Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000271/LER-1981-031, Forwards LER 81-031/03L-0 + (ML20039B097)
- ML20039B099 + (ML20039B099)
- ML20039B100 + (ML20039B100)
- ML20039B102 + (ML20039B102)
- ML20039B103 + (ML20039B103)
- ML20039B104 + (ML20039B104)
- 05000271/LER-1981-031-03, /03L-0:on 811109,setpoint of Standby Liquid Control Relief Valve Found to Exceed Tech Specs Range.Caused by Setpoint Drift Apparently Due to Crystallization of Sodium Pentaborate on Disc/Seat Interface + (ML20039B106)
- ML20039B107 + (ML20039B107)
- 05000271/LER-1981-027, Forwards Updated LER 81-027/03X-1 + (ML20039B108)
- ML20039B110 + (ML20039B110)
- ML20039B111 + (ML20039B111)
- ML20039B113 + (ML20039B113)
- 05000271/LER-1981-027-03, MSIV-80C Failed to Close on Receipt of Group 1 Isolation Signal During Reactor Scram. Caused by Actuator Failure.Actuator Completely Overhauled & Guide Rods,Spring Plate & Bushings Replaced + (ML20039B114)
- ML20039B115 + (ML20039B115)
- ML20039B116 + (ML20039B116)
- 05000245/LER-1981-036, Forwards LER 81-036/03L-0.Detailed Event Analysis Encl + (ML20039B117)
- ML20039B119 + (ML20039B119)
- ML20039B120 + (ML20039B120)
- ML20039B121 + (ML20039B121)
- 05000245/LER-1981-036-03, /03L-0:on 811112,pressure Switch 2206-1621D Tripped Outside Allowable Band.Caused by Setpoint Drift. Switch Readjusted + (ML20039B123)
- ML20039B124 + (ML20039B124)
- 05000271/LER-1981-033, Forwards LER 81-033/01T-0 + (ML20039B125)
- ML20039B127 + (ML20039B127)
- 05000271/LER-1981-033-01, /01T-0:on 811125,reactor Bldg Roof Hatch Opened by Work Crew W/O Notice to Supervisor Until Fire Permit for Welding Requested.Caused by Personnel Error.Personnel Reinstructed Re Procedural Requirement + (ML20039B128)
- AECM-81-481, Forwards Revised Process Control Program, in Response to Discussions W/Nrc & 811208 Telcon Re Proposed Program Changes.Revision Includes Instructions for Solidification of Radwaste Slurry & Evaporator Botton Concentrates + (ML20039B129)
- ML20039B131 + (ML20039B131)
- ML20039B132 + (ML20039B132)
- ML20039B133 + (ML20039B133)
- ML20039B135 + (ML20039B135)
- ML20039B137 + (ML20039B137)
- 05000318/LER-1981-051, Forwards LER 81-051/03L-0 + (ML20039B138)
- IR 05000133/1981004 + (ML20039B140)
- ML20039B141 + (ML20039B141)
- ML20039B142 + (ML20039B142)
- ML20039B144 + (ML20039B144)
- IR 05000285/1981019 + (ML20039B145)
- ML20039B147 + (ML20039B147)
- 05000318/LER-1981-051-03, /03L-0:on 811109,RCS Net Leakage Found to Be 2.1 Gpm.Caused by Crack Due to Vibrations in Weld on Adapter to Tubing on Reactor Coolant Pump Middle Seal Pressure Sensing Line.Engineering Evaluation Continuing + (ML20039B148)
- ML20039B149 + (ML20039B149)
- ML20039B151 + (ML20039B151)
- 05000286/LER-1981-009, Forwards LER 81-009/03L-0 + (ML20039B152)
- ML20039B154 + (ML20039B154)
- ML20039B155 + (ML20039B155)
- 05000286/LER-1981-009-03, /03L-0:on 811110,battery Charger 31 Tripped.Cause Not specified.Delta-P Air Flow Sensing Switch Replaced + (ML20039B158)
- AECM-81-504, Provides Info Re Analysis to Be Performed by GE for Fuel Assembly Liftoff,In Responses to NRC Request for Addl Info in Support of Facility SER (NUREG-0831).Analysis of Impact Loads Will Be Performed Independently + (ML20039B159)
- ML20039B160 + (ML20039B160)
- ML20039B161 + (ML20039B161)
- ML20039B162 + (ML20039B162)
- ML20039B164 + (ML20039B164)
- B10268, Forwards Safety Assessment Rept for SEP Topic II-3.A, Hydrologic Description,Per 810729 Commitment + (ML20039B165)
- ML20039B166 + (ML20039B166)