UMIT E D ST AT E S
[pR RE Ggk
NUCLEAR REGULATORY COMMISSION .
.
'
[
,,(
($ $ j
REGION IV
8
G11 RYAN PLAZA ORIVE, SUITE 400
o
?,
[
AR LINGT ON. T E XAS 76011-8064
.j
- "*
JUN 151993
<
Docket:
50-192
License:
R-92
The University of Texas at Austin
ATTN:
Dr. Bernard W. Wehring, Director
Nuclear Engineering Teaching Laboratory
10100 Burnet Road
SUBJECT:
NRC INSPECTION REPORT 50-192/93-02
,
This refers to the inspection conducted by Mr. Wesley L. Holley of this office
on June 1, 1993.
The inspection included a review of your activities
authorized for your TRIGA - MARK I Research Reactor.
At the conclusion of the
inspection, the findings were discussed with members of your staff identified
in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examination and
representative records, interviews with personnel, and the observation of
activities in progress.
The results of this inspection are documented in the
enclosed report.
'
The inspection involved the coordination of followup confirmatory radiological
survey activities which were performed'by our contractor, Oak Ridge Institute
for Science and Education (ORI$E).
This confirmatory survey was performed as
the result of the concerns identified in NRC Inspection Report'50-192/93-01
and involved the pit area from which the reactor pool liner had been removed.
This followup survey completes the planned decommissioning survey activities
for your TRIGA - MARK I Research Reactor. We will notify you concerning the
status of your facility after we have received the final . Confirmatory Survey
Report from ORISE.
If the survey results indicate that radiation levels are
above the release criteria for unrestricted use, you will be notified and
further decontamination may be required before the decommissioning of your
facility is considered completed.
In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice,' a copy
of this letter and its enclosure will be placed in the NRC Public Document
'
Room.
9306220402 930615
F
'/
- f
ADOCK 05000192 f
I
G
$
I
-
.. ,
, ' .
,
I
,
,
DISTRIBUTION:
,
becito10MB'(IE01).
bec:
'
J. L. Milhoan, RA
L. J. Callan, DRSS
B. Murray, FIPS
W. L. Holley, FIPS
MIS Coordinator
'
RIV File
FIPS File
Lisa Shea, RM/ALF (MS 4503)
A. Adams, NRR Project Manager (MS 11 B20)
J. L. Caldwell, NRR (MS 10 022)
$
180060
.
.
__
-
+
,
. ~ .
The University of Texas
-2-
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
'
.
s
,
. J,
Cal an, Director
Divit 'on of Radiation Safety
and Safeguards
Enclosure:
Appendix - NRC Inspection Report
50-192/93-02-
cc:
The University of Texas at Austin
ATTN: Dr. Thomas Bauer
Reactor. Supervisor
Nuclear Engineering Teaching Lab.
10100 Burnet Road
The University of Texas at Austin
ATTN:
Mr. W._Bryant
Radiation Safety Officer
Environmental Health and Safety
>
Service Building, Rm. 202
Radiation Control Program Director
Bureau of Radiation Control
Dept. of Health
1100 W. 49th Street
Office of the Governor
ATTN:
Susan Rieff
Director of Environmental Policy
P.O. Box 12428
.
'
,
l
-
. , .
-
The University of Texas
-3-
'
bcc to DMB (IE01)
.
bcc-
i
J. L. Milhoan, RA
L. J. Callan, DRSS
- B. Murray, FIPS
- W. L. Holley, FIPS
- MIS Coordinator
- RIV File
- FIPS File
Lisa Shea, RM/ALF (MS 4503)
A. Adams, NRR Project Manager (MS 11 B20)
J. L. Caldwell, NRR (MS 10 D22)
- w/ IFS
.,
,
RIV:FIPS h
C:FIPS M
DD:QRSS
Dh
WLHolley:nb
BMurray k (hDChYberlain
LJClllan
o/h93
h /\\ Q/93
(9 /)h/93
\\,[/li/93
'
v.--
,
l
.
.