Public Version of Revision 1 to Emergency Plan Procedures PMP 2081 EPP.005 Re Personnel Evacuation & PMP 2081 EPP.021 Re Activation & Operation of Operations Staging Area & Personnel Accountability
ML20054E817
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/25/1982
From: Duffy J
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B364 List:
References
PROC-820525, NUDOCS 8206140280
Download: ML20054E817 (14)


Text

.-....a---..~.-.-.-.. . - . - . - . . - - - . . _ ~ . . . ..

INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT 3

PROCEDURE COVER SHEET Prdre No. PMP 2081 EPP.021 Revision No. 1 N ACTIVATION AND OPERATION OF THE OPERATIONS STAGING AREA (0SA) AND PERSONNEL ACCOUNTABILITY SCOPE OF REVISION Rev. 1: Incorporated Temporary Sheet #1. Changed SOE to SS.

,s SIGNATURES ORIGINAL Rev.1 REV.2 Rev.3 PREPARED BY hu/

QU ASSURANCE ~

INTERFACING DEPARTMENT / /' O' HEAD CONCURRENCE

( f N.A. / ((N. A .

/

DEPARTMENT HEAD APPROVAL N.A, j(/, A ,

PLANT NUCLEAR <

/f- ,

SAFETY COMMITTEE j /f ',,

PLANT MANAGER APPROVAL hI- _

2 (f{I/ - g N DATE OF ISSUE 3-31. 81 I4I-7k Forms A PW3 2001- mzy. 3 8206140280 820608 F

PDR ADOCK 05000315 ppy

,l -' 7. .L. . "

~ ~ -

~

..L .; .;. _Z; T .._.. _.Z_ w. C _;" 7. _ .

PMP 2081 EPP.021 v- LIST OF EFFECTIVE PAGES

.) 1 Page Numbers Revision Number and Date Page 1 of 4 Revision 0 - 4/1/81

- Page 2 of 4 Revision 1 - 5/25/82 Page 3 of 4 Revision 0 - 4/1/81 Page 4 of 4 EXHIBIT A Revision 1 - 5/25/82 l

l ,

l l

a l

s'

{

4 i

l i

O Page 1 of 1 Rev. 1, 5/25/82

. . ,=_=_. _ _ _=m7_y _g ._ __ _mm= mm- _-_ _ _ _

.. .1 PMP 2081 EPP.021 s

i i

! INDIANA & MICHIGAN ELECTRIC COMPANY l DONALD C. COOK NUCLEAR PLANT

[7 C ACTIVATION AND OPERATION OF THE OPERATIONS

! STAGING AREA (0SA) AND PERSONNEL ACCOUNTABILITY I

1.0 OBJECTIVES

}

l This procedure covers those actions to be performed in the Operations

Staging Area (05A) during the short-term, 0-24 hours after the emergency is  !
declared, and the long-term, from 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the time when the Alert, Site  ;
Emergency, or General Emergency conditions are no longer met and the OSA is -

i i deactivated.

l 2.0 RESPONSIBILITIES j The Operations Staging Area Manager (0 SAM) is responsible to coordinate l

)

with the Control Room and Technical Support Center (TSC) as necessary to ensure that a sufficient number of qualified emergency personnel are available i j when needed and to conduct personnel accountability actions described herein.

) 3.0 INSTRUCTIONS

f 1

3.1 The OSAM shall, in the f irst 0-24 hours of the activation of the

OSA, ensure that the fr.llowing actions are taken

[ 3.1.1 Request that Radiation Protection Director (RPD) to 1] evaluate habitability of OSA facility.

3.1.2 Establish comunications with the Control Room and the TSC.

$ 3.1.3 Ensure that all on-site personnel are accounted for utilizing the following procedures:

3.1.3.1 Receive computer listing of personnel locations i

within the Protected Area and visitor registers i from DCCNP Security.

i NOTE:

! IT IS PROBABLE THAT ACCURATE LISTINGS REGISTERS WILL NOT BE AVAILABLE TO OSAM SOONER THAN 15

' MINUTES AFTER EVACUATION NOTIFICATION BECAUSE 0F THE NEED TO ALLOW SUFFICIENT TIME FOR PERSONNEL EVACUATION FROM WORK AREAS TO l ASSEMBLY AREAS.

t i

l i

l r

Page 1 of 4 Revision 0, 4-1-81

-- . e _ _ > l

_ . - . . . . _ _- _ . ~ . . .. _ _ . . . _ . _ . . -__ _. .

Ptf 2081 EPP.021 3.1.7 Communicate personnel requirements to the I-94 Gate

', House and Stevensville Assembly Areas, as necessary.

3.2 The OSAM, in coordination with the Recovery Center Manager,.

shall ensure that the following actions are taken during the long-term, i.e., any time greater than 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s:

3.2.1 Continue to assess and categorize emergency-qualified persoanel resources.

l 3.2.2 Continue to maintain the emergency-qualified j personnel resources status log, as in 3.1.6.

i  :

i 3.2.3 Continue coordination with I-94 Gate House and i Stevensville Assembly Areas, as in 3.1.7. ,

3.3 The OSAM shall, upon notification that the emergency has  !

] been terminated, begin the deactivation of the OSA.

l I

I l

'i i (f) v l

l l

I l

I I

i Page 3 of 4 Revision 0, 4-1-81 j i

- - _= = -

- __ - - = - - . . .. - - - - - - - i

~ . . --

T .:- - - - - . .. . _. . . _ . . . . . . . . . . . . - .. . . . _ . _

l PW 2081 EPP.021 EXHIBIT A I

EMERGENCY ACCOUNTABILITY FORM i

Assembly Area Initials /Date l The following personnel have not reported to me within an estimated reasonable f time.  ;

Name *POSSIBLE LAST LOCATION .

i  !

i 1. l t

2. l 1  !

l 3. 1 4 1 l 4 i

J

5.  !

6.

7.

i f. m L) 8*

i 9.

10.

I ll 11.

I 12.

f *If unknown, write "UK" ACCOUNTABILITY INCOMPLETE /

l NOTIFIED CONTROL ROOM Assemoly Area Leader Time ACCOUNTABILITY COMPLETE /

NOTIFIED CONTROL ROOM Assently Area Leader Time When completed, give this sheet to the OSEC/.SS or the Emergency Security Team Leader at the Security Control Center i

l Page 4 of 4 l Revision 1, 5/25/82 j

l

_ _ _ _ . _ =- . , _ _ _ _ _ _ _ _  ;

- -- FL -.-- ---

' INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET i

l Procedure No. PMP 2081 EPP.005 i

Revision No. 1 T.TLE PERSONNEL EVACUATION SCOPE OF REVISION Rev. 1: Changed SOE to SS.

l l

I '.

SIGNATURES ORIGINAL Rev.I REV.2 Rev.3 PREPARED BY hg ~

QUALITY ASSURANCE d REVIEW INTERFACING DEPARTMENT [ O' // #

HLAD CONCURRENCE V N.A. / gi 4, _

DEPARTMENT HEAD APPROVAL N.A. ',A, g

PLANT NUCLEAR - .b SAETY COMMTITEE & g,.) ,

PI).NT MANAGER APPROVAL h-r -

77i ghg T

.3_

DATE OF ISSUE 3-31-81 g-4g-g4 V

r== % ne sexa. uv. :

- ~

I ... _ ._.m. . . _ - . . . .. ,. .. . .. - y, Ug. 327 . p.

\rx

.. w _..,

2 a.-

4

- ~ ~ ',3; 4

~ (;

i PMP2081EN.001.--aN

.f i 3

,. s .

LIST OF EFFECTIVE PAGES - ~^ '

4 g.

s Page Numbers Revision Number and D$te '

+

+

Page 1 of 6 Revision 1 - 5/25/82 . .r . h '

Page 2 of 6 Revision 1 - 5/25/82 -

Page 3 of 6 EXHIBIT A Revision 0 - 4/1/81 .-

Page 4 of 6 EXHIBIT B Revision 0-4/1/91 .

Page 5 of 6 EXHIBIT C Revision 0 4/1/81. .

Page 6 of 6 CHECKi.IST Revision 1. '5/25/82 t ..

. s .

. t ,

, a.

), .

. ; [ x. ~i' -

'l{;y

~

q

.i -

N v , 1 t -

} , ,

,' ) > b

( \

g' g

+ -

-4 ,5 s t '%  : s.

-," .,, - [

s.

s ,..

3- i

. s

i. \

s ,-

1

\

a *

\x 3 b

( gr t w

< 1 s i t '- ,

, y,- Q

.,' ,b . .

_5 +%  %

.' ^,

b s' .

h

, I

'3 ,3 s + .

3 s-x  :-k. i t

/ I e c

, x. , ,

a,,,,

s s -

Page 1 of 1 ,' J e Rev. 1, 5/25/82,

\

\

w . __ -. -_ _

l_s

k. E i . . ._. -....a. - - - - . - . . . - . . . . . - . . . - . . - - . . . . . - - .

PMP 2081.EPP.005 INDIANA & MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT PERSONNEL EVACUATION 1.0 OBJECTIVES This procedure describes the actions necessary to assure safe and expeditious evacuation from local work areas to predesignated on-site assembly areas and to alternate off-site reassembly areas, if necessary.

2.0 RESPONSIBILITIES The Shift Supervisor (SS) On-Site Emergency Coordinator (OSEC) is responsible for determining the need for initial evacuation to on-site assembly areas.

The Radiological Assessment Director (RAD) in coordination with the Radiation Protection Director (RPD) is responsible for recommending further evacuation requirements to off-site reassembly areas based on radiologicai assessment and/or projections.

All personnel at DCCNP are responsible for knowing evacuation routes from assigned working areas; knowing the locations of their designated

.. assembly areas and reporting to their designated assembly area when

/s directed.

)

} The Emergency Security Team is responsible to assist and support evacuation operations as requested by SS/0SEC.

3.0 INSTRUCTIONS # OPTIONAL CHECKLIST ENTRY PROVIDED

' , # 3.1 The SS/0SEC shall

3.1.1 Determine need for evacuation of site personnel using criteria contained in EXHIBIT A, AFFECTED AREA EVACUATION CRITERIA.

,' l 3.1.2 Initiate evacuation notification.

' - #s 3.2 The RPD shall:

3.2.1 Initiate monitoring activity of TSC and OSA as soon as

. possible after evacuation notification to determine 5 habitability of pre-designated on-site assembly areas
u shown in EXHIBIT B, PLANT ASSEMBLY AREAS FOR ON-DUTY
s PERSONNEL AND REPORTING 0FF-DUTY PERSONNEL.

3.2.2 Report all pre-designated on-site assembly areas that

, are unhabitable to SS/0SEC.

s

() .

Page 1 of 6 Revision 1, 5/25/82 I .

('. .

[',

PMP 2081 F'

'I 95-

! EXHIBIT A l AFFFCTED AREA EVACUATION CRITERIA l .

l. ,

v

!; I i OUTSIDE AFFECTED AREA INSIDE AFFECTED AREA l, Essential Personnel

] Unessential-Personnel ,I-q Precautionary Release of Personnel ,

1 i Dose Rate (mrem /h) 0.5 (1asting 10h) 2.5 1000(a) j (unanticipated)

Airborne Aqtivity 1.0E - 10(b) 9.0E - 09 3.6E - 07(c)

(uC1/cnd) -

unevaluated(d) t

'l .

l-Notes: (a) As deemed necessary, the OSEC may elect to utilize higher dose rates for emergency response personnel for life-saving and facility saving actions based on pre-planned occupational radiation exposures under emergency conditions. Assessment actions should be planned within regulatory and administrative exposure limits. (See EPP 2.7).

(b) Equal to 25% of weekly limit (unrestricted area).

(c) Equal to 40 WC/h unevaluated. Respiratory protection should be utilized unless unfeasible.

i h (d) Equal to 520 MPC/h unevaluated (Quarterly Limit 10CFR20.103(a)(1)). Respiratory protection should be utilized unless unfeasible.

1

.I l

I 1

I Page 3 of 6 Revision 0, 4-1-81 i i'

r' , PMP 2081 EPP

~

i EXHIBIT 8 3 PLANT ASSEMBLY AREA FOR ON-DUTY PERSONNEL AND REPORTING 0FF-DUTY PERSONNEL Control Room Technical Support Operations Staging Security Control 81 ( Affected Unit) Center Area Center i.

'q

  • Plant Manager
  • Techn. Support Mgr.
  • Maintenance Supt.
  • Emergency Security
  • SS Asst. Plt. Mgrs. All others within Team Leader
Operations Supt. Techn. Supt. Protected Area SAS personnel Shif t Techn. Advisor Plt. Chem. Supv. excluding SAS Peronnel Emergency Security Prod. Supv. Operations Pl t. Rad Prot. Supv. (Security) Team '

(affected unit) NRC Repr. 2 Escort Personnel

, On-Shift Operators Westinghouse Repr. 1 .

Prod. Supv. Operations (unaffected unit) '

Plant C&I Engr. j Emergency News Source Perf. Supv. Engr.

(Energy Information Envir. Supv. l Center) Prod Supv. Techn. Off-Duty Personnel Should Report Avail. ST Advisors to Primary (or Alternate) , r 3

Assembly Area, as Directed I a

  • Mgr. Cook Nuclear Ctr.

c EIC Employees EIC Visitors Alternate Primary Stevensville I-94 Gate House .

Substation  :

i; ill:

Directors (of fersonnel resources) h I

4 5

j Page 4 of 6 ,

j Revision 0, 4-1-81 [:

I

[ _ _ -.

_ . - . . __ - ... . _. ' _ _ . _. _.. a _

I PMP 2081 EPP.005 EXHIBIT C OFF-SITE REASSEMBLY AREAS Reassembly Area One Proceed east along the main entrance road and reassemble- across Red Arrow Highway along main access road.

Reassembly Area Two Proceed north along Lake Michigan and i reassemble on the beach at the plant

property line or Rosemary Road.

j Reassembly Area Three 1

l Proceed south along Lake Michigan Beach i and reassemble on the Beach at the end

{ of Livingston Road.

i 4

i
. )

4 4

4 r

f

'%}-

Page 5 of 6 -

Revision 0, 4-1-81

,=,..__ _ - - . . _ c.- m _ -

, PMP 2081 EPP.005 CHECKLIST PMP 2081 EPP.005 PERSONNEL EVACUATION 3.1 SS /OSEC Determine need for evacuation: /

initials time 3.2 Personnel movement to designated Assembly Areas: /

initials time 3.5 Move to Off-Site Reassently Areas if appropriate: /

initials time

.)

Page 6 of 6 Revision 1, 5/25/82

- - - . -r w , .

. = _ . n. . : :- - --. ,

k

rc_ . w _ -_ . . . - - . .

- ..-..-.__ _ . ____.s- . . . - . . . . . . . . . . ~ . . _ . . _ . . - . .

. DNP r.PP INDEX IllDIANA & MICHIGAN POWER COMPANY DONALD C. C00X MUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Ti tle evision Nc.I Cements Number And Oate l PMP 2091 EPP.001 Emergency Telephone Revision 0 Communica tions 4-1-81 EPP.002 Barring of the PABX Revision 0 4-1-81 EPP.003 Follow-Up Off-Site Revision 0 TP-1,4-30-82 Exp NA Communications 4-1-81 EPP.004 Protective Action Guides Revision 0 (PAGs) and Protective Actions 4-1-81

. EPP.005 Personnel Evacuation Revision 1 j 5-25-82 EPP.006 Activation of the Reentry Revision 0 and Rescue Team 4-1-81 EPP.007 Security Actions During Revision 1 Emergency Conditions 5-5-82 EPP.008 Emergency Medical Plan Revision 0 Guidelines 4-1-81 EPP.009 Health Physics Procedures Revision 0 l 4-1-81 EPP.010 Activation of Radiation Revision 0 Monitoring Teams a-1-81 EPP.011 On-Site Radiological r<e v is . n 0 Monitoring 4-1-81 EPP.012 Off-Site Radiological Revision 0 TP-1,2-25-82 Exp N/A Monitoring 4-1-81 EPP.013 Environmental Monitoring Revision 0 TP-1,2-25-82 Exp N/A and Analysis 4-1-81

? age 2 Rev. Oata 3-Alo-?&

, ,. --~.- a .,n .w-+ aw=s . --

-= ~--

+- -

, , , . ~ . .. .-.n; . ..

=.: ---

Y **

PMP EPP INDEX INDIANA & MICHIGAN ?OWER COMPANY-DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Ti tle RevisionMc.! Cc.Tcents Number And Oate !

l PMP 2081 EPP.014 Off-Site Dose Assessments Revision 0 TP-1,2-25-82 Exp N/A 4-1-81 EPP.015 Sampling and Analysis of ~

Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EPP.017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transportation Accidents Revision 0

} Involving Radioactive 4-1-81 Material EPP.019 AEP Emergency Response Revision 0 Organization Activation and 4-1-83 Management EPP.020 Activation and Operation of Revision 0 TP-1,11-16 .81 Exp N/A the Technical Support Center 4-1-81 TP-2,3-12-82 Exp N/A (TSC) TP-3,3-12-82~Exp N/A EPP.021 Activation and Operation of Revision 1 the Operations Staging Area 5-25-82 (05A) and Personnel Accountability EPP.022 Activation and Operation of Revision 0 the Recovery Center (RC) (An 4-1-81 Emergency Operations Facility)

EPP.023 Activation and Operation of Revision 0 TP-1,4-30-82 Exp N/A the Emergency Control Center 4-1-81 (ECC) (An Emergency Operations Facility)

EPP.024 Activation and Operation of Revision 0  !

dc- the Joint DJblic Information 4-1-81 1 1 Center (JPIC) (An Emergency

.0perations Facility) p3gg. 3 Rev. Cata E-flo 4 2.

Y m- v'~, =

'W"

[" w. ' ~

,W '