Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20036C468 + (ML20036C468)
- ML20036C469 + (ML20036C469)
- ML20036C470 + (ML20036C470)
- ML20036C474 + (ML20036C474)
- ML20036C476 + (ML20036C476)
- ML20036C478 + (ML20036C478)
- ML20036C480 + (ML20036C480)
- ML20036C481 + (ML20036C481)
- ML20036C482 + (ML20036C482)
- ML20036C484 + (ML20036C484)
- ML20036C485 + (ML20036C485)
- ML20036C486 + (ML20036C486)
- ML20036C489 + (ML20036C489)
- RC-93-0158, Forwards Annual ECCS Evaluation Model Revs Rept.New Analysis of Record Established for SG Tube Inservice Insp, Incorporating Reported Model Changes & 25% Tube Plugging. FSAR Will Be Updated to Reflect New Analysis + (ML20036C490)
- ML20036C491 + (ML20036C491)
- 05000298/LER-1993-022, :on 930514,emergency Transformer Low Voltage Alarm Received & Actual Low Voltage Condition Did Not Exist.Caused by Human Factors & Unanticipated Design Problems.Addl Input Provided to Window + (ML20036C495)
- ML20036C497 + (ML20036C497)
- ML20036C499 + (ML20036C499)
- ML20036C501 + (ML20036C501)
- ML20036C502 + (ML20036C502)
- ML20036C503 + (ML20036C503)
- ML20036C504 + (ML20036C504)
- 3F0693-09, Monthly Operating Rept for May 1993 for Crystal River,Unit 3 + (ML20036C507)
- HL-3348, Monthly Operating Repts for May 1993 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20036C508)
- ML20036C511 + (ML20036C511)
- ML20036C512 + (ML20036C512)
- ML20036C517 + (ML20036C517)
- ML20036C521 + (ML20036C521)
- ML20036C522 + (ML20036C522)
- ML20036C524 + (ML20036C524)
- ML20036C527 + (ML20036C527)
- ML20036C528 + (ML20036C528)
- ML20036C593 + (ML20036C593)
- RA-20-0042, SR-2020-001 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Non-Functional for Greater than 7 Days + (ML20036C598)
- ML20036C746 + (ML20036C746)
- 3F1195-18, Requests Exemption from 10CFR73.55 to Allow Contractors to Carry Plant Identification Badges Home.Informs That Issuance of Exemption Will Allow FPC to Utilize Hand Geometry Devices in Conjunction W/Identification Badges.Encl Withheld + (ML20036C773)
- ML20036C829 + (ML20036C829)
- IR 05000289/2019010 + (ML20036C837)
- ML20036C838 + (ML20036C838)
- PMNS20200088, Pre-Submittal Meeting with Tennessee Valley Authority Planned Sequoyah Nuclear Plant, Units 1 and 2, License Amendment Request for Transition to the Use of Westinghouse Fuel and for Extended Operation with One Unit 1 Control Rod Removed + (ML20036C869)
- NLS2020001, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2019 + (ML20036C961)
- ET 20-0002, Response to Request for Additional Information Regarding Utilizing Code Case N-666-1, Weld Overlay of Class 1, 2, and 3 Socket Welded Connections, Section XI, Division 1 + (ML20036C963)
- ML20036C968 + (ML20036C968)
- ML20036C971 + (ML20036C971)
- ML20036C973 + (ML20036C973)
- ML20036C976 + (ML20036C976)
- ML20036C979 + (ML20036C979)
- ML20036C983 + (ML20036C983)
- ML20036C988 + (ML20036C988)
- ML20036C990 + (ML20036C990)
- ML20036D129 + (ML20036D129)