ML20054E799

From kanterella
Jump to navigation Jump to search
Forwards Franklin Research Ctr Requests for Addl Info Re Equipment Environ Qualification Program.Response Requested within 30 Days
ML20054E799
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/07/1982
From: Stolz J
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
IEB-79-01B, IEB-79-1B, NUDOCS 8206140253
Download: ML20054E799 (20)


Text

'

l l

JUNE 7 1982

)M h

DISTRIBUTION r~Uocket Fi y f4KL PUK L PDR GRB#4 Rdg DEisenhut Dockets flos. 50-277 and 50-278 IE ACRS-10 MFairtile lir. Edward G. Bauer, Jr.

Vice President and General RIngram Gray File Counsel JCalvo Philadelphia Electric Company PShemans ki 2301 Market Street Philadelphia, Pennsylvania 119101

Dear Mr. Bauer:

In order to complete our review of the Peach Bottom Units 2 and 3 Equipment Envirornental Qualification Program we need responses to the enclosed requestsffor additional infonnation. These questions are based on the data you submitted to Franklin Research Center, through HRC, on May 21, 1982 Th e questions were prepared by FRC.

!!ote the options on page 7 of the enclosures regarding submittal of your responses.

Kindly submit the requested information within 30 days of receipt of this letter.

Sincerely,

']IGU.~AL Sic:iz9 37

  • M F. SIOLzs,,..

John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing

Enclosure:

Request for Additional Information cc w/ enclosure:

See next page s206140253 920607 PDR ADOCK 03000277 p

PDR t/M 7 ORB #,3:D(.

.C 0.,

  1. 4,1,D,L,,,

4 ornec>

suanwc > MEair. tile cf...J S.t L :t....

...4../.82 6/..).*./.82 6/

om>

OFFIClAL RECORD COPY us e mi.- m uo FORM 318 (10-80) NRCMc m

Philadelphia Electric Company Ocw/ enclosure (s):

Eugene J. Bradley Philadelphia Electric Company Regional Radiation Representative Assistant General Counsel EPA Region III 2301 Market Street CurtisBuilding(SixthFloor)

Philadelphia, Pennsylvania 19101 6th and Walnut Streets Philadelphia, Pennsylvania 19106 Troy B. Conner, Jr.

1747 Pennsylvania Avenue, N.W.

M. J. Cooney, Superintendent Washington, D. C.

20006 Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Government Publications Section Thomas A. Dcming, Esq.

State Library of Pennsylvania Assistant Attorney General Education Building Department of Natural Resources Comonwealth and Walnut Streets Annapolis, Maryland 21401 Harrisburg, Pennsylvania 17126 Philadelphia Electric Company ATTN: Mr. W. T. U11 rich Peach Bottom Atomic Power Station Mr. R. A. Heiss, Coordinator Delta, Pennsylvania 17314 Pennsylvania State Clearinghouse Governor's Office of State Planning Albert R. Steel, Chainnan and Development Board of Supervisors P. O. Box 1323 Peach Bottom Township Harrisburg, Pennsylvania 17120 R. D. #1 Delta, Pennsylvania 17314 Curt Cowgill U.S. Nuclear Regulatory Comission Office of Inspection and Enforcement Peach Bottom Atomic Power Station P. O. Box 399 Delta, Pennsylvania 17314 Mr. Ronald C. Haynes, Regional Administrator U. S. Nuclear Regulatory Consission, Region I Office of Inspection and Enforcement 631 Park Avenue King of Prussia, Pennsylvania 19406

td. 6/7/82 REQUEST FOR ADDITIONAL INFORMATION to PEACH BOTTOM UNIT 2 j

RAI-C5257-493 Rev. 4, May 28, 1982 AACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment t

environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualificatioa Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited The to safety-related equipment potentially exposed to a harsh environment.

results will be presented in the form of a technical evaluation report for each plant'.

This request for additional information (RAI) is the result of an evalua-tion of the information provided by letters dated September 1,1981 [1] and January 30, 1981 (2].*

FRC previously requested 'DiI Action Plan information 27, 1981 [3,4,5].

by telephone memoranda dated August 7, August 17, and August In response to the FRC request, Philadelphia Electric Co. (PECO) delivered the following to FRC on August 12, August 26, and August 27, 1981:

a Peach Botton Unit 2 Class lE equipment list marked to identify 1.

environment during normal operation, NUREG-0737 requirement, 'and 4

approximate installation date 2.

Rockbestos Qualification Report, March 15, 1979 l

3.

Target Rock Corporation Letter to Bechtel, May 13, 1980 J

Target Rock Corporation Report 2302, Rev. C 4.

i I

5.

Target Rock Corporation Report 2375, Rev. A 3

li 6.

East West Technology Report 89405-9 i

I 7.

East West Technology Report 92906-9 f

8.

Target Rock Corporation Report 2192C

  • Numbers in brackets refer to citations found in the list of references, t

~

_ O 0000 Franidin Research Center s - a m r,~

an. u.

y

_w-n.

m-,-

7,

-n.

RAI-C5257-493 Rev. 4, May 28, 1982 9.

Target Rock Corporation Report 2005C 10.

Normal radiation dose for applicable areas 11.

Report Titled " Summary of EELB Calculation for the MSLB in the Main Steam Tunnel for Peach Botton Project," October 9, 1980 12.

Clarification of radiation dose values and MSLB within containment.

On February 25, 1982, FRC received PECO's submittal of additional qualification information dated February 11, 1982 (91 concerning iustification for continued operation.I '

stated that it will supply the recuested information for FRC review et the PECO offices. FRC notes that review of requested information at a licensee's headquarters is not part of FRC's contract scope.

On May 20, 1982, PECO transmitted the information requested in thg previous revision of this RAI with the exception of Items B.1, B.2, B.3 (T4I Action Plan Information) (111."'

A.

FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER INFORMATION REQUESTED DATE RECEIVED BY FRC***

I 1.

In reference to the Licensee's 90-day response

}

(1) to the NRC SER [6], a legible single copy' of each of the following qualification documents is requested in crder that the FRC evaluation may proceeds (Numbers in ' parentheses correspond to the reference namber contained in Reference 1.)

a (2).

G. E. Co. Cover Letters G-EE-8-198 and 5/21/82 (11](4)

G-EE-9-106 i

b (7).

G. E. Co. Cover Letter G-EE-8-lS3 5/21/82 (111(4)

  • *Throughout the text, superscript ttabers in parentheses indicate the revision in which the underlined material preceding the superscript was added.
      • This column will be completed by FRC as the requested information is laceived.

' l

-<t3>s ddu FrankDn Resea.rch Center 4 S a.m. r,.,

wou.

  • s*

6

I RAI-C5257-493 I

Rev. 4, May 28, 1982 DATE RECEIVED BY FRC***

c(9).

G. E. Co. Cover Letter G-HE-8-54 5/21/82 fill (4) d(10). Vender Print 96280-E40-124-1 5/21/82 fill (4) e (13). G. E. Co. Cover Letter G-HE-7-154 5/21/82 till(4)

(FDI-123) f(28). Bechtel Power Corporation Study 5/21/82 till(4)

BLP-21921, 7/31/81 g(30). Special Study-Operating Requirements 5/21/82 fill (4) for Safety-Related Equipment Inside the Drywell Post-LOCA Letter 1/5/79 T. J. Scull to J. J. Ferencsik h(35)

G. E. Co. Environmental Qualification 5/21/82 fill (4)

Test Summary-NSE79023 i(43). G. E. Co. Environmental Qualification 5/21/82 fill (4)

Test Summary-NSE80010 j(49). Rockbestos Company letter from G. S.

5/21/82 fill I4)

Buettner to J. J. Ferencsik l

k(55). Amerace Letter to N. J. Wood, 5/13/80 5/21/82 fill _(4) 1(56). Amerace Spec. EGP.

5/21/82 fill (4) m(57). GECO licensing topical 5/21/82 fill (4) report-NEDO-21617-A.

n(58). GECO data sheet 22A1378AB.

5/21/82 fill (4) o(59). EDIA letter to W. W. Bowers (3/15/77) 5/21/82 fill (4) and Telecon to Mr. Ryland of EI.MA (2/25/80),

p(60). Viking test report 630592 and Telecon 5/21/82 fill (4) to L. Hane of Topaz (6/7/76).

q(61). Limitorque letter to W. H.

S/21/82 till(43 VanBuskirk 2/22/80.

e (62). BLP 21586 PBAPS Environmental 5/21/82 fill (4)

Conditions IDCA temperatures.

BLP 21606 PSAPS Environmental 5/21/82 fill (4)

Conditions HELB temperatures.

3-030!! Franklin Research Center m e atn.n m.aue y

~ -

r

,~-__m

RAI-C5257-493 Rev. 4, May 28, 1982 DATE RECEIVED BY FRC***

s(63). BLP 21544 PBAPS Environmental 5/21/82 (111(4)

Conditions Radiation dose study.

t(65). PBAPS MAX LOCA/HELB pressures.

5/21/82 fill (4) 5/21/82 (111(4) u(66). ASCO letter to W. H.

VanBuskirk, 6/6/80.

v(68). Rosemount Test Report fl277D 5/21/82 [111(4) w(71).

Letter from S. L. Daltroff to B. H.

5/21/82 fill (4)

Grier (NRC),1/29/79.

x(73).

BLP-21679, Equipment TID 5/21/82 (111(4) y (7 5). QSR 002-A-01, 002-A-02.

5/21/82 f111(4)

]

z (76). Rosemount Analysis, 10/20/80.

5/21/82 (111(4) aa(77). ASCO Analysis (Thermal), 10/20/80.

5/21/82 fill (4)

I bb(78). ASCO Analysis (Humidity), 10/20/80.

5/21/82 (111(4) cc (79). GECO'NEDO-10698 5/21/82 till (4) dd(80).

Physical Sciences Analysis, 10/20/80 5/21/82 fill (4) ee (81). GECO Specification 22A2928 Rev. 1.

5/21/82 (11]I4) 8 i

f f (82).

SLD Analysis, 10/21/80 5/21/82 fill (4)

Received 3/9/82 for gg (83). QSR-080-A-01 Task 500 LJ) j

.I i

hh(84). Target Rock Corporation Analysis, 5/21/82 (111(4) 10/22/80 j

11(85).

Bechtel Specification 6280-M-242 5/21/82 (11](4) j j (86). Delphi Catalog 201-A 5/21/82 (111(4)-

5/21/82 till(4) kk(88). QSR-027 5/21/82 (111(4)

.11(89). QSR-037 Received 2/12/02_

mm(90). QSR-029-A-01 for Task 495tJJ

~4~

g%

[d",, MS/.*d,3f'",.*

4 j

RAI-C5257-493 Rev. 4, May 28, 1982 g

DATE RECEIVED BY FRC***

f I

nn(91). QSR-032-A-01 seceived 3/9/82 for Task 500 W i

oo (9 2). UL-510 5/21/82 (111(4) pp(93).

3M Research Report-3410175001-003 5/21/82 (111(4) qq (94). 3M Report 54C3082 5/21/82 till(4) 4 rr(95).

QSR-lli 5/2D82 fill (4) ss(96). Agastat Analysis, 10/27/80 5/21/82 (111(4) tt (10 2). ASCO Letter to W. H. VanBuskirk, 5/21/82 [111(4) 12/30/80 uu(108). QSR-015 5/21/82 [111(4) vv(110). Calculation IE-514-3 5/21/82 [111(4) w (lll).

Reliance Electric Supplemental 5/21/82 {111_ (4 )

Report (NUC-9) xx (112).

Reliance Motor Analysis (Pressure 5/21/82 [ill (4) and Radiation), 7/7/81 yy (ll4). Ambient Pressure Transient Effects 5/21/82 fill (4) on ECCS Pump Motors 22(115).

Ambient Pressure Transient Effects 5/21/82 [111(4) on ECCS Pump Motors aaa (ll6).

Agastat Relay Analysis 5/21/82 [111_(4) i (63-0400-1 thru 20)

)

bbb (ll7).

Post-LOCA Humidity Conditions -

5/21/82 (11]I4)

'i BLP-21730, 11/12/80 ccc (118).

Agastat GP Relay Temperature Analysis 5/21/82 [11](4) i ddd (119). Limitorque Actuator Post-Accident 5/21/82 {11](4)

Operability Analysis-Secondary Containment 4

'l t

i Udd!i Franklin Research Center A Dres on of The Freenkn insttwo

~

^ '

~ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _.

'~

I RAI-C5257-493 Rev. 4, May 28, 1982 DATE RECEIVED BY FRC***

5/21/82 fill (4)-

Limitorque Actuator Post-Accident eee(120).

Operability Analysis-Primary Containment 5/21/82 fill (4)

Limitorque Actuator Thermal Transient f f f (121).

Effects Analysis-Secondary Containment 5/21/82 (111(4)

Letter Amerace to R. W. Carroll ggg (122).

(GECO), 5/19/77 5/21/82 I111(4)

Rosemount 510DU Pressure Analysis hhh (123).

5/21/82 fill (4)

CR-120 Relay Radiation Analysis 111(124).

5/21/82 (111(4) jjj (125). BLP-21936 5/21/82 (111(4)

Instrumentation Radiation Analysis, kkk (126).

8/28/81 Motor Manufacturer and Insulation 111.

Class for Limitorque Actuators.

PECO states this document is not apolicable.(3)

I4) 5/21/82 fill G. E. Co. Cover Letter G-EE-9-146 nam (47).

and G-EE-9-128 22, 1982 f8]III January FRC also requests a copy of Apoendix A 2.

til to the October 31, 1980 letter f815 FRC REVIEW OF INSTALLED TMI ACTION PLAN ITE4S B.

DATE RECEIVED BY FRC***

INFORMATION REQUESTED 1

Reference 1 does not provide adequate detail l.

with respect to identification of TMI Action Plan equipment installed after 1/1/81.

The qualification documents, e.g., the actual 2.

reports and associated correspondence test cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested.

(The identification of those reports considered to be proprietary is requested so that proper l{

control of documents can be maintained.]

i' '

_nklin Rese_ arch _ Center

~~

m.

4 RAI-C5257-493 Rev. 4, May 28, 1982 3.

Where the Licensee has a standard Owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.

C.

INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED 1.

The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RAI.

2.

The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or o copy of cover letter to NRC project manager and complete package to FRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecop-f Confirmation No. 215/448-1215 s

L 1

l'.

I

-7~

l 4

h Md Franklin Research Center

  • omo a m rr.aoa mau.

RAI-C5257-493 Rev. 4, May 28, 1982 REFERENCES IE Bulletin 79-01B, Environmental Qualification of Electrical Equipment - Peach Botton Atomic Power Station 1.

Units 2 & 3 Philadelphia Electric Co., 01-Sep-81 2.

S. L. Daltroff Response to IE Bulletin Letter to B. H. Grier, NRC.

Subject:

79-OlB, Supplement 3 Philadelphia Electric Co., 30-Jan Telephone memorandum dated 8/7/81W. H. Steigelmann (FRC) c 3.

Identification of additional information required

Subject:

ated 8/17/81 Telephone memorandum K. J. Iepson (FRC) conversation with B. Boyer (PECO) 4.

Clarification of THI Action Plan cable changes

Subject:

Telephone memorandum dated 8/27/81 Boyer (PECO) 5.

W. H. Steigelmann (FRC) conversation with B. Clarification of Pla Subjects Of fice of Nuclear Reactor Regulation Safety Evaluation Report for Peach Bottom Unit 2 6.

Environmental Qualification of Safety-Related Electrical Equipment NRC, 1981 NUREG-0737, " Clarification of TMI Action Plant Requirements" 7.

NRC, November 1980 II i;

8._ S. L. Daltroff Environmental Qualification _

Letter to D. G. Eisenhut, NRC.

Subiect:

2 of Electrical Equipment - Peacn Bottom Atomic Power Station, Units j

and 3_

1 Philadelphia Electric Co., 31-Oct-80(1) l' 9.,

S. L. Daltroff_

Justification for Continued _

Letter to J. P. Stoir, NRC.

Subiect:

Operation of Peach Bottom Atomic Power Station, Units 2 and 3 Electrical Equipment Qualification Reseecting Philadelphia Electric Co., ll-Feb-82 d) l I

l

.g.

1.

N ranklin Research Center

+ a w,-.

i I

?

t 5

I h

RAI-CS257-493 l

Rev. 4, May 28, 1982 t

10.

S. L. Daltroff Letter to J.

F. Stolz, NRC.

Subiect:

Request for Additional Information; Response to Saf ety Evaluati_on Report on Environmental Qualification of Safety-Related Electrical Equipment Philadelphia Electric Co., 02-Feb-82tJJ l~1.

S. L. Daltroff Letter C. Crane, FRC. Subiect Peach Bottom Atomic Power Station Response to Request for Information i

Philadelphia Electric Co., 20-May-82(4) i k

!I i

l 1i i

_g.

j 9

UUU Franidin Research Center j

^ N.a as Tw Fr.a.iun in.an.,i.

ew.+

w

~

M

Enclosure REQUEST FOR ADDITIONAL INFORMATION to ltr. dtd. 6/7/82 i

I PEdCH BOTTOM UNIT 3 RAI-C5257-494 Rev. 4, May 28, 1982 BACKGROUND Franklin Research Center (FRC) of Philadelphia, Pa. is providing assis-

~

tance to the U.S. Nuclear Regulatory Commission (NRC) for the equipment environmental qualification (EEQ) review of operating reactors. FRC will perform an EEQ review of the Licensee's 90-day response to outstanding issues from the NRC Equipment Environmental Qualification Safety Evaluation Report (SER) and the installed TMI Action Plan equipment. The review will be limited to safety-related equipment potentially exposed to a harsh environment. The results will be presented in the form of a technical evaluation report for l

each plant.

i This request for additional infounation (RAI) is the result of an evalua-i tion of the information provided by letters dated September 1, 1981 [1] and D

January 30, 1981 [2].*

FFC previously requested MI Action Plan information by telephone memoranda dated August 7, August 17, and August 27, 1981 [3,4,5].

In response to the FRC request, Philadelphia Electric Co. (PECO) delivered the following to FRC on August 12, August 26, and August 27, 1981:

1.

Peach Bottom Unit 2 Class lE equipment list marked to identify environment during normal operation, NUREG-0737 requirement, and

]

approximate.tstallation date u

1 2.

Rockbestos Qualification Report, March 15, 1979 1

3.

Target Rock Corporation Letter to Bechtel, May 13, 1980

]

1 4.

Target Rock Corporation Report 2302, Rev. C

)

5.

Target Rock Corporation Report 2375, Rev. A i

1 6.

East West Technology Report 89405-9 4

7.

East West Technology Report 92906-9 8.

Target Rock Corporation Report 2192C

  • Numbers in brackets refer to citations found in the list of references.

I 1:

' L1 O

1 UNd Franklin Research Center A cm at n. nmu m

RAI-C5257-494 Rev. 4, May 28, 1982 9.

Target Rock Corporation Report 2005C 10.

Normal radiation dose for applicable areas 11.

Report Titled " Summary of HELB Calculation for the MSLB in the Main Steam Tunnel for Peach Bottom Project," October 9, 1980 12.

Clarification of radiation dose values and MSLB within containment.

On February 25, 1982, FRC received PECO's submittal of additional qualification information dated February 11, 1982 [91 concerning iustification for continued operation.

^

By letter dated February 2, 1982 [101, Philadelphia Electric Company stated that it will supply the requested information for FRC review at the PECO offices.

FRC notes that review of requested information at a licensee's headquarters is not part of FRC's contract scope.

i On May 20, 1982, PECO transmitted the information requested in the previous revision of this RAI witn the exception of Items B.1, B.2, B.3 (TMI Action Plan Information) [111. ( '

M A.

FRC REVIEW OF THE LICENSEE'S 90-DAY RESPONSE TO THE NRC EEQ SER INFORMATION REQUESTED DATE RECEIVED BY FRC***

1.

In reference to the Licensee's 90-day response

[1] to the NRC SER [6), a legible single copy' of each of the following qualification documents is requested in order that the FRC evaluation may proceed:

(Numbers in parentheses correspond to the reference number contained in Reference 1.)

a(2).

G. E. Co. Cover Letters G-HE-8-198 and 5/21/82 [Ill(4)

G-HE-9-106 b (7).

'G. E. Co. Cover Letter G-HE-8-153 5/21'/82 [Ill I4) i

    • Througnout the text, superscript numbers in parentheses indicate the revision in which the underlined material preceding the superscript was added.

'"This column will be completed by FRC as the requested information is received.

g! Franklin Research Center

'n

%.an om. rr.n.w m.m.

i m

w

-=

y e

J RAI-C5257-494 Rev. 4, May 28, 1982 l

1 DATE RECEIVED BY FRC***

1 c (9).

G. E. Co. Cover Letter G-HE-8-54 5/21/82 fill (4) d(10). Vendor Print $6280-E40-124-1 5/21/82 fill (4)

I l

e(13). G. E. Co. Cover Letter G-EE-7-154 5/21/82 till(4)

(FDI-123) f(28). Bechtel Power Corporation Study 5/21/82 fill (4)

!1 BLP-21921, 7/31/81 g (30). Special Study-Operating Requirements 5/21/82 fill (4) for Safety-Related Equipment Inside the Drywell Post-LOCA Letter 1/5/79 T. J. Scull to J. J. Ferencaik I

h (35). G. E. Co. Environmental Qualification 5/21/82 fill (4)

Test Summary-NSE79023 4

i(43). G. E. Co. Environmental Qualification 5/21/82 fill (4)

Test Summary-NSE80010 j(49). Rockbestos Company letter from G. S.

5/21/82 fill (4)

Buettner to J. J. Ferencsik k(55). Amerace Letter to N. J. Wood, 5/13/80 5/21/82 (111(4) 1(56). Amerace Spec. EGP.

5/21/82 till(4) i m(57). GECO licensing topical 5/21/82 fill (4)

]

report-NEDO-21617-A.

n(58). GECO data sheet 22A1378AB.

5/21/82 fill I4) i o(59). 'ELMA letter to W. W. Bowers (3/15/77) 3/21/82 fill (4) and Telecon to Mr. Ryland of i

ELMA (2/25/80).

p(60). Viking test report 630592 and Telecon 5/21/92 fill (4)

]

to L. Hane of Topaz (6/7/76).

1 j

q(61). Limitorque letter to W. H.

5/21/82 fill (4)

VanBuskirk 2/22/80.

r (6 2). BLP 21586 PBAPS Environmental 5/21/82 f111(4)

Conditions IOCA temperatures.

BLP 21606 PBAPS Environmental 5/21/82 fill (4)

Conditions HELB temperatures.

4

. - ~ ~.

y.,_

v-.

r,

..---m

i

}

RAI-C5257-494 j'

Rev. 4, May 28, 1982 i

DATE RECEIVED BY FRC***

5/21/82 till(4) s(63). BLP 21544 PBAPS Environmental Conditions Radiation dose study.

t(65). PBAPS MAX LOCA/HELB pressures.

5/21/82 fill I4) 5/21/82 till(4) u(66). ASCO letter to W. H.

VanBuskirk, 6/6/80.

v(68). Rosemount Test Report il277D 5/21/82 (11],(4)

Letter from S. L. Daltroff to B. H.

5/21/82 (111_(4) w (71).

Grier (NRC),1/29/79.

x (73). BLP-21679, Equipment TID 5/21/82 fill (4) y (75). QSR 002-A-01, 002-A-02.

5/21/82 fill (4) 2 (76). Rosemou'nt Analysis, 10/20/80.

5/21/82 fill (4) 2 aa (77). ASCO Analysis (Ther:nal), 10/20/80.

5/21/82 (111(4)

'.i bb (78). ASCO Analysis (Humidity), 10/20/80.

5/21/82 (111(4)

I cc (79). GECO NEDO-10698 5/21/82 (111 I4) 3 dd (80).

Physical Sciences Analysis, 10/20/80 5/21/82 fill (4) ee (81). GECO Specification 22A2928 Rev.1.

5/21/82 (11)(4)

'l j

f f (82). SLD Analysis, 10/21/80 5/21/82 fill (4) 4' 1

gg (83). QSR-080-A-01 Received 3/9/82 for Task 500(J) f.

hh (8 4). Tprget Rock Corporation Analysis, 5/21/82 fill I4) 10/22/80 i

11(85). Bechtel Specification 6280-M-242 5/21/82 till I4) f jj (86). Delphi Catalog 201-A 5/21/82 (11)(4) kk (88). QSR-027 5/21/82 fill (4) 5/21/82't111(4) 11(89). QSR-037 l

n:n(90). QSR-029-A-01 Received 2/12/82 I

for Task 495(3)

I e

i

_nklin_Rese_ arch _ Center

~

RAI-CS257-494 Rev. 4, May 28, 1982

]

DATE RECEIVED BY FRC***

nn (91). QS R-03 2-A-01 Received 3/9/82 for Task 500(3) 5/21/82 fill (4) oo (92). UL-510 pp(9 3).

3M Research Report-3410175001-003 5/21/82 fill (4) 5/21/82 fill (4) qq (9 4).

3M Report 54C3082 rr (95). QSR-111 5/21/82 fill I4) ss (96). Agastat Analysis, 10/27/80 5/21/82 fill I4) tt(102). ASCO Letter to W. H. VanBuskirk, S/21/82 fill I4) 12/30/80 5/21/82 fill (4) uu(108). QSR-015 vv(110). Calculation #E-514-3 5/21/82 fill _I4) ww (lll). Reliance Electric Supplemental 5/21/82 fill I4)

Report (NUC-9) xx (112). Reliance Motor Analysis (Pressure 5/21/82 (111 I4) and Radiation), 7/7/81 yy (114). Ambient Pressure Transient Effects 5/21/82 fill _I4) on ECCS Pump Motors

[

2z(115). Ambient Pressure Transient Effects 5/21/82 (111 I4)

{

on ECCS Pump Motors J

(I saa (ll6). Agastat Relay Analysis 5/21/82 fill I4) d (63-0400-1 thru 20) l 5/21/82 (111_I4

bbb(117). Post-LOCA Humidity Conditions -

j BLP-21730, 11/12/80 ccc(ll8). Agastat GP Relay Temperature Analysis 5/21/82 fill (4)

]

ddd(119).

Limitorque Actuator Post-Accident 5/21/82 (111(4) h Operability Analysis-Secondary i

Containment l

1i -

~

f ranklin Research Center

~., m r,-.

I!

l.__ _ _

e t

RAI-C5257-494 Rev. 4, May 28, 1982 DATE RECEIVED BY FRC***

eee (120).

Limitorque Actuator Post-Accident

'5/21/82 (111(4)

Operability Analysis-Primary Containment f f f (121). Limitorque Actuator Thermal Transient 5/21/82 fill _ (4 )

Effects Analysis-Secondary Containment ggg (122). Letter Amerace to R. W. Carroll 5/21/82 (111(4)

(GECO), 5/19/77 hhh(123). Rosemount 510D0 Pressure Analysis 5/21/82 (111(4) 111(124). CR-120 Relay Radiation Analysis 5/21/82 [11)(4) j j j (125). BLP-21936 5/21/82 (111(4) kkk(126).

Instrumentation Radiation Analysis, 5/21/82 (11](4) 8/28/81 111.

Motor Manufacturer and Insulation Class for Limitorque Actuators.

PECO states this document is not apolicable.ld mmm (47).

G. E. Co. Cover Letter G-EE-9-146 5/21/82 (111(4) and G-EE-9-128 2.

FRC also requests a copy of Appendix A January 22, 1982 [8](1) te the October 31, 1980 letter [81.ll)

B.

FRC REVIEW OF INSTALLED TMI ACTION PLAN ITEMS INFORMATION RfQUESTED DATE RECEIVED BY FRC***

l 1.

Reference 1 does not provide adequate detail with respect to identification of TMI Action Plan equipment installed after 1/1/81.

2.

The qualification documents, e.g., the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all identified TMI Action Plan equipment are requested.

(The identification of those reports considered to l;

be propri.atary is requested so that proper control of documents can be maintained.]

- ~

1 MJ Franklin Research Center s n a ne rmn s u.

l, ll

~

RAI-C5257-494 Rev. 4, May 28,1982 3.

Whera the Licensee has a standard owners' Group position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.

C.

INSTRUCTIONS FOR TRANSMITTING INFORMATION REQUESTED 1.

The schedule for completion of the FRC assignment requires that the Licensee provide the requested information within 3 weeks of the date of the RAI.

2.

The Licensee may transmit the requested information as follows:

o complete package directly to the NRC project manager or o copy of cover letter to NRC project manager and complete package to FRC.

FRC mailing address is as follows:

Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 000d Franklin Research Center

% w th. r, nn mu.

"~

~

RAI-C5257-494 Rev. 4, May 28, 1982 REFERENCES 1.

IE Bulletin 79-OlB, Environmental Qualification of Electrical Equipment - Peach Bottom Atomic Power Station Units 2 t 3 i

Philadelphia Electric Co., 01-Sep-81 2.

S. L. Daltroff Letter to B. H. Grier, NRC.

Subject:

Response to IE Bulletin 79-OlB, Supplement 3 Philadelphia Electric Co., 30-Jan-81 3.

Telephone memorandum dated 8/7/81 W. H. Steigelmann (FRC) conversation with J. Nagel, B. Boyer (PECO)

Subject:

Identification of additional information required 4.

Telephone memorandum dated 8/17/81 K. J. Iepson (FRC) conversation with B. Boyer (PECO)

Subj ect:

Clarification of TMI Action Plan cable changes 5.

Telephone memorandum dated 8/27/81 W. H. Steigelmann (FRC) conversation with B. Eoyer (PECO)

Subject:

Clarification of Plant Environmental Data Submittals 6.

Office of Nuclear Reactor Regulation Safety Evaluation Report for Peach Bottom Unit 2 Environmental Qualification cf Safety-Related Electrical Equipment i

NRC, 1981 7.

NUREG-0737, " Clarification of TMI Action Plant Requirements" NRC, November 1980 8.

S.

L. Daltroff Letter to D. G. Eisenhut, NRC.

Subiect: Environmental Qualification of Electrical Equipment - Peach Bottom Atomic Power Station, Units 2 and 3 Philadelphia Electric Co., 31-Oct-80(1) h S.

L. Daltroff Letter to J.

F. Stolz, NRC.

Subiect: Justification for Continued Operation of Peach Bottom Atomic Power Station, Units 2 and 3 Respecting Electrical Equioment Qualification Philadelphia Electric Co.,

ll-Feb-82td) i e

6 I

RAI-C5257-494 Rev. 4, May 28,1982 10.

S. L. Daltroff Letter to J. F. Stolz, NRC.

Subiect: Request for Additional Informations Response to Saf ety Evaluation Report on Environmental Qualification of Safety-Related Electrical Equipment Philadelphia Electric Co., 02-Feb-82(3) 11.

S. L. Daltroff Letter C. Crane, FRC. Subiect: Peach Bottom Atomic ' Power Station Response to Request for Information Philadelphia Electric Co., 20-May-82(4)

'i I

t H

l 6

i!

1 l'

4 8

dud Franklin Research Center a % an.rr.nonw u.

-