Monthly Operating Rept for May 1993 for Hope Creek Generating Station,Unit 1
ML20036C489
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/31/1993
From: Hovey R, Zabielski V
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9306180184
Download: ML20036C489 (8)


Text

.

t June 11, 1993 U.

S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 f

Dear Sir:

MONTHLY OPERATING REPORT HOPE CREEK GENERATION STATION UNIT 1 DOCKET NO. 50-354 In compliance with Section 6.9, Reporting Requirements for the Hope Creek Technical Specifications, the operating statistics for May are being forwarded to you. The summary of changes, tests, and experiments that were implemented during May 1993 pursuant to the requirements of 10CFR50.59(b)'will be included with the report for the month of June 1993.

Sincerely yours, b

6[-

/ R. J. Ho ey General Manager -

Hope Creek Operations DR:pw Attachments C

Distribution 1

I

'y'I fl 9306180184 930531 M

f(N PDR 'ADOCK 05000354 R

PDR

k INDEX NUMBER SECTION OF PAGES Average Daily Unit Power Level.

1 Operating Data Report.

2 Refueling Information.

1 Monthly operating Summary.

1 Summary of Changes, Tests, and Experiments.

1 l

)

1

- 1

s OPERATING DATA REPORT DOCKET NO.

50-354 UNIT Hope Creek DATE 6/11/93 aj COMPLETED BY V.

Zabielski V TELEPHONE (609) 339-3506 OPERATING STATUS 1.

Reporting Period May 1993 Gross Hours in Report Period 111 2.

Currently Authorized Power Level (MWt) 3293 Max. Depend. Capacity 1031 Design Electrical Ratin(MWe-Net) g (MWe-Net) 1067 3.

Power Level to which restricted (if any) (MWe-Net)

None 4.

Reasons for restriction (if any)

This Yr To Month Date Cumulative 5.

No. of hours reactor was critical 663.0 3542.0 47797.6 6.

Reactor reserve shutdown hours 0.0 0.0 0.0 7.

Hours generator on line 643.9 3522.9 47027.8 8.

. Unit reserve shutdown hours 222 222 222 9.

Gross thermal energy generated 1967098 11390119 149603338 (MWH)

10. Gross electrical energy 650130-3825920 49573974 generated (MWH)
11. Net electrical energy generated 619448 3662857 47365241 (MWH)-
12. Reactor service factor 89.1 97.8 84.6
13. Reactor availability factor 89.1 97.8 332fi
14. Unit service factor 86.5 97.2 83.2
15. Unit availability factor 86.5 97.2 83.2
16. Unit capacity factor (using MDC) 80.8 98.1 81.3
17. Unit capacity factor 78.0 94.8 78,5 (Using Design MWe)
18. Unit forced outage rate 13.5 Zig 4.6
19. Shutdowns scheduled over next 6 months (type, date, & duration):

None

20. If shutdown at end of report period, estimated date of start-up:

N/A

4 t

OPERATING DATA REPORT UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-354 UNIT Hope Creek DATE 6/10/93 COMPLETED BY V.

Zabielski TELEPHONE (609) 339-3506 MONTH May 1993 1

1 METHOD OF

(

SHUTTING DOWN THE TYPE REACTOR OR F= FORCED DURATION REASON REDUCING CORRECTIVE NO.

DATE S= SCHEDULED (HOURS)

(1)

POWER (2)

ACTION / COMMENTS 1

5/13 F

0 A

5 AX501 transformer Hi-pot Failure 2

5/16 F

100.1 A

3 EHC Failure

'I

t 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-354 1

UNIT HoDe Creek DATE 6/11/93 COMPLETED BY V.

Zabielski TELEPHONE (609) 339-3506 MONTH May 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

'1.

1931 17.

2 3

1048 18.

A 3.

1081 19.

A 4.

1043 20.

112 5.

1056 21.

677 6.

1047 22.

1054 7.

1041 23.

1067 8.

1058 24.

1061 9.

1042 25.

1036 10.

1040 26.

1062 11.

1023 27.

1039 12.

1064 28.

1034 13.

122 29.

1031 14, 521 30.

1054 15.

588 31.

1048 16.

22 l

-)

i

REFUELING INFORMATION DOCKET NO.10-354 UNIT E3De Creek DATE 1/10/93 COMPLETED BY E. Hollinasworth TELEPHONE 1509) 339-1051 MONTH May 1993 1.

Refueling information has changed from last month:

Yes No X 2.

Scheduled date for next refueling:

3/5/94 3.

Scheduled date for restart following refueling:

4/23/94 4.

A.

Will Technical Specification changes or other license amendments be required?

Yes No X

B.

Has the Safety Evaluation covering the COLR been reviewed by the Station Operating Review Committee?

Yes No X

If no, when is it scheduled?

2/18/94 5.

Scheduled date(s) for submitting proposed licensing action:

H21 scheduled 6.

Important licensing considerations associated with refueling:

- The discussion of moving the RBM sepoint out of tech specs and into the Core Operating Limits Report concluded that it cannot be done in time for start of Cycle 6.

7.

Number of Fuel Assemblies:

A.

Incore 764 B.

In Spent Fuel Storage (prior to refueling) 1008 C.

In Spent Fuel Storage (after refueling) 1240 8.

Present licensed spent fuel storage capacity:

4006 Future spent fuel storage capacity:

4006 9.

Date of last refueling that can be discharged 5/3/2006 to spent fuel pool assuming the present (EOC13) licensed capacity:

(Qggs allow for full-core offload)

(Assumes 244 bundle reloads every 18 months until then) i (Does U21 allow for smaller reloads due to improved fuel)

J

1 o

HOPE CREEK GENERATING STATION MONTHLY OPERATING

SUMMARY

MAY 1993 Hope Creek entered the month of May at approximately 100% power, until May 13 when power was reduced to approximately 60% due te a loss of offsite power caused by a faulty pot head in the switchyard AX501 transformer.

On May 16 the unit tripped diue to a faulty component in the EHC System. The Unit returned to service on May 20 and was at full power on May 22 and remained at full power through the remainder of the month.

The unit was on line for 162 consecutive days prior to the unit shutdown on May 16, 1993.

J

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS FOR THE HOPE CREEK GENERATING STATION MAY 1993 The May summary will be reported in combination with the June summary next month.

.