Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1982-049, Forwards LER 82-049/03L-0 + (ML20053B895)
- ML20053B897 + (ML20053B897)
- ML20053B898 + (ML20053B898)
- 05000302/LER-1982-021, Forwards LER 82-021/03L-0 + (ML20053B899)
- ML20053B901 + (ML20053B901)
- 05000327/LER-1982-046, Forwards LER 82-046/03L-0 + (ML20053B902)
- 1CAN058205, Forwards Monthly Operating Rept for Apr 1982 + (ML20053B904)
- 05000324/LER-1982-049-03, /03L-0:on 820325,during Channel Calibr & Functional Test of ECCS Shroud Level Instrumentation,Level Switch Actuated Out of Tech Spec Tolerances.Caused by Drift of Instrument Mechanism.Instrument Recalibr + (ML20053B906)
- ML20053B907 + (ML20053B907)
- ML20053B908 + (ML20053B908)
- ML20053B909 + (ML20053B909)
- ML20053B910 + (ML20053B910)
- 05000327/LER-1982-046-03, /03L-0:on 820205,surveillance Instruction 166.6 Not Performed on Steam Generator Blowdown Isolation Valve, Found During Review of Maint Requests on 820326.Caused by Misplaced Maint Request + (ML20053B911)
- ML20053B912 + (ML20053B912)
- 05000302/LER-1982-021-03, /03L-0:on 820219,while Using SP-221 (Startup Feedwater Valve Air Accumulator Leak Test) for Maint Trouble Identification,Feedwater Valve (FWV-39) Failed to Meet Surveillance Criteria.Cause Undetermined + (ML20053B914)
- 05000302/LER-1982-022, Forwards LER 82-022/03L-0 + (ML20053B915)
- ML20053B918 + (ML20053B918)
- ML20053B920 + (ML20053B920)
- 05000302/LER-1982-022-03, /03L-0:on 820321,emergency Feedwater Ultrasonic Flow Indicator Not Functioning.Caused by Failed Power Supply.Ultrasonic Flow Transmitter Will Be Replaced W/ Conventional Flow Transmitter + (ML20053B921)
- ML20053B922 + (ML20053B922)
- ML20053B923 + (ML20053B923)
- 05000324/LER-1982-063, Forwards LER 82-063/03L-0 + (ML20053B924)
- ML20053B926 + (ML20053B926)
- ML20053B927 + (ML20053B927)
- 05000324/LER-1982-063-03, /03L-0:on 820326,routine Surveillnce Revealed That Primary Containment Atmospheric Oxygen Analyzer 2-CAC-AT-1263-2 Was Not Showing Expected Trend in Drywell Oxygen Concentration.Caused by Stuck Contacts + (ML20053B928)
- L-82-205, Interim Deficiency Rept Re Potential Steam Generator 2A 1-inch Nozzle Malfunction,Initially Reported on 820217. Final Rept Will Be Submitted by 820617 + (ML20053B930)
- ML20053B931 + (ML20053B931)
- 05000325/LER-1982-047, Forwards Updated LER 82-047/03L-1 + (ML20053B935)
- ML20053B939 + (ML20053B939)
- 05000325/LER-1982-047-03, During RHRSW Operability Test,Vibration of 3.2 Mils Measured for 1B RHRSW Pump.On 820420,during Suppression Cooling,Smoke Observed Emanating from Pump Bearing Housing + (ML20053B940)
- 05000324/LER-1982-051, Forwards Updated LER 82-051/03L-1 + (ML20053B941)
- AECM-82-165, Final Deficiency Rept Re Nuts & Jam Nuts Not Threading Properly Onto Control Rod Drive Housing Lower Supports, Initially Reported 820205.Deficiency Determined Not Reportable.Ge Issued Rept to Cover Corrective Actions + (ML20053B943)
- 05000302/LER-1982-019, Forwards LER 82-019/03L-0 + (ML20053B944)
- 05000324/LER-1982-051-03, Primary Containment Atmospheric Hydrogen analyzer,2-CAC-AT-1263-1,indicated 0% to 1.8% Change in Hydrogen Concentration in Drywell.On 820325,3% Change Noted.Caused by Erratic Potentiometer + (ML20053B947)
- ML20053B948 + (ML20053B948)
- ML20053B950 + (ML20053B950)
- ML20053B952 + (ML20053B952)
- IR 05000313/1982009 + (ML20053B955)
- PLA-1102, Interim Deficiency Rept Re Capability of Ac Electric Distribution Sys to Support Two Unit Operation,Initially Reported 820420.Design Voltage Verification Tests Conducted. Final Rept in Sept 1982.Also Reported Per Part 21 + (ML20053B956)
- 05000361/LER-1982-012, Forwards LER 82-012/03L-0.Detailed Event Analysis Submitted + (ML20053B957)
- 05000302/LER-1982-019-03, /03L-0:on 820301,while Performing Housekeeping,Air Start Line to Number 5 Cylinder on Emergency Diesel Generator B Found Parted.Caused by Fatigue on Cylinder Air Start Line.Line Repaired + (ML20053B959)
- 05000361/LER-1982-012-03, /03L-0:on 820424,heater in Train B of Control Room Emergency Air Cleanup Sys Cycled on & Off.Caused by Erratic Functioning of Flow Control Switch & Pitot Tube. Switch Replaced & Pitot Tube Reoriented + (ML20053B960)
- 05000302/LER-1982-015, Forwards LER 82-015/03L-0 + (ML20053B962)
- ML20053B964 + (ML20053B964)
- AECM-82-219, Forwards Responses/Clarifications Re Issues Discussed in Fsar,Addressing Revisions to FSAR Section 12.5.Incorporation of Revisions Will Be Made Pending Util & NRC Agreement on Procedures Required for post-OL FSAR Amends + (ML20053B965)
- ML20053B966 + (ML20053B966)
- ML20053B968 + (ML20053B968)
- ML20053B969 + (ML20053B969)
- ML20053B970 + (ML20053B970)
- ML20053B972 + (ML20053B972)
- 05000302/LER-1982-015-03, /03L-0:on 820204,reactor Bldg Pressure Transmitter Isolation Valve V-1 Shut in Mode 5.Caused by Undocumented Valve Closing.Valve Opened + (ML20053B973)