Monthly Operating Repts for May 1993 for Vogtle Electric Generating Plant,Units 1 & 2.W/930614 Ltr
ML20045B902
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/31/1993
From: Hooper G, Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306210240
Download: ML20045B902 (13)


Text

cog a row cmr oany

. . 49 iruecen cemer Fam, a

rw ow cu ms Ri m qigt .mr:. A' $barna 35201 Te phone .?OS 877 71:'2

c. x. w. coy

,u. v;wv:~ nnw Georgia Power sjugg: p r o,w *  !?n' SmBtwarr1 c <x trc S(, tem June 14,1993 LCV-0038 Docket Nos. 50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPOEI Gentlemen:

Enclosed are the May 1993 monthly operating reports for Vogtle Units I and 2. These reports are submitted in accordance with Technical Specification 6.8.1.5.

Sincerely,

/

C. K. McCoy CKM/JLUgmb Enclosure xc: Georgia Power Company Mr. J. B. Beasley Mr. M. Sheibani NORMS U. S. Nuclear Regulatory Commission Mr. S. D. Ebneter, Regional Administrator Mr. D. S. Hood, Licensing Project Manager, NRR Mr. B. R. Bonser, Senior Resident Inspector, Vogtle 9iOOOa . , .

9306210240 930531 4 h 1 DR ADOCK 0500 [

ENCLOSURE 1 c

VOGTLE ELECTRIC GENERATING PLANT - UNIT I MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V1-1 OPERATING DATA REPORT Page VI-2 AVERAGE DAILY POWER LEVEL Page VI-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page VI-4 t

b F

NARRATIVE REPORT DOCKET NO. 50-424 11 UNIT 1 DATE: JUNE 1,1993 COMPLETED BY: G, L. HOOPER ,

TELEPHONE: (706) 826-4104-r MAY 01. 00:00 UNIT 1 AT 87% POWER, POWER ASCENSION IN PROGRESS.

MAY 03 04:06 UNIT 1 TURBINE TRIP! REACTOR TRIP CAUSED BY LOW EHC PRESSURE.

UNIT ENTERED MODE 3.

MAY 04 02:42 UNIT 1 COMMENCED REACTOR STARTUP, ENTERED MODE 2.

MAY 04 04:02 UNIT 1 REACTOR CRITICAL MAY 04 12:51 UNIT 1 ENTERED MODE 1.

MAY 05 17:13 GENERATOR TIED TO GRID.

MAY 07 15:46 UNIT 1 POWER UPRATE COMPLETE.

MAY 31 23:59 UNIT 1 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

t 9

V1-1

OPERATING DATA REPORT DOCKET NO. 50-424 .;

DATE: ' JUNE 1,1993 ,

COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104-O'PERATING STATUS

1. UNIT NAME: VEGP UNIT 1- ,

' 2. REPORT PERIOD: MAY 1993

3. LICENSED THERMAL POWER (MWt): 3565
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1151 >
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1212
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1158
8. IF CHANGES OCCUR IN CAPACITY RATINGS N/A (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE .
11. HOURS IN REPORTING PERIOD: 744 3623 52608 j
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 720.1 ' 2552.5 44754.4  !
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 - 0.0

' 14. HOURS GENERATOR ON-LINE:

682.9 2462.9 43757.9

15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0

- 16. GROSS THERMAL ENERGY GENERATED (MWH): 2401502 8227877 145597280

17. GROSS ELEC. ENERGY GENERATED (MWH): 816045 2811055 48792040
18. NET ELEC. ENERGY GENERATED (MWH): 779425- 2673245 46314210
19. REACTOR SERVICE FACTOR 96.8 % 70.5 % - 85.1%
20. REACTOR AVAILABILITY FACTOR 96.8 % 70.5 % 85.1 % <
21. UNIT SERVICE FACTOR: 91.8  % 68.0 % 83.2 %
22. UNIT AVAILABluTY FACTOR: 91.8 % 68.0 % 83.2 %
23. UNIT CAPACITY FACTOR (USING MDC NET): 90.5 % 65 4 % 80.7%
24. UNIT CAPACITY FACTOR (USING DER NET): 91.0  % 65.8% 79.9% ,
25. UNIT FORCED OUTAGE RATE: 8.2% 2.9% - 6.1%. .j

.26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH).

NONE  ;

27. IF SHUTDOWN AT ENC OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A 1

.I J

-I V1-2  ;

.l I

UNIT 1 - AVERAGE DAILY DOCKET NO. 50-424 POWER LEVEL DATE: JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 DAY Not MW 1 .-.. . ... . 1065 2.. .. .. 1110 ,

3= . . 109 4 . .. . . . . 0 5... 57

6. . .. 982 7 ... . . . . .. 1128 8 . .. . 1164 *
9. . . 1169*

10 .. .. . ... 1169

  • 11 . 1169
  • 12 . .. . .. 1169
  • 13 . . . 1172
  • 14 . .. .. 1175*

15 .. 1171

  • 16 .. . . . 1169
  • 17 . .. . 1166
  • 18 . .. 1165 * .

19 . . ... . 1171

  • 20 . . .. 1175
  • 21 .. . . . 1179 * ,

22 . .. . . . . . . . 1180

  • 23 . . . .. 1175
  • 24 . .. .. .. . . . . 1170
  • 25 . .. . . .. 1167
  • 26 . . 1166
  • 27 . . . . .. 1168
  • 28 . . ... . 1167
  • 29 . . . 1166
  • 30 . . .. 1166
  • 31 . . . 1164 *
  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS V1-3 L.

1 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-424 DATE: JUNE 1,1993 UNIT NAME: VEGP UNIT 1 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 REPORT MONTH MAY 1993 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO -

NO. DATE E (HOURS) N D NUMBER ME (SUBCODE) PREVENT RECURRENCE 93-4 5/3 F 61.1 A 3 1-93-009 TG P SEE BELOW

~

F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION -

F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN)

EVENT 03-4 CAUSE: TURBINE TRIP / REACTOR TRIP DUE TO LOW ELECTROIlYDRAULIC CONTROL (EllC) SYSTEM PRESSURE.

TIIE DIRECT CAUSE OF Tills EVENT WAS A FAILURE OF Tile *A" EllC PUMP, ALONO WITil TIE FAILUIE OF TIE STANDBY ElIC PUMP TO AUTO START AT Tile CORRECT PRESSURE. TIIE COMBINATION OF TIIE TWO FAILURES PREVENTED TIIE EllC PUMPS FROM PROPERLY M.AINTAINING EllC PRESSURE.

1 CORRECTIVE ACTION: TIE DEFECTIVE EllC PUMP WAS REPLACED, AND TlIE ElIC SYSTEM WAS DRAINED AND REFILLED PRIOR TO BEING RESTORED TO SERVICE. Tile LOW EllC PRESSURE ALARM AND STANDBY PUMP AUTOSTART PRESSURE SWITCIIES WERE CALIBRATED AND ADJUSTED TO TIIE CORRECT SETPOINTS.

V1-4 l

ENCLOSURE 2 VOGTLE ELECTRIC GENERATING PLANT - UNIT 2 MONTHLY OPERATING REPORT FOR MAY 1993 TABLE OF CONTENTS NARRATIVE REPORT Page V2-1 OPERATING DATA REPORT Page V2-2 AVERAGE DAILY POWER LEVEL Page V2-3 UNIT SHUTDOWNS AND POWER REDUCTIONS Page V2-4

i 1

. . l NARRATIVE REPORT DOCKET NO. 50-425 l UNIT 2 DATE: JUNE 1,1993 j COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 1

=

MAY 01 00.00 UNIT 2 AT 100% POWER WITH NO OPERATIONAL PROBLEMS.

MAY 11 15:00 UNIT 2 BEGAN POWER UPRATE PROCESS.

MAY 17 05:03 UNIT 2 POWER UPRATE COMPLETED. CONTROLVALVES REACHED THE FULL OPEN POSITION AT 99% POWEF'.

MAY 31 23:59 UNIT 2 AT 99% POWER.

t V2-1

1 1

OPERATING DATA REPORT DOCKET NO. 50-425 DATE: JUNE 1,1993 .

COMPLETED BY: G. L. HOOPER l TELEPHONE: (706) 826-4104 i l

l OPERATING STATUS

- 1. UNIT NAME: VEGP UNIT 2' j

2. REPORT PERIOD: MAY 1993
3. LICENSED THERMAL POWER (MWt): 3565 *
4. NAMEPLATE RATING (GROSS MWe): 1215
5. DESIGN ELECTRICAL RATING (NET MWe): 1151 *
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 1211 *
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 1157 *
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
  • CHANGES RESULT FROM THE UNIT UPRATE l APPROVED BY AMMENDMENT 39 TO FACILITY OPERATING LICENSE NPF-81. THE DESIGN ELECTRICAL RATING IS AN ESTIMATE WHICH Wil.L BE REVISED AFTER UNIT PERFORMANCE TESTING.
9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS

- 10. REASONS FOR RESTRICTION,IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD: 744 3623 35352
12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 3623.0 31868.9
13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE: 744.0 3623.0 31410.6
15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH): 2577663 12392003 102880351
17. GROSS ELEC. ENERGY GENERATED (MWH): 883973 4278566 34863842
18. NET ELEC. ENERGY GENERATED (MWH): 844963 4087766 33154342
19. REACTOR SERVICE FACTOR 100.0 % 100.0 % 90.1 %
20. REACTOR AVAILABILITY FACTOR 100.0 % 100.0 % 90.1 %
21. UNIT SERVICE FACTOR: 100.0% 100.0% 88.9 % I
22. UNIT AVAILABILITY FACTOR: 100.0 % 100.0% 88.9 % l
23. UNIT CAPACITY FACTOR (USING MDC NET): 100.4  % " 101.5 % 85.1 %
24. UNIT CAPACITY FACTOR (USING DER NET): 98.7 % 101.5 % 85.1 %
25. UNIT FORCED OUTAGE RATE: 0.0% 0.0% 1.7% l
26. SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

i REFUELING, SEPTEMBER 11,1993,37 DAYS

27. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: NA ,

" THE CAPACITY FACTOR (USING MDC NET) FOR THE MONTH OF MAY WAS CALCULATED USING A  !

MONTHLY AVERAGE MDC VALUE OF 1134.4. THIS IS BA0ED ON UPRATING MAY 17,1993.

l I

V2-2 i l

i

UNIT 2 AVERAGE DAILY DOCKET NO. 50425 POWER LEVEL DATE: JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 DAY Net MW 1.. .. 1118 *

2. . 1115
  • 3 .. . .. . 1114 *
4. . 1110
  • 5 .. .. 1113
  • 6 .. . . . . . 1113*

7...... . 1113*

8. . 1114 *
9. . . 1116 *
10. .. . 1117
  • 11 . . . 1116
  • 12 . . ... 1113
  • 13 . . . 1119
  • 14 . .. . 1119 * >

15 .. . . . . . . 1117

  • 16 . . . . 1113
  • 17 . . . .. 1149 18 . .. . 1150 19 . . . . . .. 1156
20. . 1160
  • 21 . . . . 1167
  • 22 . . . . 1171
  • 23..... , . . . . , . 1168
  • 24 . .. . . . . 1162
  • 25... . 1159 *  ;

26 . . . 1157 * 'l 27..... . . . 1156 I 28... . . .. 1156 l 29 . .. , 1154 l 30 . . . 1154 l

31 . . . . . .. 1153 l

l

  • MDC CAN BE EXCEEDED UNDER OPTIMAL CONDITIONS l l

V2-3 l

l

s UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-425 )

DATE: JUNE 1,1993 UNIT NAME: VEGP UNIT 2 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 REPORT MONTH MAY 1993 R M S E E Y T A T LICENSEE SC Y S H EVENT TO COMPONENT CAUSE & CORRECTIVE P DURATION O O REPORT ED CODE ACTION TO NO. DATE E (HOURS) N D NUMBER ME XSUBCODE) PREVENT RECURRENCE NA NA NA NA NA NA NA NA NA NA F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL ' A GREATER THAN 20%

B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEDING 24 HOURS.

E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9 - OTHER (EXPLAIN)

G-OPERATIONAL ERROR (EXPLAIN)

H-OTHER (EXPLAIN) s 4

i n

4 4

4 ENCLOSURE 3 VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 MONTHLY OPERATING REPORT FOR MAY 1993 CHALLENGES TO PORV OR SAFETY VALVES I

a f

-i e ***

e 1

(ENCLOSURE 3)  ;

DOCKET NOS. 504 24,50-425-VEGP UNITS 1 & 2 DATE: JUNE 1,1993 COMPLETED BY: G. L. HOOPER TELEPHONE: (706) 826-4104 EVENT DATE TAG NO. TYPE DEFCRIPTION NO EVENTS FOR MAY