Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20023B231 + (ML20023B231)
- ML20023B232 + (ML20023B232)
- ML20023B233 + (ML20023B233)
- W3P82-3999, Confirms 821215 Telcon Re Equipment Qualification Audit. Agreements & Commitments Documented + (ML20023B234)
- ML20023B236 + (ML20023B236)
- ML20023B237 + (ML20023B237)
- ML20023B238 + (ML20023B238)
- ML20023B239 + (ML20023B239)
- ML20023B240 + (ML20023B240)
- ML20023B243 + (ML20023B243)
- ML20023B244 + (ML20023B244)
- ML20023B245 + (ML20023B245)
- ML20023B246 + (ML20023B246)
- ML20023B247 + (ML20023B247)
- ML20023B248 + (ML20023B248)
- ML20023B250 + (ML20023B250)
- ML20023B251 + (ML20023B251)
- ML20023B256 + (ML20023B256)
- ML20023B258 + (ML20023B258)
- ML20023B259 + (ML20023B259)
- ML20023B261 + (ML20023B261)
- ML20023B262 + (ML20023B262)
- 05000373/LER-1982-151, Forwards LER 82-151/03L-0 + (ML20023B263)
- ML20023B264 + (ML20023B264)
- 05000373/LER-1982-151-03, /03L-0:on 821117,emergency Makeup Control Room Ventilation Fan B Failed to Start.Caused by Bent Outlet Damper Shaft to B Train & Broken Bearing Housing Cap. Linkage Misaligned When Installed Initially.Damper Repaired + (ML20023B265)
- ML20023B271 + (ML20023B271)
- ML20023B272 + (ML20023B272)
- ML20023B273 + (ML20023B273)
- ML20023B277 + (ML20023B277)
- ML20023B279 + (ML20023B279)
- 05000368/LER-1982-039, Forwards LER 82-039/03L-0 + (ML20023B280)
- ML20023B282 + (ML20023B282)
- ML20023B284 + (ML20023B284)
- ML20023B285 + (ML20023B285)
- ML20023B287 + (ML20023B287)
- 05000368/LER-1982-039-03, /03L-0:on 821112,degraded Fire Barrier Existed Due to Unsealed Piping Penetrations.Caused by Personnel Error Arising from Insufficient Instruction on Applicable Design Change Documentation.Penetrations Sealed + (ML20023B288)
- FVY-82-123, Forwards Final Mark I Containment Program:Plant Unique Analysis Rept of Torus Supression Chamber + (ML20023B292)
- ML20023B294 + (ML20023B294)
- CLI-82-38, Decision CLI-82-38,ruling That No Shutdown or Enforcement Action Required Re State of Emergency Planning.Fema Determined That Remedial Action Will Be Feasible.Problems W/ Local Govts Beyond Licensee Control + (ML20023B295)
- 05000255/LER-1982-044, Forwards LER 82-044/01T-0 + (ML20023B296)
- ML20023B299 + (ML20023B299)
- ML20023B300 + (ML20023B300)
- ML20023B301 + (ML20023B301)
- ML20023B302 + (ML20023B302)
- ML20023B304 + (ML20023B304)
- ML20023B305 + (ML20023B305)
- ML20023B307 + (ML20023B307)
- ML20023B308 + (ML20023B308)
- ML20023B309 + (ML20023B309)
- 05000255/LER-1982-044-01, /01T-0:on 821130,determined That Feed Breakers & Cables to MCC-1 & MCC-2 Might Overload Following Loca.Caused by Original Load Study Based on Incorrect Data.New Requirements to Shed Loads Instituted + (ML20023B311)
- ML20023B314 + (ML20023B314)