Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-82-265, Forwards Info Re Effects of Pressure on Equipment Survivability.Evaluation Has Shown No Deleterious Effects on Equipment from Pressure Resulting from Calculated Hydrogen Burn Analysis Previously Submitted + (ML20054E756)
- ML20054E757 + (ML20054E757)
- ML20054E758 + (ML20054E758)
- ML20054E759 + (ML20054E759)
- ML20054E760 + (ML20054E760)
- ML20054E761 + (ML20054E761)
- ML20054E763 + (ML20054E763)
- B10522, Forwards Revision 2 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790) + (ML20054E764)
- ML20054E765 + (ML20054E765)
- ML20054E766 + (ML20054E766)
- ML20054E767 + (ML20054E767)
- ML20054E768 + (ML20054E768)
- AECM-82-186, Forwards Proof & Review Copy of Proposed Revision to Tech Specs Re Drywell post-LOCA Vacuum Breakers & Supporting Justification + (ML20054E769)
- ML20054E771 + (ML20054E771)
- ML20054E772 + (ML20054E772)
- ML20054E773 + (ML20054E773)
- ML20054E774 + (ML20054E774)
- AECM-82-255, Forwards Proof & Review Copy of Proposed Changes to Tech Specs Re Reactor Protection Response Time + (ML20054E775)
- ML20054E777 + (ML20054E777)
- ML20054E778 + (ML20054E778)
- AECM-82-247, Forwards Addl Tech Spec Waivers Required for Phase I Operations Which Consist of Low Power Testing & non-nuclear Heatup + (ML20054E779)
- AECM-82-272, Forwards Response Spectra for Comparison of Design Basis Pool Swell Impact Ars (15 Psi Peak Impact pressure,100 Msec Impulse Duration) W/Variable Pool Swell Impact Ars (11.5 Peak Average Impact pressure,100 Msec Impulse Duration) + (ML20054E780)
- ML20054E781 + (ML20054E781)
- ML20054E783 + (ML20054E783)
- ML20054E786 + (ML20054E786)
- ML20054E788 + (ML20054E788)
- ML20054E790 + (ML20054E790)
- ML20054E791 + (ML20054E791)
- ML20054E792 + (ML20054E792)
- ML20054E794 + (ML20054E794)
- AECM-82-263, Provides Current Analysis Re PMP Site Drainage.Barriers Are Necessary to Prevent or Minimize Inleakage Into safety-related Bldgs + (ML20054E796)
- ML20054E797 + (ML20054E797)
- ML20054E798 + (ML20054E798)
- ML20054E799 + (ML20054E799)
- ML20054E800 + (ML20054E800)
- ML20054E801 + (ML20054E801)
- ML20054E802 + (ML20054E802)
- ML20054E803 + (ML20054E803)
- ML20054E805 + (ML20054E805)
- ML20054E806 + (ML20054E806)
- ML20054E807 + (ML20054E807)
- ML20054E808 + (ML20054E808)
- ML20054E809 + (ML20054E809)
- ML20054E811 + (ML20054E811)
- ML20054E812 + (ML20054E812)
- ML20054E813 + (ML20054E813)
- ML20054E814 + (ML20054E814)
- ML20054E815 + (ML20054E815)
- ML20054E816 + (ML20054E816)
- ML20054E817 + (ML20054E817)
- ML20054E818 + (ML20054E818)