Verifies That Acceptance Criteria for Mod Providing Automatic Switchover of RCIC Sys Suction Has Been Satisfied Per NUREG-0737,Item II.K.3.22.Mod Completed on Both Units. Emergency Procedure Provided for Plant Operators
ML20023B258
Person / Time
Site: Peach Bottom  
Issue date: 12/20/1982
From: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Stolz J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.22, TASK-TM NUDOCS 8212270167
Download: ML20023B258 (2)


Text

____

PHILADELPHIA ELECTRIC COMPANY p

23ol M ARKET STREET P.O. BOX 8699 PHILADELPHI A. PA.19101 SHIELDS L. DA LTROFF ELECinIC PA CTION December 20, 1982 Docket Nos. 50-277 50-278 M r. J. F. S t<>1 z, Chi e f Operating Reactors Branch #4 Division of Licensing Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

NUREG-0737, Item II.K.3.22, Automatic Switchover of Reactor Corg Isolation Cooling System Suction.

Dear Mr. Stolz:

This letter responds to your letter dated August 4, 1982 i

(recalved November 22, 1982) requesting verification that the i

acceptance criteria delineated in the enclosure to the August 4, 1982 letter has been satisfied for the modification providing automatic switchover of the Reactor Core Isolation Cooling (RCIC)

System suction.

NUREG 0737, Item II.K.3.22, requires automatic switchover to the suppression pool when the condensate storage tank level is icw.

Considering the late arrival of your letter, the NRC Project Manager informed us that a response within 30 days of receipt of the lettar would be appropriate.

This modification has been completed on both Peach Bottom units, and according to our engineering evaluation meets the design criteria delineated in items 1 through 9 of the enclosure to the August 4, 1982 letter.

A plant emergency procedure, as requested in item 10 of the enclosure, provides the necessary guidance to the plant operators for maintaining the torus water level within the proper range.

Therefore, the new system is in compliance with the acceptance criteria identified in the enclosure to your letter.

8212270167 821220

" ~ ~

pq$

f"a _R ADDCK..

PD 05000277 Poa

6

/

Mr. J. F. Stolz, Chief Page 2

Shoult' you have any questions or require further information on this subject, please do not hesitate to contact us.

Sincerely,

)

/

+e y '

gy i cc:

R. A. Blough, Site Inspector Peach Bottom

'b

.. - _. -.. ~. -

, _... ~ -.. _ _ _.. _ _ _. -. - _ _ -,

,_.,,..,..-......_,n__,