ML20045C022

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-445/93-19 & 50-446/93-19 on 930418-0529.Violations Noted
ML20045C022
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 06/14/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20045C023 List:
References
NUDOCS 9306210405
Download: ML20045C022 (5)


See also: IR 05000445/1993019

Text

.

R Rf C

UkiTED STATES

',

y,

%

NUCLEAR REGULATORY COMMISSION

[

j

>*(

REGION IV

8

611 RYAN PLAZA DRIVE, SUITE 400

o

...../*

-

AR LINGTON TEXAS 760118064

,

a ,a y

Dockets:

50-445

50-446

Licenses:

NPF-87

NPF-89

TV Electric

ATTN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

SUBJECT: NRC INSPECTION REPORT 50-445/93-19; 50-446/93-19

This refers to the inspection conducted by Mr. D. N. Graves, and the

inspectors identified in the enclosed report, of this office, on April 18

through May 29, 1993.

The inspection included a review of activities

authorized for the Comanche Peak Steam Electric Station, Units 1 ar.d 2,

facility. At the conclusion of the inspection, the findings were discussed

with you and those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

The results of this inspection are documented on

pages 1-2 in the enclosed report.

One unresolved item was identified with respect to a Unit 2 power ramp rate

increase that exceeded the limits established in the operating procedure.

This matter is discussed in Section 2.2 of the enclosed inspection report. We

concur with your staff's assessment that the power increase only exceeded fuel

warranty limits and did not approach Technical Specification limits.

It was

also found that management's expectations for supervising, controlling, and

documenting the power increase were clearly established; however, we are

concerned with the personnel performance aspects of this event.

In

particular, the licensed operators' performance appeared to be similar to that

which contributed to the loss of spent fuel pool cooling event in May 1992.

In order for the NRC to further understand this issue, a management meeting

has been scheduled for July 8,1993, at the site.

We request that the meeting

include an overview of the event, a review of the licensed operators'

performance including supervisory oversight, an evaluation of the similarities

of this event with the previous loss of spent fuel pool cooling event, and a

discussion of the effectiveness of previous corrective actions and any

additional corrective actions planned and/or implemented.

We request also

that you discuss any performance based reviews that have been performed in the

!

,.

?g

9306210405 930614

i

PDR

ADDCK 05000445

G

PDR

.

g

'\\ )

/

. . .

,

.

,

.

TV Electr:ic

-4-

JUN I 41993

bec.to DMB (IE01)

.

bec distrib. by RIV:

J. L. Milhoan

Resident inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

Mis System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

D:DRP

,

RIV: SRI:DRP/E

SRl:DRP/B /

RI:DRP/B /

RI:DRP/B [

RMLatta h,

GEWerner h/

k/

DNGraves:w kj

WBJones

6/ti/93

'fp 6/u/93

ff

6/n/93

fri

6/n /93

f

h

PE:M

C:DRP/B

/

D:DRP

TRei

LAYandell bq

ABBeach h

6////93

6/o/93-

[

6//h93 0

180070

i

- - -

.

.

.

.

.

.

.

.

..

.

,

TV Electr-ic

-2-

past year by oversight organizations or cognizant departments which assessed

how well management expectations have been propagated to the staff and met.

In accordance with 10 CFR Section 2.790 of the NRC's " Rules of Practice," a

copy of this letter and its enclosure will be placed in the NRC's Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

<

to discuss them with you.

Sincerely,

A. Bill Beach, D tr t r-

Division of Reac'.

P oj cts

Enclosure:

l

Appendix - NRC Inspection Report

50-445/93-19; 50-446/93-19 w/ attachment

cc w/ enclosure:

TV Electric

ATTN:

Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GOS Associates, Inc.

Suite 720

1850 Parkway Place

i

Marietta, Georgia 30067-8237

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

)

'

Bethesda, Maryland 20814

l

- -

- .

. . . .

. .

_

_

_ _ _

_

,

_ _ _ _

_

-,

.

-

.

. .

. . - _ . -

- . .

_ . -

-

--

.

.

_ - _ .

- - . -

..

..

-

.

TV Electric

-3-

Jorden, Schulte, and Burchette

ATTN: William A. Burchette, Esq.

Counsel for Tex-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

Washington, D.C.

20007

Newman & Holtzinger, P.C.

ATTN: Jack.R. Newman, Esq.

.

1615 L. Street, N.W.

Suite 1000

Washington, D.C.

20036

' Texas Department of Licensing & Regulation

ATTN:

G. R. Bynog, Program Manager /

Chief Inspector

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

,

Honorable-Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

1

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas -78756

Owen L. Thero, President

Quality Technology Company

P.O. Box 408

1

~l

201 West 3rd

Lebo, Kansas 66856-0408

,

)

-4

,

.'

-

- . - , . - ,

.

__ _ ,____ _ _ _ _ __ _ _ _ _ ___ _ _ ____ _ ; _l

_

_

_

. _

_

__

.

.

.

.

TV Electric

-4-

JUN I 41993

bec to DMB (IE01)

bec distrib, by RIV:

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

D:DRP

,

RIV: SRI:DRP/E

SRI:DRP/B /

RI:DRP/B /

RI:DRP/B /

k/

RMLatta

/,

GEWerner D/

DNGraves:w Mf

WBJones

6/o/93

[at

6/n /93

h

6/u/93

Ytn 6/n/93

' ff

PE:QR C

C:DRP/B

/

D:DRP h

TRe

LAYandell by

ABBeach h

6////93

6/o/93

[

6//h93

-

-

-

-