetrations + (ML20056D841)
- ML20056D842 + (ML20056D842)
- NRC-93-0098, Forwards Rev 22 to Fermi 2 Physical Security Plan,Per 10CFR50.54(p)(2).Plan Withheld + (ML20056D843)
- NRC-93-0099, Submits Rev 10 to Fermi 2 Security Personnel Training & Qualification Plan,Per 10CFR50.54(f)(2).Plan Withheld + (ML20056D844)
- ML20056D845 + (ML20056D845)
- ML20056D846 + (ML20056D846)
- ML20056D849 + (ML20056D849)
- ML20056D850 + (ML20056D850)
- ML20056D851 + (ML20056D851)