Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20011D569 + (ML20011D569)
- ML20011D570 + (ML20011D570)
- ML20011D572 + (ML20011D572)
- ML20011D574 + (ML20011D574)
- ML20011D575 + (ML20011D575)
- ML20011D576 + (ML20011D576)
- ML20011D578 + (ML20011D578)
- ML20011D580 + (ML20011D580)
- IR 05000213/1989021 + (ML20011D582)
- ML20011D583 + (ML20011D583)
- ML20011D585 + (ML20011D585)
- ML20011D587 + (ML20011D587)
- ML20011D589 + (ML20011D589)
- ML20011D590 + (ML20011D590)
- ML20011D592 + (ML20011D592)
- IR 05000271/1989016 + (ML20011D594)
- PNO-III-89-086, on 891219,seal Leaks in in-core Instrumentation Thermocouples Identified.Seal Insp & Repairs Expected to Extend Refueling Outage by 8 Days Until 891231. State of Il Will Be Notified + (ML20011D595)
- PNO-I-89-101, on 891221,unit Automatically Scrammed When Second APRM Inadvertently Removed from Operate Mode, Causing Secondary Containment Isolation & Standby Gas Treatment Sys Initiation.Plant Currently in Cold Shutdown + (ML20011D596)
- ML20011D597 + (ML20011D597)
- IR 05000317/1989026 + (ML20011D599)
- ML20011D603 + (ML20011D603)
- ML20011D605 + (ML20011D605)
- IR 05000134/1989002 + (ML20011D606)
- ML20011D607 + (ML20011D607)
- 3F1289-16, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 176,adding Integrating Alarming Dosimeters as Alternative for Meeting Requirements for Entry Into High Radiation Area in Tech Specs + (ML20011D608)
- ML20011D609 + (ML20011D609)
- ML20011D610 + (ML20011D610)
- ML20011D611 + (ML20011D611)
- ML20011D612 + (ML20011D612)
- ML20011D615 + (ML20011D615)
- ML20011D616 + (ML20011D616)
- ML20011D617 + (ML20011D617)
- 3F1289-14, Confirms 891214 Conversation W/Util Re Extension of Response Time for EA-89-172 to 900126 + (ML20011D618)
- ML20011D619 + (ML20011D619)
- 05000458/LER-1989-040, :on 891117,surveillance Test of Div II Penetration Valve Leakage Control Sys Air Supply Header Pressure Not Performed within Allowable Tolerance.Addl Training of Scheduling Group Will Be Provided + (ML20011D620)
- 05000255/LER-1989-025, :on 891121,PORVs Simultaneously Opened, Following Manual Opening of motor-operated Block Valve & Causing Reactor Trip & Safety Injection Actuation Signal. Caused by Rapid Repressurization of PORV + (ML20011D624)
- ML20011D625 + (ML20011D625)
- ML20011D628 + (ML20011D628)
- ML20011D632 + (ML20011D632)
- ML20011D633 + (ML20011D633)
- ML20011D634 + (ML20011D634)
- ML20011D636 + (ML20011D636)
- ML20011D637 + (ML20011D637)
- ML20011D638 + (ML20011D638)
- 0CAN128914, Responds to Violations Noted in Insp Repts 50-313/89-32 & 50-368/89-32.Corrective Actions:Storage Bins Will Be Installed in Hot Mechanics Shop to Segregate Items to Be Reused from Radwaste to Better Control Tagged Equipment + (ML20011D640)
- ML20011D641 + (ML20011D641)
- ML20011D642 + (ML20011D642)
- ML20011D644 + (ML20011D644)
- ML20011D646 + (ML20011D646)
- ML20011D649 + (ML20011D649)
- ML20011D650 + (ML20011D650)