Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045B898 + (ML20045B898)
- ML20045B899 + (ML20045B899)
- ML20045B902 + (ML20045B902)
- ML20045B904 + (ML20045B904)
- ML20045B905 + (ML20045B905)
- ST-HL-AE-4481, Monthly Operating Repts for May 1993 for Stp,Units 1 & 2.W/ + (ML20045B906)
- ML20045B909 + (ML20045B909)
- ML20045B913 + (ML20045B913)
- ML20045B915 + (ML20045B915)
- ML20045B919 + (ML20045B919)
- ML20045B922 + (ML20045B922)
- ML20045B923 + (ML20045B923)
- ML20045B924 + (ML20045B924)
- ML20045B929 + (ML20045B929)
- 05000327/LER-1993-013, :on 930514,fire Watch Was Not Performed within Time Frame Required by Tech Specs Due to Inadequate Supervision by Fire Protection Foreman.Fire Watch Patrol Reestablished + (ML20045B931)
- PNO-IV-93-019, on 930610,therapeutic Misadministration Incident Occurred Involving Omnitron High Dose Rate Therapy Unit.Treatment Stopped When Noticed Catheter in Wrong Position.Written Misadminstration Rept Will Be Provided + (ML20045B935)
- ML20045B936 + (ML20045B936)
- ML20045B940 + (ML20045B940)
- ML20045B944 + (ML20045B944)
- ML20045B947 + (ML20045B947)
- ML20045B948 + (ML20045B948)
- ML20045B949 + (ML20045B949)
- ML20045B955 + (ML20045B955)
- BSEP-93-0079, Suppl Special Rept 1-93-004 Re 930212 Failure of Latch Arm Gasket on Deluge Valve 20,resulting in Leak in Valve Pit.Due to Repeated Failures of Replacement Gaskets,Valve Will Not Be Repaired & Operable by 930415,as Stated in + (ML20045B957)
- ML20045B958 + (ML20045B958)
- ML20045B964 + (ML20045B964)
- ML20045B966 + (ML20045B966)
- ML20045B969 + (ML20045B969)
- ML20045B972 + (ML20045B972)
- ML20045B975 + (ML20045B975)
- ML20045B984 + (ML20045B984)
- ML20045B991 + (ML20045B991)
- 05000327/LER-1993-004, :on 930222,determined That Blind Flange on Elevation 734 Personnel Airlock Outer Housing Leaking.Due to Improper Installation of Blind Flange.Evaluation Performed of Other 14 Double O-ring Blind Flanges + (ML20045B995)
- ML20045B996 + (ML20045B996)
- ML20045B998 + (ML20045B998)
- ML20045B999 + (ML20045B999)
- ML20045C000 + (ML20045C000)
- ML20045C003 + (ML20045C003)
- ML20045C004 + (ML20045C004)
- 3F0693-07, Forwards 1993 Internal Cash Flow Projection for Facility,In Order to Update Util Utilization of Alternative to Satisfy Requirements of 10CFR140.21 for 1992.Anniversary Date of Company Indemnity Agreement June 20 + (ML20045C005)
- ML20045C006 + (ML20045C006)
- ML20045C007 + (ML20045C007)
- ML20045C008 + (ML20045C008)
- ML20045C010 + (ML20045C010)
- ML20045C012 + (ML20045C012)
- ML20045C016 + (ML20045C016)
- ML20045C017 + (ML20045C017)
- ML20045C018 + (ML20045C018)
- ML20045C019 + (ML20045C019)
- IR 05000192/1993002 + (ML20045C021)
- ML20045C022 + (ML20045C022)