ML20052H498

From kanterella
Jump to navigation Jump to search
FOIA Request for Seven Categories of Documents Re Facility Proceedings
ML20052H498
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/17/1982
From: Hiatt S
OHIO CITIZENS FOR RESPONSIBLE ENERGY
To: Felton J
NRC OFFICE OF ADMINISTRATION (ADM)
References
FOIA-82-172 NUDOCS 8205210137
Download: ML20052H498 (2)


Text

, __ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

. , ,?

March 17, 1982 Mr. J.M. Felton, Director Division of Rules and Records Office of Administration FREEDOM OF IN U.S. Nuclear Regulatory Commission g ACI REOUESI Wasnington, D. C. 20555 M= / 71 FREEDOM OF INFORMATION ACT REQUEST  % W 4-1.-P2

~ - -

Dear Mr. Felton:

Pursuant to the Freedom of Information Act, S U.S.C. S 552, as amended, and the provisions of 10 CFR Part 9, the undersigned hereby requests the following items:

1. Documents specifying the materials used, and the dimensions and specifications thereof, for the piping from the heat exchangers to the cooling towers at the Perry Nuclear Power Plant, Docket No. 50-440/441.
2. Petition for Rulemaking on ATWS by Electric Utilities, Docket No. PRM-50-29. (45 FR 73080 (Nov. 4, 1980) and 46 FR 10501 (Feb. 3, 1981)).
3. Advance Notice of Proposed Rulemaking: Acceptance Criteria for Emergency Core Cooling Systems for Light Water Cooled Power Plants ( Part 50) , 43 FR 57157 ( De c. 6, 1978) and transcripts / minutes of meeting with General Electric and NRC Staff in June 1981, discussing proposed changes to the rule (mentioned in Regulatory Agenda, 46 FR 53608, Oct. 29, 1981).
4. Memorandum of Chairman Joseph M. Hendrie to Commissioners Gilinsky, Bradford, and Ahearne, "A TWS " , dated June 9, 1981.
5. NED0-10812, " Hydrogen Flammability and Burning Character- I istics in BWR Conteinments" (April 1973)
6. M.P. Paulson and J. O.'Bradfute, " Pressure and Temperature Transients Resulting from Postulated Hydrogen Fires in Mark III Containments" EI 75-4, Energy, Inc.
7. General Electric Nuclear Reactor Study and its related Sub-Tusk Force Reports, generally known as the Reed Report ( see CLI-80-35,12 NRC 409 for the decision regarding public disclosure of this document) .

In accordance with the Commission's policy as related in your response to my earlier FOIA request ( F0IA 516 ) , I request that 75% of the fees incurred for the search and production of those documents related to a contention admitted in the Perry proceeding by waived. The above documents r elate to the Perry proceeding as follows:

  1. 1 relates to Issue #3 (see LPB-81-24, 14 NRC 175 (July 28, 1981).

8205210137 820317 PDR FOIA HIATT82-172 PDR

I

....D' FOIA Request, p. 2

  1. 2 and //4 relate to Issue #6 (see LPB-81-24, 14 NRC 175 (July 28, 1981)).
  1. 3 relates to Issue #4 (see LPB-81-24, 14 NRC 175 (July 28, 1981)).
  1. 5 und #6 relate to Issue #8, admitted by a Memorandum and Order dated March 3, 1982.
  1. 7 - since the contents of this document are unknown to this requester, it is not known how the Reed Report relates to any contention admitted to the Perry proceeding.

It is entirely possible that portions of the Reed Report are relevant to one or more of the contentions admitted by the ASLB. If this is the case, the cost of producing those portions of the report should be reduced 75%.

This requester agrees to accept the residual (25%) charges for items 1-6 and the charges, as appropriate, for item 7.

Thank you for your assistance.

Sincerely, A

Susan L. Hiatt OCRE Interim Representative 8275 Munson Rd.

Mentor, OH 44060 (216) 255-3158