AC40 - RA t
NRC MONTHLY OPER ATING REPORT DOCKET NO. 50-206 DATE 6 Mav 87 COMPLETED BY T. Raidv TELEPilONE 714-492'-7700 Ext. 702 OPERATING STATUS San Onofre Nuclear Generatino Station, Unit 1
- 1. Uni Name:
- 2. Reporting Period:
1 April 1982 throuah 30 April 1982
- 3. Licensed Thermal Power (MWt): 1347 456
- 4. Nameplate Rating (Gross MWe):
436
- 5. Design Electrical Rating (Net MWe):
- 6. Masimum Dependable Capacity (Gross MWel: 456 436
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
N/A This Month Yr.-to-Date Cumulative 719 2879 130.399
- 11. Hours in Reporting Period
- 12. Number Of Hours Resctor was Critical 0
1374.?
RR_430
- 13. Reactor Resene Shutdown Hours 0
0 0
- 14. Ilours Generator On.Line 0
1372.3 84_818.15
- 15. Unit Resene Shutdown flours 0
0 0
0 1, 585,041.8 108,263,946.8
- 16. Gross Thermal Energy Generated (MWH) 0 540,000 37,203,434 17 Grow Electrical Energy Generated (MWH) 0 510.223 34.933.054 lb. Net Electrical Energy Generated (MWH) 0%
47.66%
65.04%
- 19. Unit Senice Factor 0%
47.66%
65.04%
- 20. Unit Availability Factor 0%
43.00%
61.44 %
- 21. Unit Capacity Factor iUsing MDC Nett 0%
43.00%
61.44%
- 22. Unit Capacity Factor (Using DER Net) 0%
0%
21.65%
- 23. Uni Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (T3pe. Date,and Duration of Eache:
The current outage began 2/27/82 and is scheduled for completion by 6/4/82.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
June 4,1982
- 26. Units in Test Status (Prior eo Commercial Operation):
Forecast Achieved INITI \\ L CRIIICA LITY INITi\\L ELEC TRICITY COMMERCI AL OPER ATION 820 6 010 3q
,.... <,i... -..,..
. ~. _ - _ _
I
_.m i
AVER.tGL DTILY UNIT POhER LEVEL 4
DOCKET NO.
50-206 SONGS 1 uggy DATE 6 May 1982 COMPLETED BY T. Raidy 4
TELEPHONE 714-492-7700 Ext. 702 MONTH April DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE D AILY POWER LEVEL i
(MWe Neti
( M w e.Negg 0
0 1
,7 0
2 n
gg 3
0 0
i, 0
4 0
,o 5
0 0
,i 0
0 6
7 0
0
,3 N
0 0
,4 0
0 9
25 10 0
26 0
4 8!
O 0
r 0
0 l
12
,g 0
0 13 29 0
0 14 3g is 0
u NA O
i,,
I l
i nsciel ni
...n.
W 4
r
+-
g-=
-m
'f &"--
-pmw e4w 4
4&-
-T
-M--
-e
-+M*
w"-*
-se e
'e
-w'
+--
9-r--
m-r- - =
w e
e' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-206 UNIT NAME SONGS 1 DATE 6 May 1982 COMPLETED BY T. Raidy REPORT MONTH Anr11 El.EPHONE 714-492-7700 Ext. 702 "E
E 5
u=
=-
ce 7sa 1.kensee g-t,
=%
Cauw A Correctne 7,
E:
=
\\"-
Date i
52 4
2sE I: vent
?
$~g Action to jE 5
3 di =!
Repors =
iE 0 EL Prevent Recurreinc e
O 6
78 2/27/82 S
720 B
1 N/A 22 N/A 14 week outage to accomplish seismic
[
backfit and miscellaneous maintenanco items.
r
?
I 2
3 4
I. I orced Reason Melluid:
1.nlubit F - Instinciions S klied uled A-l qmpment I ailure(Explain) l-Manual hir Psepasation of Data li-Maintenance or Test 2-Manual Scram.
1:ntr> Sheets l'or I icemec C Relurling 3 Automatic Sr.un.
I sent Repois eI i R)I'de(NitRI G-D-Rerulaton Restriction 4-01her (lisplaini 0161) 1 Operato 1:anung & I nense I xainination l' Adounnts.iii.e 3
(, O veational I iro Ilaplain t l~sInbu !! Same Source i
Il Othei iI sg. lain) essoti) nee w w stre e
9
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH 00CKET NO.
50-?95 UNIT SONGS 1 DATE 6 May 1982 COMPLETED BY T._Raidy TELEPH0liE 714-492-7700 Ext. 702 Date/ Time Event April 1, 0001 Unit is in cold shutdown status for upgrading the Turbine building seismic restraints and to perform miscellaneous maintenance work.
April 6, 1035 "A" battery charger output circuit breaker was accidentally tripped open. This de-energized the No.1 D. C. bus because the battery circuit breaker was open in preparation for a battery load test.
April 6, 1039 "A" battery charger output circuit breaker closed, energizing No. 1 D. C. bus. No oper-ating problems resulted from this event.
April 25, 0625 No.1 Diesel Generator out of service for piston modification. Temporary Diesel Generators are installed to provide an emergency power supply to No. I and 2 480 volt buses.
I I
i l
l Pttoltl 370 NE w sf7e
r REFUELING INFORMATION
[
DOCKET NO.
50-206 UNIT SONGS i DATE 6 May 1982 COMPLETED BY T. Raidy TELEPHONE 714-492-??00 Ext. 702 1.
Scheduled date for next refueling shutdown.
July 1983 2.
Scheduled date for restart following refueling.
October 1983 3.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Not yet determined What will these be?
Not yet determined 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined 5.
Important licensing considerations associated with refueling, e.o.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined 6.
The number of fuel assemblies.
a)
In the core 157 b)
In the spent fuel storage pool.
94 7.
Licensed spent fuel storage capacity.
216 Intended change in spent fuel storage capacity.
None 8.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
March 1985
...oi.).n....n.
_