Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000278/LER-1993-003-03, :on 930310,discovered That Reactor Vessel Head Vents Closed & pressure-temp Data Not Obtained.Caused by Operator Not Fully Moving Control Switches to Auto Position. Head Vents Restored to Proper Position + (ML20035D380)
- 05000338/LER-1993-010, :on 930323,SWP Started Unexpectedly During Performance of Reactor Protection & ESF Response Time Testing.Caused by Inadequate Procedures.Procedures Will Be Revised Prior to Next Refueling Outage + (ML20035D386)
- ML20035D387 + (ML20035D387)
- ML20035D389 + (ML20035D389)
- ML20035D390 + (ML20035D390)
- ML20035D391 + (ML20035D391)
- ML20035D392 + (ML20035D392)
- ML20035D395 + (ML20035D395)
- ML20035D397 + (ML20035D397)
- ML20035D398 + (ML20035D398)
- ML20035D399 + (ML20035D399)
- ML20035D400 + (ML20035D400)
- ML20035D403 + (ML20035D403)
- ML20035D405 + (ML20035D405)
- ML20035D406 + (ML20035D406)
- ML20035D410 + (ML20035D410)
- IR 05000327/1993010 + (ML20035D411)
- ML20035D412 + (ML20035D412)
- ML20035D413 + (ML20035D413)
- ML20035D414 + (ML20035D414)
- ML20035D415 + (ML20035D415)
- ML20035D416 + (ML20035D416)
- 05000298/LER-1993-005, :on 930310,excessive Primary Containment Leakage Discovered During Local Leak Rate Testing of Reactor Check Valves.Caused by Equipment Deficiency.Valve Body & Disc Being Precision line-bored + (ML20035D420)
- ML20035D421 + (ML20035D421)
- ML20035D427 + (ML20035D427)
- ML20035D428 + (ML20035D428)
- ML20035D431 + (ML20035D431)
- RC-93-0087, Forwards Scana 1992 Annual Rept & Sc Public Svc Authority 1992 Annual Financial Rept + (ML20035D432)
- ML20035D435 + (ML20035D435)
- ML20035D436 + (ML20035D436)
- ML20035D437 + (ML20035D437)
- ML20035D438 + (ML20035D438)
- ML20035D439 + (ML20035D439)
- ML20035D440 + (ML20035D440)
- 05000263/LER-1993-004-01, :on 930310,discovered Primary Containment Isolation.Caused by Blown Fuse.Fuse Replaced,Cabinet Inspected,Isolation Reset & Shutdown Cooling Returned to Svc + (ML20035D442)
- ELV-05383, Monthly Operating Repts for March 1993 for Vogtle Units 1 & 2 + (ML20035D444)
- ML20035D446 + (ML20035D446)
- ML20035D450 + (ML20035D450)
- 05000499/LER-1993-007-01, :on 930310,determined That Control Room Envelope HVAC Sys Was Not in Mode of Operation Required by TS 3.7.7a & 3.3.3.7b.Caused by Implementation & Use of Computer Program.Review Will Be Performed + (ML20035D452)
- 05000424/LER-1993-003, :on 930316,light 431D,indicating over-temp Delta Temp Turbine Runback Bistable,Lit.Caused by Inadequate Review of Affected Circuitry Prior to Removing Circuit Card.Technicians Counseled + (ML20035D454)
- ML20035D456 + (ML20035D456)
- ML20035D457 + (ML20035D457)
- ML20035D460 + (ML20035D460)
- HL-3239, Monthly Operating Repts for March 1993 for Ei Hatch Nuclear Plant,Units 1 & 2 + (ML20035D462)
- HL-3248, Advises That Through Wall Leak Identified in Reactor Pressure Vessel N11B Instrument Nozzle safe-end.Flaw Removed & Replacement Pipe & Fittings Installed.Proposes to Perform Listed post-repair Hydrostatic Tests + (ML20035D463)
- ML20035D470 + (ML20035D470)
- ML20035D472 + (ML20035D472)
- ML20035D475 + (ML20035D475)
- ML20035D476 + (ML20035D476)
- ML20035D477 + (ML20035D477)
- ML20035D479 + (ML20035D479)