ML20052H558

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Improper Initialing of Seismic I Weld Data Repts,Initially Reported on 820414.Reportability Evaluation Will Be Completed by 820615
ML20052H558
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 05/13/1982
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, CQAD-82-838, NUDOCS 8205210211
Download: ML20052H558 (2)


Text

_ _ ,.

~

Caroline cwer & Light Company May 13, 1982

, N > -

2: d$5 File: SH N-2/18 CQAD 82-838 $ g;!

Item 79 -

Mr. James P. O". gilly D United StaM*, Nuclear Regulatory Commission w mS Regina . .. Go a_ narietta Street, Northwest w i$ 2" Atlanta, Georgia 30303 N SHEARON HARRIS NUCLEAR POWER PLANT, UNITS 1 & 2 DOCKET NOS. 50-400, 50-401 ,

IMPROPER INITIALING OF SEISMIC I INSPECTION RECORDS

Dear Mr. O'Reilly:

On April 14, 1982, the NRC (Mr. C. Julian) was notified by Carolina Power &

Light Company of an item considered potentially reportable per the provisions of 10CFR50.55 (e). The NRC was informed that an inspector ~ (J. H. Root) used initials other than his own on Unit 1 and 2 Seismic I hanger inspection records (weld data reports).

! The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter due to the extent of inspection records involved. It is now anticipated that the reportability evaluation will be completed by June 15, 1982, at which time, the NRC will be informed of the results. Completion of any corrective action, if required, will depend on the results of the evaluations and extent of corrective action. If the item is deemed reportable, the NRC will be so notified, and the projected date of completion of corrective action and final report provided through submittal of an interim letter.

Thank you for your consideration in this matter.

Yours very truly, wf N. . Chia gi - Ma er Engineeri Construction Quality Assurance / Quality Control 8205210211 820513 PDR ADOCK 05000400 S PDR WTH/pdd cca Mr. G. Maxwell l Mr. V. Stello (2)  !

f!33CIAL COPY l

l 411 Fayatteville Street

  • P. O. Box 1551
  • Raleigh, N. C 27602 g r/

ww.-mn ~~ m_am a , /

. ._ - _ .Yl

- r - -. 4 - -, & 4 - - . =

, . Mr. J. P. O'Railly -

2- May 13, 1982 bcc Mr. H. R. Banks Mr. D. L. Bensinger (HI/A-2D)

Mr. N. J. Chiangi Mr. A. B. Cutter Mr. C. R. Dietz Dr. T. S. Elleman Mr. G. L. Forehand Mr. T. L. Harrington Mr. E. Harris Mr. S. Hinnant Mr. P. W. Howe Mr. L. I. Loflin Mr. A. M. Lucas Mr. M. A. McDuffie Mr. C. H. Moseley, Jr.

Mr. R. M. Parsons Mr. Sheldon D. Smith Mr. R. B. Starkey a

J 4

i l

I i

i  ;

l r.- -, , - , , -~. , - ---

- , - ,. . - , . , ., - , , - , , , , . . . . ,.