Forwards Insp Rept 50-192/93-02 on 930601.Violations Noted
ML20045C019
Person / Time
Site: 05000192
Issue date: 06/15/1993
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Wehring B
TEXAS, UNIV. OF, AUSTIN, TX
Shared Package
ML20045C020 List:
References
NUDOCS 9306210402
Download: ML20045C019 (4)


See also: IR 05000192/1993002

Text

.

'

.

UMIT E D ST AT E S

[pR RE Ggk

NUCLEAR REGULATORY COMMISSION .

.

'

[

,,(

($ $ j

REGION IV

8

G11 RYAN PLAZA ORIVE, SUITE 400

o

?,

[

AR LINGT ON. T E XAS 76011-8064

.j

    • "*

JUN 151993

<

Docket:

50-192

License:

R-92

The University of Texas at Austin

ATTN:

Dr. Bernard W. Wehring, Director

Nuclear Engineering Teaching Laboratory

10100 Burnet Road

Austin, Texas 78712

SUBJECT:

NRC INSPECTION REPORT 50-192/93-02

,

This refers to the inspection conducted by Mr. Wesley L. Holley of this office

on June 1, 1993.

The inspection included a review of your activities

authorized for your TRIGA - MARK I Research Reactor.

At the conclusion of the

inspection, the findings were discussed with members of your staff identified

in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examination and

representative records, interviews with personnel, and the observation of

activities in progress.

The results of this inspection are documented in the

enclosed report.

'

The inspection involved the coordination of followup confirmatory radiological

survey activities which were performed'by our contractor, Oak Ridge Institute

for Science and Education (ORI$E).

This confirmatory survey was performed as

the result of the concerns identified in NRC Inspection Report'50-192/93-01

and involved the pit area from which the reactor pool liner had been removed.

This followup survey completes the planned decommissioning survey activities

for your TRIGA - MARK I Research Reactor. We will notify you concerning the

status of your facility after we have received the final . Confirmatory Survey

Report from ORISE.

If the survey results indicate that radiation levels are

above the release criteria for unrestricted use, you will be notified and

further decontamination may be required before the decommissioning of your

facility is considered completed.

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice,' a copy

of this letter and its enclosure will be placed in the NRC Public Document

'

Room.

9306220402 930615

F

'/

f

PDR

ADOCK 05000192 f

I

G

PDR

$

I

-

.. ,

, ' .

,

I

,

,

DISTRIBUTION:

,

becito10MB'(IE01).

bec:

'

J. L. Milhoan, RA

L. J. Callan, DRSS

B. Murray, FIPS

W. L. Holley, FIPS

DRP

MIS Coordinator

'

RIV File

FIPS File

Lisa Shea, RM/ALF (MS 4503)

A. Adams, NRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 022)

$

180060

.

.

__

-

+

,

. ~ .

The University of Texas

-2-

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

'

.

s

,

. J,

Cal an, Director

Divit 'on of Radiation Safety

and Safeguards

Enclosure:

Appendix - NRC Inspection Report

50-192/93-02-

cc:

The University of Texas at Austin

ATTN: Dr. Thomas Bauer

Reactor. Supervisor

Nuclear Engineering Teaching Lab.

10100 Burnet Road

Austin, Texas 78712

The University of Texas at Austin

ATTN:

Mr. W._Bryant

Radiation Safety Officer

Environmental Health and Safety

>

Service Building, Rm. 202

Austin, Texas 78712-1024

Radiation Control Program Director

Bureau of Radiation Control

Dept. of Health

1100 W. 49th Street

Austin, Texas 78756-3189

Office of the Governor

ATTN:

Susan Rieff

Director of Environmental Policy

P.O. Box 12428

Austin, Texas 78711

.

'

,

l

-

. , .

-

The University of Texas

-3-

'

bcc to DMB (IE01)

.

bcc-

i

J. L. Milhoan, RA

L. J. Callan, DRSS

  • B. Murray, FIPS
  • W. L. Holley, FIPS
  • MIS Coordinator
  • RIV File
  • FIPS File

Lisa Shea, RM/ALF (MS 4503)

A. Adams, NRR Project Manager (MS 11 B20)

J. L. Caldwell, NRR (MS 10 D22)

  • w/ IFS

.,

,

RIV:FIPS h

C:FIPS M

DD:QRSS

Dh

WLHolley:nb

BMurray k (hDChYberlain

LJClllan

o/h93

h /\\ Q/93

(9 /)h/93

\\,[/li/93

'

v.--

,

l

.

.