Text
I
(
s OPERAT NC DATA kEPOR-s DCC:*ET NO.
50-316 DATg 5-5-82 CO3t?LETED Iy A. Micht TEI.EPHCNg 616-465-8901 OPE?ATING 5 ATUS Donald C. Cook 2
Notes
- 1. Uni: N===:
Apri1, 1982
- 2. Repor:ing ?-dod:
3391
- 3. 8 4-W Tht:=si?ower(51Wt):
1133
- 4. Nameplaie Rs:ing (Gross 51We):
1100
- 5. Design Ele =:i=1 R::ing (Nec 51We):
1118
- 6. 3Luimunt Dependshte Capsd:7 (Cross 51We):
1082
- 7. Siaxi=um Dep =d:ble C:p:=i:7 (Ne: 31we):
$_. If Chsn;es Oc:=r in Capaci.y Rati ;s (It==s Nu=her 3 Through D Since Las: Repor:. Give Reasons:
- 9. Power Level To Which Res=is: d.!! Any (Net SIWE):
- 10. Re: sons For R=t:i::foss.If Any:
His 5fonth
' Yr.<o.cata Cu. :uhtive 719 2.879 37.943
- 11. Hou:s != Repor:ing P::iod 719 2,385.1 26.410.1
- 12. Nu=ber of Hou:s R==:ce Was Cri:f=1 0
0 0
- 13. Re:c ce Resene Shu:down Ho=s 718 2,364.3 25,585.3
- 14. Hours Gene =:ce ca. Lice 0
0 0
- 15. U::ic Reserve Shutdown Hot:=
2,391,274 7.716.963 81.777.7R4 lo. Cross Thw ! E::::;y Cer:e=:ed (31WH) 791,690 2.548,120 26.255.920
- 17. Cross E!e=:i=f Eser;y Gene:ed otWHj 764,517 2,459,186 25,303,327
- 13. Nec IIe=:i=1 E==;y Cen==: d OtWH) 100 82.1 72.2
- 19. Unit Senice.::ctor 100 82.1 72.2
- 20. Ucit Av:IIsbiE:7 :ctor F
98.3 78.9 67.7
- 21. Unit C:psci:7 :::or (Usi=;..cC Nee) 7 u
96.7 77.7 66.9-
- 22. Unit Caesdty. :::or(Using DER.ies) 0 17.9 14.6
- 23. Unit.corced Cu:sge Rate
- 24. Shutdow,ts Scheduled Over Nex: 5 5 ton:i:s (Type. Dete.:nd Du:::fon of I:ch1:
- 25. If Shu: Down At End Of Report Period. I: tim::ed D:ce of Star::p:
Foreest Aci:ieved
.25'. Units la Tes: S:::us iP::or to Ce==e::ist Oper::ioni:
INITIAL CRIT:CALJTY (NiTIA L I:.ECTE:C -"Y CO:.i!.t ERC:A.O?ET.AT ON
~
3b 8206010
... +
___n,-
_,,.--,,,a
,v-y,,.,.._,,,,a
.-g-
,,.-..,-__e,.
--m,,,,.,
,.m,,.,
~
i.
AVERAGE DAILY UNIT POWER LEVEL
~
00CXET NO. 50-316 UNIT 2
DATE 5-4-82 COMPLETED BY Ann Might TELEPHONE 616-465-5901 MONTH Anril, 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWE-Net)
(MWe-Net) 1 500 17 1089 2
1041 18 1089 3
1090 19 1088 4
1094 20 1088 5
1093 21 1088 6
1093 22 1080 7
1085 23 1086 g
1037 24 1083 9
1093 25 1085 10 1093 25 1084 11 1091 27 1083 12 1090 28 10fA 13 1090 2o 1066 14 1072 30 1034 15 1084 31 0
1085 O
INSTRUCTIONS On this format list the average daily unit pcwer level in MWe-Net for each day in the reporting month. Comoute to the nearest whole megawatt.
I I3 O unil SIIUIDOWNS AND POWut itLlillrilONS r(
C Cook - Unit 2 Dr f r _5-13-82 COktra l l ED liy B.A. Svensson itt roitI klONill _ April,1982
.l a.ij.liONi; (616)'465 59dl PAGE 1 of 1 c
c
!E
- $E I icen$ce
.Ij'8..
hi.
Caisse & Coinct eive 7,
3 N. i D. ale Q
3g i
js$
livent F 18 Mj At u.m to 3 ;y, E:
Itegmit #
LE U EU Psevens itecmsenic H
o g
e O
~
108 The Unit reached 100% reactor power on 820402 following an outage that began on 820311 and ended on 820331.
109 820407 S
0 B
4 N.A.
ZZ ZZZZZZ Reactor power reduced to 80% to per-form secondary side flow verification tests. Reactor power returned to 100% 820408.
110 820429 S
0 B
4 N.A.
Z ZZZZZZ Reactor power reduced to 85% to per-form secondary side flow verification tests.
Reactor power returned to 100% 820430.
I J
J
.I l. l'on al ite.non.
klethoil:
L atiiliin G - Instini tions S. S hninic.I A liimpmes.: 1 ailuie (1.xplam)
I hlaimal los Pacpasainm of Data 11 hiaintenanec or Test 2 klannal Sceans.
l.ussy Shcess los I isensce C ltcl'nelmg
.t. Antomauc & sam.
1 vent liepue s (I l'It I l'ile INiliti G-11 Itegulainay itestantiton
-I Othes ilisplaml 181611 I Opes.itos laaming & l at ense I saminattim 1 Ailmimstialive 5
G Opceauonal 1.inis ll xplain)
I sinhis 1 S.iine Souice I'6/ / / )
ll ulbri llispl.ain)
UNIT SHUTDOWNS AND POWER REDUCTIONS LNSTRUCTIONS This repor! saculd desen:e 211 ;!2nt shutdowns dunn? ne a m=r:ance uth he :=le 2=cear:ng on de repon form.
report ; enoc. In 2ddinon. tt snould be de sour:e et exclan.
If:stegory 2 must be :sec. suppiy bnef::mments.
st:on of sapine2nt dips m average power ;eveis. E2:n um-fi:2nt redu:non m power t. eve.i (pester.i.2n
- m..:.a.u.- :cn LICENSEE EVENT REPORT :. Reference me app..a:2ble m 2ver2;e d2 y power,. ve.i.or.e
.....a g
nuts)
- per:2:4e :c::::ence penam:n; :o 2e cutage or power redu:nen. :n:e de ". :: :Our pans fevent ye2:. ;cq;enn2.
ould.,. ot a.. e., c...;,. u.
... 2y
..,J t 25.
a......
snut down completely. ror su.,,.a.....uc., ens a ; owe u..vei.
repod numcer. o:::::en:e ::de and re:or: y:ej of me ::ve 1
- e us:e. as zero. %.. me,a.o at
.a.u... ton pan denpat:en as des = bed a. 1:em 1, at Ins:m:nons :::
.. a tne durst:en should.
c n a a
Pre:2:2nen af Data e.ntry Sheets :or L::ensee. vent e pe r,,
snould be aste 25 t det). Ini. 5.e Ause In
....v e t L:R)
,ne !NL. REG.0161).
ms mformanon may not :e A:nen to Preven: Re urren ;clumn shou.ia. ex: ism.
.e i
= meta:eiy evident for 211 such shu:: owns. of course nnce Cause md C:rreenve Acnon to revent.secur:ence cotumn should be used to provide any needed exp ananen to, a.y furtner mvesuganon may be : qu: ed to ascertam anetner or a
y, desenbe the ::r: urns:ances of tne outage er power re.uc.icn.
not 2 recort:cle oc:urrence was involvec. ).. she outage or power recuenon wu! not result in 2 repor:2:le oc-"" -~
NUMBER. T us :ciumn saculao mc.=:e the sequent:21 num.
the ros:ttve mdi:2nen cf dis 12:k of :orte!2non should :e ber ass: ped :o each shu:down or ugmdcant reduenon a power noted as not apph.mbie S. Ah for mat niendar year. When 2 shutdown or ngmii:2nt power SYSTEM CODE. The system ::. wh::n de ou:2;e or ;cwe:
reduenon bepts m one re: ort ;ened and ends m 2notner.
- u;non ongmated souid be noted av the tw'o tg:t : Ode of 2n entry snould,:e mace tot born repor: penods to be sure e
ux:uoit G. Instruences :or.,re:2:2non of Data.nt:). 2 nee:s al snutdowns or sig=d:2nt power redu nons are reported.
for L::ensee Even: Re:or:(LER') File (NUREG4161).
Lntd a unit has 2:h:eved its :::n powe: pneration, no num.
ber snould be ass; ped to es:n entry.
Systems dat do not fi: 2ny existmg : de shouic :e des:gn2 ted XX. The :oce ZZ shou!d be used i:t tose events wnere DATE. Th:s eclumr. should mdicate me date of the start 2 sys:e= is not appil:2 ele, of each snutdown or ngm:1:2nt power reduenon. Report as y ear. =cnth. 2nd 22). Aupst 12.10 would be repor:ed COMPONENT CODE. Sele:: ce most 2;ptcpn2:e.cmponent 23 - CS14. When 2 shu:down or ng:uS;2nt powe: reduenan nom Ex:ubit I. Ins::u:nens for Prep 2:2ttert of Data Esta ber.ns m one report pened and ends :n mo er. 2n en::y should Sheets for Licensee Event Repor:(LER) File tNUREC4161 L be made for botn report pencds :o be sure all snutdowns usmg :he fallowmg :ntiena:
or s:g=nant power recu:: ions are reported.
TYPE. L se "F" or "S" :o indicate e: der "For:ed" or " Sche.
Juled/ res:e:nvely, for each shutdown or sipiScant power B.
If not 2 :cmconent failure, use 1e reisted cmponent.
reduenon. Forced cutdowns m !ade dose requ::ed to S e.g.. wrong valve operated throup error: lis: valve as unnsted by no later 22n de weekend fo!!awmg dis very
- 0moonent.
of 2n off. normal condit:en. It ts recept:ed that some judg.
ment s required :n :stegonz=g shutdowns in th:s way. In C.
If a cham of failures occurs, the first : mponent :o mai.
general. 2 for:ed snutdown is one tnat would not have been funcnon should e listed. The secuen:e of events.meluc.
completed in :he 2:sen:e of de ::ncition for which ::treenve ing de other : mponen:s wh::h :2tl. snould be des = bed 2:non was :2xen.
under the Cause 2nd Corre:nve Acnon to Prevent Reest.
rence column.
DURATION. Self When a sutdown ex: ends beyond the end or.-explanatory.
Components dat o not fit my ex: sung : ode snould be de.
2 report penod. ount only the t:me to the ugnated XXXXXX. The ecde Z,,,., should.:e usec tot end of :ne recort penod and pick uo the ensumg down nme events where 2 component denpan.on :s no: 2 pen:2cle.
m the foilowme reecrt :er:cds. Recort duranon of outages munded to :ne nearest tenth of an hour:o fa::litate summatten.
CAUSE & CORRECTIVE ACTION TO PREVENT RECUR.
the sum of tne total outage hours plus the hours the geners.
RENCr.
.se :.,.e :clumn m a narranve :.2sh:on :o am;itiy or or was un line snoul,, ecusi the pass hours in :.,.e report =g ex:iam de ::umstances at :ne snutcown or pcwer recuenen.
E' O The :clumn snould include the spec:d: :2use for each shut.
down or sapide nt power redue :en 2nd the.mmeciat: 2nc REASON. Catepnze 5-, t:er deu4 nation in accordan,,
.e centemeisted,.onz :erm corre:nve scnon taken. if accreen.
muh tne tacie a=: ear:na un the re: ort form. If : ster., d ste. Sms : iumn snould also be used :or 2 des net:en'or me a
must be use.. sueen br:et eumments.
maior safety.re!2:ed corre:nve mamtenance performed dunna METHOD OF SHUTTING DOWN THE REACTOR OR
- O' ? **' "U"'UO" #CI'U*g an :denud 2nen of REDUCING POWER. Categonze ey nume er des:msnon me mned p;m 2:nq 2nc 2 npon or any nnaa m2se er, r:ctosenvu) or serie :2d:st:cn ex:csure s:ee:tt.:ily assa:.
1% e that this Atiters f rom the Edison E:ectne Insutu:e atec with me uut2 e wruca see unts for more : nan 10 pereen:
iEEh de6mnens ot " Forced Parn:1 Outare" 2nc "Sene.
di de :1!ow30;e mnual v21ues.
- uied Partral Ou:24:
- For enese terms. FE! uses a hance or For long tex:ual re: orts eentmue nar:2trve an se:2 rate p2:er
.0 Mw as the =res ;wni. For f arger power rese: ors. 30 MW
.nj re:eren e ti:4 shutdown or power e::uonun :m m
.3 f **o small J.rtJnie tu wariant af tJnJLluH.
(1Jfranve.
ga **
~
me4
- e eM M*n'-
Docket No.: 50-316 6
Unit Name:
D. C. Cook Unit #2 Completed by:
D. R. Campbell Telephone:
(616) 465-5901 Date: May 10, 1982 Page:
1 of 1 MONTHLY OPERATING ACTIVITIES - APRII., 1982 Highlights:
The Unit entered the reporting period in Mode one, the Unit had just been paralleled at 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br />, March 31, 1981. Prior to reaching 100%, the West Feed Pump tripped when an operator tried to clear the low vacuum trip operated alarm annunciator.
Power was rapidly reduced to 45%. The Feedpump turbine was reset and the Unit reached 100% power at 1208 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.59644e-4 months <br />, April 2, 1982.
Power was reduced to 80% on April 7,1982 to conduct condensate flow tests.
Power was started down April 22, 1982, when it was thought that the Boron Injection Tank was not within its required boron con-centration limits.
Less than 1% power was dropped before the tank boron concentration was verified correct.
Power was again reduced to 85% on April 30, 1982 to conduct condensate flow tests.
Summary:
4-1-82 1410 hours0.0163 days <br />0.392 hours <br />0.00233 weeks <br />5.36505e-4 months <br />, West Main Feedpump turbine tripped, power was reduced to 45%.
4-2-82 1208 hours0.014 days <br />0.336 hours <br />0.002 weeks <br />4.59644e-4 months <br />, power returned to 100%.
4-7-82 2207 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.397635e-4 months <br />, power reduced to 80% for condensate flow tests.
4-8-82 0840 hours0.00972 days <br />0.233 hours <br />0.00139 weeks <br />3.1962e-4 months <br />, power back to 100%.
4-8-82 0648 hours0.0075 days <br />0.18 hours <br />0.00107 weeks <br />2.46564e-4 months <br />, Number 24 Circulating Water Pump motor tripped due to motor grounded.
4-9-82 0358 hours0.00414 days <br />0.0994 hours <br />5.919312e-4 weeks <br />1.36219e-4 months <br />, Number 24 Circulating Water Pump motor was replaced.
4-14-82 On two occasions, one half of a Main Turbine Condenser was removed from service for a leakage test, two tubes were plugged.
4-22-82 Power was reduced less than 1% for a few minutes due to an indicated high boron concentration in the Boron Injection Tank.
4-29-82 2153 hours0.0249 days <br />0.598 hours <br />0.00356 weeks <br />8.192165e-4 months <br />, power reduced to 85% to conduct condensate flow tests.
4-30-82 0920 hours0.0106 days <br />0.256 hours <br />0.00152 weeks <br />3.5006e-4 months <br />, power returned to 100%.
s DOCKET N0.
50 - 316 UNIT NAME D. C. Cook - Unit No. 2 DATE 5-13-82 COMPLETED BY B. A. Svensson TELEPHONE (616) 465-5901 PAGE 1 of 1 MAJOR SAFETY-RELATED MAINTENANCE APRIL, 1982 M-1 The reactor coolant filter drain valve, CS-381, was leaking by.
Re-placed the valve bonnet and diaphragm.
M-2 The east centrifugal charging pump mechanical seal was leaking.
Re-placed the seal and had the pump tested.
M-3 The hot leg manway cover on No. 2 steam generator was leaking.
Re-placed the gasket for the hot leg manway cover.
Retorqued the bolts for the cold leg manway.
M-4 The west centrifugal charging pump mechanical seal was leaking.
Re-placed the inboard seal and realigned pump to motor. Had the pump tested.
M-5 No. 2 steam generator power-operated relief valve, MRV-223, had a body-to-bonnet leak.
Lapped the valve seat and replaced all gaskets. Had the valve tested.
M-6 No. 2 steam generator stop valve dump valve, MRV-232, was leaking by.
Replaced the seat ring and the gaskets. Had the valve tested.
M-7 The south boric acid filter outlet isolation valve, CS-421S, was leaking.
Replaced the diaphragm.
M-8 No.1 steam generator power-operated relief valve, MRV-213, was leaking by.
Replaced the plug and cage.
Reassembled with new gaskets and had valve tested.
C&I-l Emergency Diesel generator 'AB' could not be shut down by the control room 'stop' switch nor by an HEA relay trip. The generator was finally shut down by repeated actuation of the local panel emergency trip. A diaphragm and valve seat o-ring on trip valve POV-4 were replaced to restore the proper trip function to ' AB' diesel.