Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000296/LER-1982-011-01, /01T-0:on 820414,while Performing SI 4.1.A-7 Reactor Protection Sys Water Level Switches 3-LIS-3-203A, 203B & 203D Operated Out of Tech Spec Allowance.Caused by Setpoint Drift + (ML20052H494)
- ML20052H495 + (ML20052H495)
- ML20052H496 + (ML20052H496)
- ML20052H498 + (ML20052H498)
- ML20052H499 + (ML20052H499)
- 05000296/LER-1982-008-03, /03L-0:on 820331,while Performing Daily Source & Background Check of CAM-390-250,reactor & Turbine Bldg Vent Monitor,Inlet Sample Line Discovered Disconnected.Caused by Personnel Error.Sample Lines Reconnected + (ML20052H500)
- ML20052H501 + (ML20052H501)
- ML20052H502 + (ML20052H502)
- ML20052H503 + (ML20052H503)
- ML20052H504 + (ML20052H504)
- ML20052H505 + (ML20052H505)
- ML20052H507 + (ML20052H507)
- ML20052H508 + (ML20052H508)
- ML20052H509 + (ML20052H509)
- ML20052H510 + (ML20052H510)
- ML20052H511 + (ML20052H511)
- ML20052H513 + (ML20052H513)
- ML20052H515 + (ML20052H515)
- ML20052H516 + (ML20052H516)
- ML20052H517 + (ML20052H517)
- ML20052H518 + (ML20052H518)
- PNO-II-82-055, util Informed NRC of Delay of Projected Fuel Load Dates Until Oct 1984 & Oct 1986 for Units 1 & 2. Projected Commercial Operation Dates Will Be Delayed Until June 1985 & June 1987 + (ML20052H519)
- ML20052H520 + (ML20052H520)
- ML20052H522 + (ML20052H522)
- ML20052H524 + (ML20052H524)
- ML20052H526 + (ML20052H526)
- ML20052H528 + (ML20052H528)
- ML20052H529 + (ML20052H529)
- ML20052H530 + (ML20052H530)
- ML20052H532 + (ML20052H532)
- ML20052H533 + (ML20052H533)
- 05000338/LER-1982-023, Forwards LER 82-023/03L-0 + (ML20052H534)
- ML20052H536 + (ML20052H536)
- ML20052H537 + (ML20052H537)
- ML20052H540 + (ML20052H540)
- 05000338/LER-1982-023-03, /03L-0:on 820416,containment Average Temp Exceeded Max Limit.Caused by Loss of Auxiliary Steam to Chilled Water Sys Following Reactor Trip.Auxiliary Steam Pressure Restored & Chilled Water Sys Properly Adjusted + (ML20052H541)
- ML20052H542 + (ML20052H542)
- ML20052H543 + (ML20052H543)
- 05000338/LER-1982-024, Forwards LER 82-024/03L-0 + (ML20052H545)
- ML20052H547 + (ML20052H547)
- 05000321/LER-1982-019, Forwards LER 82-019/03L-0 + (ML20052H548)
- ML20052H550 + (ML20052H550)
- 05000338/LER-1982-024-03, /03L-0:on 820416,I-131 Dose Equivalent Exceeded 1.0 Mci/G Tech Spec Limit.Caused by Fuel Element Defect in Reactor core.Post-trip Conditions Enhanced Release of Fission Fragment Causing Iodine Spike.Rcs Returned Normal + (ML20052H552)
- 05000321/LER-1982-019-03, /03L-0:on 820330 During Surveillance of Fire Barrier Penetration Seals,Seals Found Breached in Areas of Control Bldg.Caused by Personnel Failure to Comply W/ Procedure HNP-1-6908M.Fire Watches Established + (ML20052H553)
- ML20052H554 + (ML20052H554)
- ML20052H555 + (ML20052H555)
- 05000296/LER-1982-010, Forwards LER 82-010/03L-0 + (ML20052H556)
- ML20052H558 + (ML20052H558)
- AECM-82-201, Final Deficiency Rept Re Broken Sample Probe on Recirculation Loop a Discharge Riser Spool Found in Reactor Vessel Bottom Head Area,Initially Reported 820406.Sample Probe for Unit 1 Replaced.Also Reportable Per Part 21 + (ML20052H559)
- ML20052H561 + (ML20052H561)
- ML20052H563 + (ML20052H563)