Rev 5 to Operational QA Program
ML20011D634
Person / Time
Site: Maine Yankee
Issue date: 08/31/1989
From: Frothingham J
Maine Yankee
To:
Shared Package
ML20011D629 List:
References
2515Q, NUDOCS 8912280133
Download: ML20011D634 (79)


Text

i

~

~

i l

l MAINE YANKEE ATOMIC POWER COMPANY OPERATIONAL QUALITY ASiiURANCE PfhXiRAM i

e Revision 5 i

l l

l 1

i.

8912280133 891215 PDR ADOCK 05000309 P

PDC 2515Q

TABLI. OF CONTENTS Approval Sheet Policy Statement I.

Organization II.

@ Program l

III.

Design Control l

l IV.

Procurement Document. Control V.

Instructions Procedures and Drawings j

VI.

Document Control

\\

l VII.

Control of' Purchased Material, Equipment and Services VIII.

Identification and Control of Material, Parts and Components i

J' IX.

Control of.Special Processes l

X.

Inspection l

XI.

Test Control

-XII.

Control of Measuring and Test Equipment j

XIII.

Handling, Storage and Shipping 4

l XIV.

In'spection, Test and Operating Status

, XV.

Nonconforming Materials, Parts and Componen,ts '

XVI.

Corrective Action XVII.

Quality Assurance Records XVIII.

Audits Appendix A Qualification Requirements Appendix B Maine Yarkee Responsibilities Appendix C Maine Yankee Classifications e

t 2515Q

.--wi.-----%

w m

a.

-~.

I Rev. No.:

5 Date:

08/31/89 l

l i

MAINE YANKEE ATOMIC POWER COMPANY r

OPERATIONAL QUALITY ASSURANCE PROGRAM l

sA f)

PREPARED BY:

C/ AE n' E_

l V

. C. Frotfitngham,'Manag3 Quartty Programs Maine Yankee Atomrt: Power Company

[

t

[

REVIEWED BY:

-s

[

R.M. BlacTmo're,' Plant Kanager

[

Maine Yankee Atomic Power Company REVIEWED BY:

[

Ub

[

E. T. Boulette, Vice President Operations l

Maine Yankee Atomic Power Company REVIEWED BY:

OwAN fofl7!64 J. H. Garrity, V%e Presitent Licensing and Engineering Maine Yankee Atomic Power Company REVIEWED BY:

/6 1/ 9 P. S.~Lydon,t ice President Fifiante & Administration Maine' nkee Atomic Powef Company f

(

REVIEWED BY:

3D M

i #3 Mi U

[

J. D. Mtttt; Nice President, Public Ik Governmental

[

Affairs

(

Maine Yankee Atomic Power Company N// r e APPROVED SY:

C.C. Frizzle,'P~ esident r

Maine Yankee Atomic Power Company 25150 i

~ _,_ --,

POLICY STATEMENT Operational Quality Assurance Program The Mains Yankee Atomic Power Company Operational Quality Assurance Program j

shall comply with the requirements of the Code of Federal Regulations Title 10 Part 50 Appendix 8, with respect to the operation, maintenance of, and changes to, the nuclear generating facility.

The Company policy of a firm commitment to quality is best reflected in a memorandum to all employees from its President and incorporated into this program as Attachment 1.

4 l

4

]

1 l

l i

1 i

1 251EQ

i i

ATTACHMENT 1

)

i August 17, 1989 Revised TO: ALL PERSONNEL i

FROM:

Charles D. Frizzle, President j

THE OUALITY MISSION The designers, builders, owners and employees of Maine Yankee Atomic Power Company have been committed to high standards of engineering and operational quality from the beginning. During the ensuing years we have installed substantial plant modifications, conducted special operational performance tests and dramatically expanded personnel training programs and staffing to insure continued improvements in plant reliability and safety.

Today Maine Yankee is recognized by regulators and public alike as a leader in the industry with 17 years of superior performance and proven dedication to the principles of continuous quality inprovement.

Uncompromising dedication to continuous quality improvement must continue and be vigorously pursued by every member of our organization if we are to maintain the public confidence that is necessary for continued success. Among other things, uncompromising dedication to i

quality improvement requires:

Not only full understanding and compliance with requirements but

t. willingness to continually question, upgrade and improve the requirements.

Thorough understanding of-our job functions and an understanding of why each job is important.

s Producing, expecting and accepting nothing but the highest standards of performance. Making sure that the right things are done correctly the first time.

Identification, repair or reporting of any equipment, process or material in the plant that is nonconforming, deficient or otherwise not up to an acceptably high level.of performance.

f i

L

O

-2 The Operational Quality Assurance Program (00AP) is the basis for the processes and controls we need to achieve a high level of quality and safety in plant operation. Achievement and verification of quality are line management functions which are prescribed by the OQAP and its implementing procedures.

The 00AP has provided for the Quality Programs Department to be the principle coordinator and consultant for quality i

verification activities.

I challenge every employee to actively cooperate and support our fundamental quality objectives of continuous improvement, safe operation and high public confidence. You are the key to successful pursuit of excellence in all Maine Yankee activities.

i Y/

I President i

l l

4 4

4 4

4

Title:

Section I.

Organiaation Page:

1 of 2 Rev. No.:

5 i

i Date: 08/31/89 I.

ORGANIZATION A.

SCOPE This section describes the functions and relationship of personnel responsible for establishing and implementing the Operational Quality Assurance Program.

B.

RESPONSIBILITY

[

Maine Yankee Atomic Power Company management is responsible for the safe operation of its nuclear power plant.

This Operational Quality Assurance Program is adopted to ensure that Company activities related to safety are in full compliance with regulatory requirements, meet all appilcable Industry standards,.and are consistent with good engincaring and management practices.

i The Quality. Programs Department Manager assures that the Program is

[

implemented effectively. Quality Programs Department personnel have C

authority for access to all records necessary to fulfill their

[

responsib111tles.

[

The President is the corporate officer with general responsibility for all aspects of operational quality. Specific areas of responsibility are delegated to other personnel and organizations as

[

indicated throughout the program and in Appendix B.

Maine Yankee 1

[

management retains full responsibility for the effectiveness of C

the overall program.

l l

C.

ORGANIkATIONALRELATIONSHIPS Maine Yankee Atomic Power Company lines of authority of personnel Involved in the implementation of the Operational Quality Assurance Program are indicated in Section 5 of the Technical Specifications.

y i

The Nuclear Services Division of Yankee (YNSD) has a continuing contractual obligation to provide services to the Maine Yankee Atomic Power Company. The two companies interlock at the executive level to provide additional assurance that YNSD provides the services assigned. A corporate officer of the Yankee Atomic Electric Company is also a Vice President of the Maine Yankee Atomic Power Company.

This haine Yankee Vice President is referred to hereafter as the Vice President, YNSD.

i i

e i

25150

~~

^ ~ ~ 7

Title:

Section I.

Organization

)

Page:

2 of 2 i

Rev. No.: T~

Date: 08/31/89 O.

REVIEWANDAUDITCDPMITTEES As required by the Technical Specifications, two committees have been established to insure that the plant is operated in accordance with regulatory requirements and the standards established by this i

Progran.

1.

Plant Operations Review Committee l

This Committee is composed of exp'erienced and qualified plant-personnel having direct line responsibility for plant operation.

See Section 5.5, " Review and Audit" of Technical i

Specifications.

4 2.

Nuclear Safety Audit and Review Committee i

This Committee is composed of experienced and qualified personnel not having Itne responsibility for plant operation.

i See Section 5.5, " Review and Audit" of Technical Specifications.

4 i

l 1

i l

t 9

4 b

e G

8 i

2515Q r-y e

e

.--y-

  1. ow e, y- -.. - -,

-pg-

+-e

Title:

Section II. 0A Program

)

Page:

1 of 15 Rev. No.: $

Date: 08/31/89 II. OPERATIONAL QUALITY ASSURANCE PROGRAM A.

SCOPE

[

The Operational Quality Assurance Program applies to activities affecting the quality of the identified structures, systems and.

[

components classified and designated by the Manager, Plant

[

Engineering and which are necessary to ensure the integrity of

[

the Reactor Coolant Pressure Boundary, or the capability to shutdown C

the reactor and maintain a safe shutdown condition or the C

capability to prevent or mitigate the consequences of an accident.

[

Manager, Plant Engineering is responsible for establishing and

[

maintaining documentation which designates the safety classification

[

of plant systems.

The program takes into account the need for special controls, processes, environmental conditions, equipment, tools and skills to attain the required quality and the need for verification of quality by inspections, evaluations or tests.

B.

RESPONSIBILITIES Compliance with the requirements of the Operational Quality Assurance Program is the responsibility of all personnel involved-l with activities affecting operational safety.

Individuals responsitsle for establishing and executing the Operational Quality Assurance Program are delineated in Section I, " Organization", and Appendix 8 of this Program. The Quality Programs Department shall i

regularly review the status and adequacy of the Operational Quality Assurance Program.

C.

IMPLEMENTATION The Op'erational Quality Assurance Program is established as required by, and to assure conformance with, Title 10 of the. Code of Federal Regulations, Part 50, Appendix B, Quality Assurance Criteria for Nuclear Power Plants.

Establishment of an effective Operational Quality Assurance Program is assured through conformance with ANSI Standards and the regulatory. position of regulatory guides as specified in Paragraph F, of this section of the QA Program.

Implementation of this Program is assured through procedures derived from those standards and guides.

NOTES:

1) The plant Technical Specifications shall be the governing document when determining requirements to be imposed in all areas which are addressed in both technical specifications and the specified standards and.

guides.

l 25150

_ _ _ _ _ _ _ _. _.. _ _ _ _ _ _ _ _ _ _Section II.

0A Program- ~

~'~

~

l

Title:

L Page:', of 15 Rev. No.:

5 Date: 08/31/89 L

L 2)

Revisions-to the specified standards and guides will be I.

considered for applicability to the Maine Yankee.

l Operational Quality Assurance Program upon written l

direction thereof by the Nuclear Regulatory Commission -

Regional Office.

L

3) ANSI Standard N18.7-1976 is the endorsing document for-all other specified ANSI Standards. All such endorsed 3

ANSI Standards will be implemented to the degree of applicability indicated in ANSI N18.7-1976.

4) Changes to the Operational Quality Assurance Program I

I shall be handled as follows:

I a)

This program shall be applicable to those activities requiring quality assurance which occur commencing 90_ days after acceptance of the program by the 4

l Nuclear Regulatory Commission.

l b) Changes that reduce' commitments in the accepted description of the QA Program, shall be submitted-for NRC review and acceptance prior to implementation. Acceptance will be assumed 60 days after submittal unless notified otherwise.

c) Changes that do not reduce QA Program commitments shall be submitted to the NRC at least annually.

d)

Editorial changes.or personnel reassignments of a~

minor nature do not require NRC notification.

D.

MANAGEMENT EVALUATION The Nuclear Safety Audit and Review Committee, under the direction of the Vice President, YNSD, conducts evaluations of the Quality

-[

Assurance Program for compliance and effectiveness.

The Vice;

[

President, YNSD shall bring unresolved issues to the attention'of C

the Maine Yankee President.

E.

TRAINING 1.

The indoctrination and training programs shall provide the following quality assurance related activities:

Instruction as to the purpose. scope, and implementation-of a.

quality assurance manuals, instructions, and procedures.

l 25_15Q l~

=

Page: 3 of 15

)

Rev.-No.:- 5 Date: 08/31/89 i

i b.

Training and qualification in the principles and techniques of the activity being performed.

Maintenance of proficiency by retraining, reexamining, c.

and/or recertifying personnel.

d.

Documentation of the training sessions including content, attendance, dates and results where applicable.-

F.

ANSI STANDARDS AND REGUI.ATORY GUIDES The Operational Quality Assurance Program is written to conform to-the ANSI standards and regulatory guides listed below, as modified herein.

1.

ANSI N18.1 - 1971 Selection and Training of Nuclear Power Plant

. Personnel, as modified by Regulatory Guide 1.8, Revision 1.

l a.

EXCEPTION:

Maine Yankee takes exception to the provisions of Paragraph 4.5.2 which requires technicians in responsible positions to have a minimum of two years of working,

experience in their specialty.

ALTERNATIVE:

Maine Yankee will adhere to Section 5.3.1.c of Technical Specifications.

2.

ANSI N18.7 - 1976, Administrative Controls and Ouality Assurance; for the Ocerational Phase of Nuclear-Power Plants, as: modified by ' Regulatory Guide 1.33, Revision-2, and the following exceptions.

l a.

EXCEPTION:

The following exception is taken by Maine Yankee.

l ANSI standards not referenced in ANSI N18.7-1976, but which-are referenced-in an ANSI standard endorsed by N18.7-1976 shall not be considered as applicable to the Maine Yankee q

Operational Quality Assurance Program.

L' l

515Q 2

(

L l~

~

~'-~'~~ ~ ~~~~ ~ ~~ - ~"~ ~ ^7 T151e 7 h ton If. ~0A'Proaram ~

~

~

~

5e Page:

4 of 15 4

Rev. No.:

5-2 4

Date: 08/31/89 i

ALTERNATIVE:

\\

Maine Yankee may use the noted standards as_ guides, as necessary.

L b.

EXCEPTION:

Maine Yankee takes exception to Section 4.3." Independent Review Program" and Section 4.4 " Review Activities of the L

Onsite Operating Organization".

l ALTERNATIVE:

l Section 4.3 refers to requirements for the Nuclear Safety' and Audit Review Committee (NSARC). - Technical Specification 5.5.8 establishes appropriate requirements for independent ~

l review for NSARC.

i-Section 4.4 refers to requirements for the Plant' Operations Review Committee (PORC).

Technical Specification 5.5.A establishes appropriate requirements for review activities of the onsite opera, ting organization.

I i

f' c.

EXCEPTION:

l Maine Yankee takes exception to the provision of paragraph 5.2.2, which requires that one of the two individuals l-providing approval of temporary (procedure) changes "...

shall be the supervisor in charge of the shift."

ALTERNATIVE:

'. Maine Yankee will adhere to Section 5.8.3 of the Plant

Technical Specifications.

d.

EXCEPTION:

Maine Yankee takes exception to the application of-paragraph 5.2.16, as applied to control of measuring and test equipment for radiological controls equipment.

Paragraph 5.2.16 requires that an evaluation be made and documented

-concerning the validity of previous tests from the time of tho'last calibration when the device is found out of

~

calibration.

ALTERNATIVE:

It is impractical to log everywhere that a survey instrument is used.

Personnel carry a pocket dosimeter and TLD for monitoring radiation levels.

3 25150

,,,,----.,----,-n-,n

--as,,,---e,-,

u v.-r-4

Title:

Section II.

0A Program Page:

5 of 15 Rev. No.:

5

'l Date:

08/31/89

?

e.

EXCEPTION:

Maine Yankee takes exception to_ application of paragraph.

'f

~

e 5.3.9.1, Emergency Procedure Format and Content.

i ALTERNATIVE:

1 NRC Order dated July 10, 1981 confirmed Maine Yankee's-commitment concerning NUREG 0737, supplement IC1-for TMI; related items. Maine Yankee's Emergency Operating Procedures (EOP) will be written to the requirements of the E0P Nriter's Guide, based on NUREG 0899,- submitted-to the NRC for-review on March 18, 1986.

3.

ANSI'N18.17 - 1973, Industrial Security for Nuclear Power Plants.,

a.

EXCEPTION:

Maine Yankee takes exception to the application of ANSI N18.17 for Security.

l ALTERNATIVE:

f 10CFR73 requires that Security Plans be established and l

approved by the NRC. This provides adequate assurance that an acceptable Security Plan is established and implemented that meets or exceeds ANSI N18.17 requirements.

4.

ANSI N45.2.1 - 1973, Cleaning of Fluid Systems and Associated Oyasonants Durino Construction Phase of Nuclear Power Plants, as mod fled by Regulatory. Guide 1.37, March.16,1973.-

O e

"h o

O e

e 2515Q

Title:

Section II.

O W ooram

~ ~ ~ ~ ~ ~ ~ ~ ~

H Page:

6 of 15 Rev. No.:

5 Date:

08/31/89 5.

ANSI M45.2.2 - 1972, Packacina. Ship >inc. Receivino. Storage &

Handling of Items for Nuclear Power 11 ants (During the Construction Phase), as modified by Regulatory Guide 1.38, Revision 2, and the following exceptions.

a.

EXCEPTION:

Subsection 3.7.1 & A3.7.1 -' Containers Maine Yankee takes exception to the-specific requirements for containers, ALTERNATIVE:

j Containers shall be of suitable construction to assure material is' received undamaged.

i-JUSTIFICATION:

Containers shipped by closed carrier, stored inside and not subjected to a wet environment do not require weather i

resistant fiberboard. Therefore, this is an unnecessary expense. Additionally, numerous vendors utilize shipping l '

containers that do not comply with the specific requirements i

of this section, i.e., flaps overlap.

The acceptance-i criteria for a shipping container should be established l

l based on the capability of the container to maintain the component / material in a safe condition.

Technology has advanced beyond the standard.

b.

EXCEPTION:

Subsection 3.7.2 - Crates and Skids Maine Yankee takes exception to the requirement that skids and runners shall be used on-boxes-with a gross weight of 100 pounds or more.' -

ALTERNATIVE:

Skids or runners shall be used on boxes with a gross weight of.100 pounds or more if practical.

JUSTIFICATION:

Storage methods and container design frequently are such j

that runners or skids are not feasible.

i e

4 2515Q

T1 tie: 'Section'II. 0A ProcraR Page: 7 of 15 Rev. No.:

5 0

Date: 08/31/89 1

q c.

EXCEPTION:

Subsection 5.2.1 - Shinoing Damaae Inspection j_

Maine Yankee takes exception to the requirement that a preliminary visual inspection or examination be performed prior to unloading.

ALTERNATIVE:-

Maine Yankee shall perform those required inspec'tions after unloading.

In special instances, pre-unloading inspections shall be~ performed.

JUSTIFICATION:

Post unloading inspection is adequate.to determine any damage that may.have been incurred during shipping'and handling.

d.

EXCEPTION:

Subsection 5.2.2 - Item Inspection Maine Yankee takes exception to the. requirement,.that "The inspections shall be performed in an area equivalent to the level of storage requirements for the ites."

ALTERNATIVE:

Maine Yankee shall perform receiving inspection in a manner and in an environment which does not. endanger the requisite quality of the item; however, receiving area environmental controls may be less stringent than storage environmental controls for that ites.

When inspections are performed in i

receiving areas with environmental. controls less stringent than storage area environmental controls, a time limit shall be established on a case basis for retention of items in the receiving area.

Retention' time shall be such that deterioration is prevented and: applicable manufacturer recommendations are addressed.

JtfSTIFICATION:

t Receipt inspection activities are for a much shorter duration and therefore should not be subjected to the same-stringent requirements as required for storage.

2515Q

~ _ _ _

2

Title:

Section II. 0A Program Page: ' 8 of 15

. i Rev. No.:

5 l

Date:

08/31/89 e.

EXCEPTION:-

Subsection 5.2.3 - Special Inspection Maine Yankee takes exception to attaching special inspection l

l procedures to the item or container.

I ALTERNATIVE:

Special inspection-procedures shall be readily available to personnel performing inspections.

f JUSTIFICATION.

l Procedures are subject to less abuse and more stringent controls when maintained on file and not attached to the l

Inspection status is maintained by tagging and item.

procedure control.

l I

f.

EXCEPTION L

Subsection 6.1.2 - Levels of Storace l

Maine Yankee takes exception to two specific' requirements associated'with fuel storage (classified level A).

ALTERNATIVE:

Maine Yankee shall meet the requirements of level A storage L

fpr new fuel with the exception of special air filtering;

.and temperature and humidity controls.

1

, JUSTIFICATION:

E The existing storage conditions at the Maine. Yankee plant is consistent with the protection provided to the fuel while in-storage at the manufacturer (vendor) and'while in. transit to the plant site and are: judged to provide adequate protection:

i to-the. fuel assembly structure which is lof highly corrosion resistant materials. He believe that the'above listed requirements are intended for application at the manufacturing facility-(vendor) where the uranium pellets may be exposed to the atmosphere and not in its fully encapsulated, and therefore, fully protected form in a j

completed fuel assembly.

4 4

- 2515Q

...c

._.-,_s

Page: 9 of 15 Rev. No.: 5 Date: 08/31/89 g.

EXCEPTION:

Appendix A-3 Subsection A3.5.1(1) - Caos & Plugs Maine Yankee takes exception to the requirement that~

i non-metallic plugs and caps shall be brightly colored.

ALTERNATIVE:

Non-metallic plugs and caps shall be of a contrasting color.

JUSTIFICATION:

The purpose of utilizing brightly colored plugs and caps is to assist in assuring obstructions are not inadvertently placed in operating components or systems.

By using plugs and caps of a contrasting color.this objective can be achieved.

h.

EXCEPTION:

opendix A-3 Subsection ~A3.9(1) - Second Groun. Markinos Maine Yankee takes exception to the requirement _that container. markings shall appear on a 'inimum of two sides.

m L

l ALTERNATIVE:

l Containers shall be adequately marked to provide identification and retrievability.-

JUSTIFICATION:

', Containers are tagged to provide ident1fication and

~

inspection status.

Employment of two' tags on small containers adds bulk and. confusion and does not provide for.

better identification or traceability.

1.

EXCEPTION:

Appendix A-3. Subsection A.3.9(4) - Second Group. Marking Maine Yankee t.akes exception to the requirement that container markings shall be no less than 3/4" high container permitting.

ALTERNATIVE:

Container markings shall be of a size which permits easy-l recognition.

l 2515Q y

,-..,.-,-.-,4-w

Title:

Section II.

0A Program

~

'~ '

' ?

i Page:

10 of 15 J

Rev. No.:

5-Date:. 08/31/89 t

JUSTIFICATION:

Markings were intended to provide identification and instructions.

The criteria should be that the markings clearly provide the same.

l j.

EXCEPTION:

Accendix A-3 Subsection A.3.9(6) - Second Group. Marking Maine Yankee: takes exception to the information required for

[

1 i

container marking..

j ALTERNATIVE:

Marking shall be adequate in each case to provide identification, traceability-and instructions for special handling, as appilcable.

' JUSTIFICATION:

l M

The information required is excessive.- Cluttering a container with excessive markings only reduces the main objectives, maintaining identification.and establishing special controls.

I 6.

ANSI N45.2.2 - 1973 Housekeepino During the Construction Phase of Nuclear

wer Plants, as modified by Regulatory Guide,1.39.

Revision 2, Ltd the following exceptions.

a.

EXCEPTION:

'. Subsection 2.1 - Planning l

Maine Yankee takes exception to the five-zone requirements specified in the subject standard.

ALTERNATIVE:

s Maine Yankee shall. establish as a minimum a three-zone p:ogram as follows:

Zone III Zone III criteria'shall be applied to major portions of,the reactor coolant system which are opened for inspection, maintenance or repair.

1) Access control over personnel shall be required.

I l:

25150'

t

-..-Z

..g

Title:

Section II. 0A Program Page:

11 of 15 Rev. No.: $

Date: 08/31/9 l

2) Cleanliness shall be maintained, commensurate with the I

work being performed, so as to preclude the entry of foreign material to-the Reactor Coolant System.

3) A documented cleanliness inspection shall be performed j

immediately prior to closure.

NOTE: The Zone III requirements may be expanded for i

certain maintenance / repair activities if deemed appropriate by plant management.

In such instances appilcable sections of Zones I & II may-be specified.

Zone IV Zone IV criteria shall be applied to the radiation control-areas of the plant, i

1) Standard janitorial and work practices shall be utilized to maintain a. level of cleanliness commensurate with company polley in the areas of Housekeeping, Plant and l

Personnel Safety and Fire Protection.

2) Additional housekeeping requirements shall be Implemented as required for the control of radioactive contamination.

l l

3) Smoking and eating shall be controlled consistent with good health physics practices and to maintain cleanliness.

Zone V Zone V criteria shall be-applied to.the remainder of the plant.

1) Standard janitorial'and work practices shall be utilized to maintain a level of cleanliness commensurate with company policy in the areas of Housekeeping, Plant and Personnel Safety and Fire Protection.

I b.

EXCEPTION:

t Subsection 2.4 - Personnel Qualifications Maine Yankee takes exception to the word "all" in the subject paragraph.

2515Q

Page:

1A of 15

'l Rev. No.:

5 Date:.08/31/89

]

J ALTERNATIVE:

r Personnel, with unescorted access, working in zone controlled

- areas shall be familiar with housekeeping requirements for the various zones.

l Personnel working in zoned :ontrolled areas with' escorted access will be escorted by a person with unescorted access who is familiar with the requirements.

c.

EXCEPTION:

Subsection 3.2 - Control of Facilities

,)

Maine Yankee takes exception to the~ control of tools, t

equipment, materials and supplies used in Zone III.

ALTERNATIVE:

Maine Yankee shall verify control for Zone III as indicated l

in the previous exception.

7.

ANSI ~N45.2.4 - 1972, Insta11ation. Inspection, and Testing.

Recuirements for Instrumentation and Electric Eauipment During the Construction of Nuclear Power Genera 11no Stations, as-modified by Safety Guide 30, August l', ' 972. -

8.

ANSI N45.2.5 - 1974, Supolementary Ouality Assurance Recuirements for Installation. Inspection, and Testino of Structural Concrete and Structural Steel Durino t1e Construction Phase of Nuclear Power Plants, as modified by Regulatory Guide-1.94, Revision 1.

~

9.

ANSI N45.2.6 - 1978, Qualifications'of Inspection. Examination.

and Testina Personnel for Nuclear Power Plants, as modified by Regulatory Guide 1.58, Revision 1, and the following exception.

a.

EXCEPTION:-

Maine Yankee takes exception.to the application of the

-Standard to all Maine Yankee personnel performing inspection, examination and testing.

ALTERNATIVE:

-Maine Yankee personnel identifled in ANSI N18.1-1971 who perform inspection, examination and testing will be qualified to ANSI N18.1-1971.

k e

2515Q

Title:

Section fl.

0A Program j

i Page:- 13 of 15 Rev. No.:

5

+

Date:

08/31/89 Maine Yankee personnel not identified in ANSI N18.1-1971 who

-perform inspection, examination and testing will be-qualified to ANSI N45.2.6.-1978.

I

' Contractor personnel who perform inspection, examination and testing at Maine Yankee will be quallfled to ANSI i

N45.2.6-?978.

i

10. ANSI M45.2.8 - 1975, Sucolementary Ovality Assurance 4

Recuirements for Installation. Inspection and Testino of

  • Mechanical Ecutoment and Systems for Cons 1ruction Phase of Nuclear-Power Plants, as modified by Regu'atory Guide.l.Il6, Revision OR, t
11. ANSI N45.2.9 - 1974, Requirements for Collection. Storace an'd Maintenance of Quality Assurance Records for Nuclear Power 4

Plants, as modified by Regulatory Guide,1.88, Revision 2.

4

12. ANSI N45.2.10 - 1973, Quality-Assurance Terms'and Definitions, e

as modified by Regulatory Guide 1.74. February 1974, and the following exception.

a.

EXCEPTION:

4 Subsection 2 - Terms and Definitions Maine Yankee takes exception to the definitions of

" Certificate of Conformance" and " Certificate of Compliance".

ALTERNATIVE:

Maine Yankee shall reverse the definitions of the above terms so our Program will be in compliance with the implied definitions in the ASME B&PV Code and Maine Yankee specifications.

13. ANSI N45.2.11 1974, Quality Assurance Reautrements for the Desion of Nuclear Power Plants, as modified by Regulatory Guide

-1.64, Revision 2.

14. ANSI N45.2.12 - 1977, Reautrements for Auditino of Ouality Assuravice Programs for Nuclear Power Plants, as modified by-Regulatory Guide 1.144, January 1979, and the following exceptions.

a.

EXCEPTION:

Subsection 4.2.2 Team Selection l

Maine Yankee takes exception to the requirement that a " Lea 11 Auditor" be appointed as team leader.

l 251.10 m

m

,...--.,-r,-e-,

__ _ _____ W ooram

~~~ ~ ~~' ~ ~~ )

CA Section II.

Title:

Page:' 14 of 15 Rev No.:

5 Date:. 08/31/89 ALTERNATIVE:

q 1

Team Selection l

Audits will be performed under the cognizance of,a lead auditor.

b.

EXCEPTION:

4 4

Subsection 3.5.3 i

Maine Yankee takes exception to the requirement for y

supplemental audits.

ALTERNATIVE:

Maine Yankee Internal Audits are performed on a calendar l

year frequency and preclude the need for supplemental.

l audits.

Supplemental Audits will be initiated by the Manager, Quality Programs as deemed necessary for significant changes in the QA Program or procedures.

c.

EXCEPTION:

Subsection 4.5.1 Maine Yankee takes exception to the thirty day requirement for corrective action.

ALTERNATIVE:

i Maine Yankee will specify corrective actions and provide' management approval within thirty working days.

Corrective

' action completion dates will be as specified-in-the audit i

document'ation approved by management.

l

15. ANSI N45.2.13 - 1976, Quality Assurance Reauirements for the Control of Procurement of Items and Services for Nuclear Power 4

Plants, as modified.by Regulatory Guide.l.123, Revision 1.

D f

16. ANSI N45.2.23 - 1978, Qualification of Qua'11ty Assurance-Program j

Audit Personnel for Nuclear Power Plants,.as modified by i

L Regulatory Guide 1.146, August 1980.

-l lo

17. ANSI N101.4 - 1972, Quality Assurance for Protective Coatinos Applied to Nuclear Factitties, as modified by Regulatory Guide 1.54, June 1973.

I i

2515Q j

liti~ei.Seedon'II. ~ OA Proaral

~~

j Page:

15 of 15 Rev. No.:

5 Date: 08/31/89 1

18. ANSI N323 - 1978, Radiation Protection Instrumentation lest and Calibration.-

a.

EXCEPTION:

Subsection 6.1 Maine Yankee takes exception to the requirement that for photon and neutron monitoring instrument calibrations, the source-to-detector distance shall be seven times the maximum dimension of the source or detector, whichever 1s-targer, or l

suitable corrections shall be used.

l ALTERNATIVE:

Maine Yankee will' comply with the monitoring equipment 1

manufacturer's technical manual recommendations for l

, calibration using a pulse generator.

19. Regulatory Guide 1.26. Revision 3, Quality Group Classifications and Standards for Water. Steam anc! Radioactive - Naste -

Conta' ning Components of Nuclear Fower Plants.

a'.

EXCEPTION:

Maine Yankee takes exception to the Guide in its-entirety.

ALTERNATIVE:

I Maine Yankee shall continue to classify structures, components and systems in accordance with. ANSI Standard N18.2, " Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants" as in the past.

20. Regulatory Guide 1.29, Revision 3, Seismic Desian Classification, a.

EXCEPTION:

Maine Yankee takes exception to the appilcation*of Reg.

Guide 1.29, Rev. 3, (9/78).

ALTERNATIVE:

Maine Yankee shall apply Reg. Guide'1.29, Rev. 3'(9/78) to those structures, systems and components as defined in the Maine Yankee FSAR Section 2.5.

i O

2515Q

Title:

Section XII.

Desion Control Page:

1 of 3 Rev. No.:

5 Date: 08/31/89 III.

DESIGN CONTROL ~

A.

SCOPE i

i This section establishes measures to assure that the design of and changis to structures, systems, and components covered by the j

Operational Quality Assurance Program are controlled.

B.

RESPONSIBILITIES 1.

The Quality Programs Department sha'11 be responsible for:

1 a.

Evaluation and/or audit of the design control system.

b.

Review of design sketches and specifications to assure that the documents are prepared, checked and reviewed in accordance with~ procedures and that the documents contain the necessary quality assurance requirements including:

1)

Inspection and test requirements

2) Acceptance requirements
3) The extent of documenting inspection and test results 2.

The Plant Engineering Department shall be responsible for:

i a.

The control of design activities for changes to structures, systems, or components, b.

Preparation, review and approval of design documents including the correct translation of applicable regulatory requirements and design bases into specifications, drawings and written documents.

c.

Application of suitable design controls to such activities as: field design engineering; physics; seismic, stress, thermal, hydraulic, radiation, and accident analyses; compatibility of materials; accessibility for inservice inspection, maintenance and repair; and quality standards.

d.

Identification, documentation, and control of deviations from specified design requirements and/or quality standards, 6elineation of acceptance criteria for inspections and tests.

e.

f.

Design reviews to assure that design characteristics can be controlled, inspected and tested.

2515Q

Title:

Sec91on III.

Desvan Contr1R Page: 2 of 3 Rev. No.:

5 Date: 08/31/89 Proper selection and performance of design verification g.

processes such as design reviews, alternate calculations, qualification testing or test programs. -If the verification criteria method is only by test, procedures shall provide:

L that specify when verification should be by test; that L

prototype, component or feature testing is performed as-l early as possible prior to installation of. plant equipment, or-prior to the point when installation would become irreversible; and verification by test is performed under conditions that simulate the most adverse design conditions.

h.

Subjection of design and specification changes to the same design controls and approvals that were applicable to the original design unless designated in writing to another.

responsible organization. Minor changes may be performed without original design controls using approved procedures which provide appropriate alternate controls.

+

1.

Selection of suitable materials, parts, equipment, and processes for safety classified structures, systems, and-components,

j. Control of fire Protection in accordance with YNSD YA-GEN-9.

k.

Notification to responsible personnel.that a design change may affect performance of their duties.

1.

Maintenance of records which correctly identify the as-built condition of the facility for the life of the item while Installed..

m.' Establishing design control program procedures which prescribe:

1) Implementation of the. provisions delineated above.
2) Organizational responsibilities for preparing, reviewing, verifying and approving design documents such as system descriptions, design input and criteria, design drawings / sketches, design analyses, specifications, and procedures / instructions.

3)

Identification of internal and external design interface

. controls including lines of communication among participating design organizations and across technical disciplines for the review, approval, release, distribution and revision of design' documents, i

a

-2515Q

,.--w

.4 m

Page:

3 of 3 Rev. No.:- 5 j

-Date:

08/31/89

4) Provisions to satisfy' Regulatory Guide 1.64, Rev. 2 (ANSI Standard N45.2.11 - 1974).

3.

The Fire Protection Coordinator YNSD shall be responsible for review of proposed design changes of fire protection systems-in accordance with the Yankee Nuc1, ear Services Division General j

- Specifications YA-GEN-9.

1 I

i 4.

The Plant Manager shall be responsible for:

- 4.

Evaluation of'the recommendations of.the. Plant Operations i

Review Committee.

l-l b.

Review and approval of proposed design changes.

5.

The Yankee Nuclear Services Division _ shall be responsible for:

Establishing and implementing a system for processing design a.

changes.

b.

Independent design verification of proposed design changes to assure the adequacy of design.

I l

l i

I l

l

\\

t L

6 25150


.,,-r.-..

=

Title:

.Section IV. Procurement Document i

Control Page:

1 of 2 Rev. No.:

5 Date:

08/31/89 IV. PROCUREMENT DOCUMENT CONTROL A.

SCOPE This section establishes measures to assure that applicable requirements necessary to assure adequate quality are included or referenced in procurement documents for material, equipment and services.

/

B.

RESPONSIBILITIES 1.

The Quality Programs Department shall be responsible for:

a.

Evaluation and/or audit of procurement document control, 1

including the preparation, review, and approval of purchase requests for material, equipment, and services covered by the Operational Quality Assurance Program.

[

b.

Review and specify Quality requirements for material.

[

equipment and service purchases.-

c.

Review of safety classified purchase specifications for inclusion of proper inspection requirements and acceptance criteria.

2.

The Materials Management Section shall be responsible for:

a.

Processing and control of requisitions for purchase orders.

b., Assuring adequate control and temporary storage of quality assurance documentation of purchased material, c.

Establishing procedures which prescribe:

1)

Preparation of procurement documents.

2)

Documentation of the_ review and approval of procurement i

documents prior to release and availability of this documentation for verification.

3)

Identification of the. vendor's-quality assurance requirements applicable to the items or services procured.

4)

Identification in the procurement documents of the documentation to be prepared, maintained, and submitted to the purchaser prior to use, such as:

l (a) drawings, specifications, procedures 2515Q

Title:

~ Section W. Procurement Document ~

Contro)

Page: 2 of 2 Rev. No.:

5 Date: 08/31/89 L

(b) inspection and fabrication plans (c) inspection and test records f

(d) personnel and procedure qualifications (e) chemical and physical test results of material (f) 'the company's right of access to the vendor's i

, facilities and records for surveillance to procurement specifications.

5) Assuring that changes and revisions to procurement documents receive reviews and approval at least I

equivalent to those of the original documents.

6) Control of procurement document's for spare and replacement parts such-that the technical requirements are equal to.or better than the original and that all current QA Program requirements are satisfied.
7) Controls for procurement of commercial grade items (CGI)-

to be used in safety class applications such that appropriate assurance of quality is achieved..

l

8) -Inclusion of 10CFR21 reporting requirements in procurement documents when applicable.
9) Provisions to satisfy Regulatory. Guide 1.123, Revision 1

-(ANSI Standard N45.2.13 --1976), as it pertains to procurement document control.

3.

The Plant Engineering Department shall be responsible for:

a.

Review of purchasing specifications which detail the-technical requirements for material, equipment and service C

purchases.

[

b.

Reviewing and specifying technical requirements for material, equipment, and scrvice purchases.

I c.

Evaluation of commercial "off-the-shelf" items for

(

suitability for use in safety classified systems, components l

or structures prior to use.

l l

4.

All departments shall be responsible for adhering to the procurement procedures established per 2.c..

2515Q l

Title:

'Section V.

Instructions.

1 Procedures, and Oracinas Page:

1 of 1 Rev. No.:

5 Date:

08/31/89

.i V.

INSTRUCTION

S. PROCEDURE

S. AND ORAWINGS A.

}QPg This section establishes measures to assure that activities affecting quality are prescribed and implemented.by instructions, procedures or drawings appropriate to the circumstances.

8.

RESPONSIBILITIES 1.

The Quality Programs Department shall be responsible for evaluation of instructions, procedures, and drawings.

2.

The Operational Support Department shall be responsible for establishing procedures which prescribe preparation and use of, and adherence to procedures.

3.

The Plant Engineering Department shall be. responsible.for establishing procedures which prescribe preparation and

  • Implementation of design change installation instructions and-drawings, including changes.

f 4.

All departments shall be responsible for:

Preparing and implementing instructions and procedures a.

associated with activities affecting quality including j

, computer programs controlled by Maine Yankee.

b.

Assuring that specifications, instructions, procedures and drawings include appropriate quantitative and qualitative acceptance criteria, as applicable, for determining that activities have been satisfactorily accompilshed.

t 2515Q

Title:

Section VI. Document Control Page:

1 of 2 Rev. No.:

5 Date: 08/31/89 VI.

DOCUMENT CONTROL A.

SCOPE This section establishes measures to assure that proper documents, such as procedures, instructions and drawings, are available for use in activities affecting quality. The measures provide for review, approval, issuance and control of documents, including revisions thereto.

B.

RESPONSIBILITIES' 1.

The Quality Programs Department shall be responsible for:

a.

Evaluation and/or audit of document control systems at Maine Yankee and vendors.

[

b.

Review and approval of all Quality Assurance implementing procedures (0-series).

i l

l c.

Review of maintenance, modification and inspection i

procedures for inclusion of quality assurance requirements.

2.

The Administration Department shall be responsible for establishing document control procedures which prescribe:

a.

Sequence of actions-and responsibilities for review, approval, and control of procedures, b.

Review of procedures by appropriately quallfled personnel, c.' Establishment of distribution lists.

l L

d.

Action to be taken for obsolete or superseded documents.

l l

e.

Review and approval of document changes by the same l

organizations that performed the original review and approval or by other responsible organizations delegated by Maine Yankee f.

Inclusion of approved changes in procedures and other applicable documents prior to placing the system in operating status.

g.

Ava11abillty of proper and current documents at the location where tice activity is to be performed prior to commencing the work.

25150

-. - - - - = _..

Title:

~ Section VI.

Document Control

-Page:

2 of 2

'3 Rev..No.:

5 Date: 08/31/89 h.

Establishment, revision, and distribution of _ a master list or equivalent to identify the current revision nuiioer of procedures, specifications, or other quality assurance i

documents as applicable.

1.

Identification of documents to be controlled which shall include, as a minimum:

4

1) Design documents, including calculations, drawings, specifications and analyses.
2) Design, manufacturing, construction, and installation l

drawings

3) Procurement documents
4) Operational. Quality Assurance Program and Manual and maintenance and operating procedures
5) Maintenance, modification, inspection and test

(

instructions

6) Test documents-
7) Design change requests 8)

FSAR

9) Nonconformance reports-3.

The Plant Engineering Department and/or YNSD shall be responsible for:

Controlling the issuance of engineering drawings, general a.

specifications, welding and nondestructive examination procedures.

b.

Revision and distribution of welding and nondestructive j

examination procedures.

c.

Maintenance and distribution of general specifications, controlled drawings and installation instructions.

d.

Establishing procedures which prescribe the receipt, distribution, revision and use of Vendor Instruction Manuals.

4.

All departments shall be responsible for adhering to the document control procedures established per 2, above.

2515Q

Title:

Section VII. Control of Purchased J

Material. Eautonene & Services 4

Page:

i of 3 Rev. No.:

5 Date:

08/31/89 l

l VII.

CONTROL OF PURCHASED MATERIAL, E0VIPMENT AND SERVICES I

A.. j@PE P

~

This section establishes measures to assure that purchased material, equipment and services, whether purchased directly or through contractors and subcontractors, conform to the procurement documents.

l B.

RESPONSIBILITIES.

l 1.

The Quality Programs Department shall be responsible for:

a.' Performing audits of vendor quality programs, via YNSD Quality Assurance Department, based on one or more of the following:

1) Vendor's capability to comply with the applicable criteria of 10CFR50 Appendix B and/or ANSI N18.7.
2) Review of vendor's previous records and performances.

l

3) Surveillance of vendor's facilities / services and QA l

Pr.ogram to determine vendor's ability to produce the item to the purchase specifications.

4) Review of the supplier's current quality records supported by qualitative and quantitative information which can be objectively evaluated.

The evaluation may include review and evaluation of the supplier's Quality Assurance Program, Manual and Procedures, as appropriate.

b.

Planned vendor surveillances, in conjunction with YNSD-QA, which provide for:

1) Specification of processes to be witnessed or verifled, the surveillance method and documentation required, and personnel responsible for performing the surveillance.-

l 2). Assurance that the vendor complies with the quality requirements by surveillance of in-process work at intervals consistent with the importance, complexity and quality of the item.

c.

Documentation and maintenance of the results of vendor audits and surveillances, including a listing of qualif ted vendors, in conjunction with YNSD-QR.

6

-25150 N

v--P9'-

4 w-w

-w ma w

e mwe m---w

h

Title:

Section VII.' Control of Purchased Material. Eautement & Services Page:

2 of 3 Rev. No.:

5

~

Date:

08/31/89 f

d.

Surveillance of material and/or services control.

e. -Surveillance. of bids to assure adequacy of_QA requirements.

j l

i f.

Receipt inspection of vendor furnished material to assure:

]

l 4

1) Material is identified and conforms with receiving _

documentation.

t

2) Material and documentation are inspected in accordance.

with predetermined instructions or recognized standards.

and are determined acceptable prior to use.

I

3) Inspection, test and other records (or certificates of 4

conformance testing to material acceptability) are 4

j on-site prior to use.

Certificates of conformance shall contain as a minimum:.

-(a) Identification of purchased material or equipment.

j such as by the purchase order number.

(b)

Specific procurement requirements met by the purchased material or equipment, such as codes, standards and other specifications.

(c)

Purchase reqetrements not met and the resolution of the nonconformance.

(d) Attested to by a person responsible for the quality assurance function including,their title.

4) Items are identified as to their inspection status prior to release for controlled storage, installation or further work.

g.

Verifying the validity of supplier certificates-of conformance.

h.

Establishing procedures, in conjunction with YNSD-QA, to satisfy Regulatory Guides.I.38.. Revision 2 (ANSI Standard i

N45.2.2 - 1972) and 1.123, Revision 1 (ANSI Standard

)

N45.2.13 - 1976), as pertains to vendor audit and surveillance and to receipt inspection.

I

.2515Q.

l

Title:

Section V!!. Control of Purchased Material. Eauipment & Services l

I

. Page:

3 of 3 Rev. No.: 5 i

l Date: 08/31/89 2.

The Materials Management Section shall be responsible for:

a.

Control of material and equipment untti issued.

b.

Establishing procedures to satisfy Regulatory Guides 1.38, i

Revision 2 (ANSI Standard N45.2.2 - 1972) and 1.123, t

Revision I (ANSI Standard N45.2.13 - 1976), as pertains to i

l control of purchased material, equipment and services.

l

\\

l 3.

All departments,shall be responsible for:

I a.

Control of material and equipment after issuance from Stores.

1 i

l b.

Bid evaluttion as applicable.,

c.

Evaluation of purchased services during and/or after completion of the service.

I l

v l

e

}

1 1

\\

l 1

l 1

25150

Title:

Section VLII.

Identification &

1 Control of Material. Parts and

)

Components l

J Page:

1 of I Rev. No.:

5 Date: 08/31/89 VIII.

!DENTIFICATION AND CONTROL OF MATERIAL, PARTS AND COMPONENTS l

A.

gp_P[

This section establishes measures for identification and control I

necessary to prevent the use of incorrect or defective material, parts, and components.

8.

RESPONSIBILITIES 1.

The Qualit,y Programs Department shall be responsible for:

l 4.

Evaluation, audit and/or inspection of the control and 1ssuance of materlats, parts, and components covered by the Operational Quality Assurance Program.

b.

Review of vendor Quality Assurance Programs for traceability of materials through the use of heat number, part number, or serial number, either on the item or on records traceable to the items.

2.

The Materials Management Section shall be responsible for establishing procedures for the identification and control of i

materials, parts, and components, including partially fabricated subassemblies and consumables, to prevent the use of incorrect, defective or outdated items.

The procedures shall require the following:

Identification is maintained either on the item, in a a

location and with a method which does not affect its fit or function, or on records traceable to the ites.

1 b.

Maintenance of traceability of materials and parts to the appropriate documentation such as drawings, specifications, purchase orders, manufacturing and Inspection documents, deviation reports, and physical and chemical mill test reports.

c.

Identification of materials, parts, and components is verified and documented prior to release for use.

3.

All departments shall be responsible for adhering to the identification and control procedures established per 2, above.

i 25150

Title:

Section IX. Control of Special j

Processes i

Page:

1 of 2 Rev. No.:

5 i

Date:

08/31/89 IX. CONTROL OF SPECIAL PROCESSES A. EE[

i This section establishes measures to assure that special processes.

I including welding, heat treating, and nondestructive testing, are controlled and accomplished by quallfled personnel using qualifted r

procedures in accordance with appitcable codes, standards, specifications, criteria and other special requirement *,

j t

i

.i B.

RESPONSIBILITIES l

1.

The Quality Programs Department shall be responsible for:

^

a.. Evaluation, audit and/or inspection of the control of j

special processes.

b.

Performance and/or evaluation of certain nondestructive tests in accordance with Yankee Nuclear Services Division Helding and Nondestructive Examination Procedures.

c.

Training, qualtftcation, and requalification of Maine Yankee personnel in nondestructive examination.

d.. Review of special process documents provided by vendors for use on-site and when otherwise specified.

2.

The Plant Engineering Department shall be responsible for establishing procedures which prescribe control of special processes, including a.

Verification that qualification records of procedures, equipment, and personnel connected with special processes are in accordance with applicable codes, standards, and i

specifications as applicable.

.l b.

Special processes are accomplished in accordance with written process sheets or equivalent with recorded evidence of. verification.

l

'. Maintenance and updating of qualification records of special c

l process procedures, equipment, and personnel as applicable.

1 3.

The Yankee Nuclear Services Division shall be responsible for approving documents for welding, and nondestructive examinations.

j 4

t

. 25150

Title:

Section IX.

Control of Special,

Processes Page: 2 of 2 Rev No.: 5 Date: 98!_31/89

)

4.

All departments shall be responsible for:

a.

Assurance that work involving special processes is performed by quallfled personnel in accordance with approved documents, b.

Control of material used in special processes, c.

Review of special process documents, as applicable, provided by vendors for use on-site and when otherwise specified.

1 1

)

f i

9 4

25150

Title:

Section X.

Inspection Page:

1 of 2 Rev. No.: 5 Date: 08/31/89 X.

INSPECT!0li A.. M This section estabitshes measures for inspection of activities l

affecting quality, to verify conformance with approved instructions, procedures, drawings and specification for accomplishing the activities.

l B.

RESPONSIBILITIES

[

l 1.

The Quality Programs Department shall be responsible for:

i lI Review of documentation pertinent to the Inservice a.

Inspection Program.

b.

Evaluation of inspection activities and personnel, Establishingand/orreviewingholdand/ornotification c.

potnts for plant activities.

4 l

d.

Establishing and/or reviewing hold and/or notification points for vendor activities.

[

e.

Writing and approving inspection instructions and check-l i

lists.

i f.

Establishing procedures which prescribe:

1)

Independence of personnel performing the inspection from the personnel performing the activity.

2) Use of procedures, instructions or check itsts which incorporate the following as applicable:

(a) A descr'iption of the type of inspection.

(b) Date and results of the Inspection.

(c)

Information related to conditions adverse to quality.

(d)

Inspector identification.

i 6

4 2515Q

i

Title:

Section X.

InspecQion Page:

2 of 2 Rev. No.:

5 Date: 08/31/89 l

(e)

Evidence as to acceptability of the results.

(f) Action taken to resolve any discrepancies noted.

3) Use of drawings and specifications when performing inspections.
4) Inspection of repairs and replacements in accordance with applicable des'1gn and inspection requirements or acceptable alternatives.
5) Evaluation of processing methods,' equipment, and i

l personnel when direct inspection is not possible.

l l

6) Qualification of inspectors in accordance with appitcable codes, standards, and company training programs; and maintenance of qualifications and certifications.
7) Review of maintenance documents by quallfled personnel knowledgeable in quality assurance to determine the need for inspection, identification of inspection personnel, and documenting inspection results.

=

0

8) When inspections associated with normal operations of the plant (such as routine maintenance, surveillance, and tests) are performed by indtviduals other than those who performed or directly supervised the work, but are 1

within the same group, the following controls shall be met:

(a) The quality of the work can be demonstrated through a functional test when the activity involves.

breaching a pressure retaining item.

(b) The qualification criteria for inspection personnel are reviewed and found acceptable by the QA organization prior to initiating the inspection.

2.

All departments shall be responsible for:

a'. Assuring that activities requiring quality assurance meec predetermined requirements.

9 I

2515Q

Title:

Section x!.

Test Control Page:

1 of 2

)

Rev. No.: 5 l

Date: 08/31/89

\\

i XI.

TEST CONTROL A.

EgP,{

i This section establishes measures for a test program to demonstrate that structures, systems, and components will perform satisfactorily in service.

B.

RESPONS!$1LITIES 1.

The Quality Programs Department shall be responsible for:

h a.

Evaluation of the control of the test program.

b.

Evaluation of the documentation generated during the test program.

2.

The Plant Engineering Department shall be responsible for:

a.

Preparation or review of specifications, requirements, and acceptance criteria for testing following plant changes and maintenance activities.

b.

Determination of when testing is required following plant changes and maintenance activities.

c.

Establishing procedures which prescribe that test documents incorporate or reference the following, as appropriate:

1) Purpose
2) Test date
3) Requirements and acceptance criteria contained in applicable design and procurement documents.
4) Reference sources, such as vendor's literature.

5)

Instructions for performing the test.

6) Precautions
7) Test prerequisites, such as:

(a) Calibrafed instrumentation (b) Adequate and appropriate test equipment and instrumentation including accuracy requirements (c) Trained, qualifted, and licensed / certified personnel 25150

~

i

Title:

Section XI.

Test Control Page: 2 of 2 Rev. No.: 5 Date: 08/31/89

}

i i

(d) Completeness of item to be tested i

(e) Sultable and controlled environmental conditions (f) Provisions for data collection and storage j

(g) Completion of other procedures j

8) Mandatory inspection hold points for witness by owner, j

contractor or inspector, when appitcable.

i f

9) Identification of test prerequisites that must be met,
10) Acceptance and rejection criteria.
11) Method of documenting test data and results.

1 y

12) Identity of person recording the data and approving test j

results.

3.

The Operations Department shall be responsible for establishing

[

procedures to sattsfy the surveillance testing and inspection program provisions of ANSI Standard N18.7 - 1976 (Section 4

5.2.8).

Documents to implement this program shall be consistent with the requirements of 2.c. above, and shall also require recording the as-found condition, corrective actions performed, if any, and as-left condition.

l l

l 4.

All departments shall be responsible for:

l l

a.

Supplying qua11 fled personnel and calibrated equipment for test 1ng.

r I

l b.

Establishing test programs, procedures and acceptance criterla to satisfy the procedures established per 2.c and 3, above.

t c.

Scheduling and performing tests.

d.

Documenting, evaluating, and approving test results.

e D

25150

s h

Title:

Section XII. Control of Measuring and Test Ecutoment l

Page:

1 of 2 Rev. No.:

5 l

Date: 08/31/89 i

XII. CONTROL OF MEASURING AND TEST EQUIPMENT y

A* E This section estabilshes measures to assure that tools, gaqes, i

instruments, and other measuring and test equipment, used 'n t

activities affecting quality, are controlled and at specified periods calibrated and adjusted to maintain accuracy within necessary Italts.

i B.

RESPONSIBil.! TIES s

1.

The Quality Programs Department shall be responsible for evaluation and/or audit of the estabitshed program for the control of measurin'g and test equipment.

2.

The Maintenance Department shall be responsible for establishing l

procedures which prescribe:

1 a.

Identification of measuring and test equipment and traceability to the calibration data.

b.

Labelling or tagging of measuring and test equipment to indicate due date for calibration.

(Other means may be employed provided there is adequate assurance out-of-calibration devices will not be used),

c.

Calibration of installed plant instrumentation-and control systems to assure conformance with the Plant Technical

', Specifications.

d.

Calibration of measuring and test equipment (other than c.,

above) at specified intervals based on type of equipment, required accuracy, purpose, degree of usage, rettabillty, stability characteristics, and other conditions affecting the measurement.

e.

Traceability of reference standards to nationally recognized standards; gr, documentation of the basis for calibration where national standards are nonexistent.

i l

t 25150

l

Title:

Section XI!. Control of Measurino l

i and Test Eautoment Page:

2 of 2.

j i

Rev. No.:

5 Date: 08/31/89 I

j i

f.

Callbration accuracy requirements shall be as follows:

l

)

t t

i

1) Measuring and test equipment shall be of equal or greater accuracy as the installed instrumentation, j

2)

In general, the inaccuracy of the reference standards shaL1 contribute no more than one fourth of the allowable measuring and test equipment tolerance.

I However, when the actual inaccuracy of the measuring and test equipment is less than one fourth of the installed l

plant equipment tolerance, the requirement of one fourth I

the tolerance between the reference standards and-measuring and test equipment may not be necessary.

l

3) Reference standards shall be calibrated against i

standards of equal or greater. accuracy.

When the foregoing accuracy requirements cannot be attained, the rationale for deviating from these requirements shall be l

, justified and documented and authorized by responsible management. The management authorized to perform this 1

t function shall be identified.

g.

Documentation and maintenance of the status of all items t

l under the calibration systes.

I h.

Documentation of measures taken to determine the validity of previous inspections performed when measuring and test equipment is found to be out of callbration.

l 3.'Ai1departmentsshallberesponsiblefor:

a.

Developing implementing documents for control of measuring and test equipment including identification and calibration

~

for equipment under their control.

b.

Providing calibrated tools, gages and instruments.

c.

Maintaining calibration records, d.

Preparing and reviewing specifications for measuring and test equipment, to appilcable requirements, Adhering to the measuring and test equipment control e.

procedures established per 2, above.

I 4

25150

.. ~ - -

Title:

Section XH I.

Handling, Storage And Shipping Page: I of 2 1

Rev. No.:

S Date: 08/31/89 i

XIII. HANDLING. STORAGE AND SHIPPING l

A. g This section establishes measures to control the handling, storage, shipping, cleaning and preservation of material and equipment to prevent damage or deterioration.

I l

l B.

RESPON$15!LITIES l

1.

The Quality Programs Department shall be responsible for:

a.

Evaluation, audit and/or inspection of the handling, storage and shipping of materials, parts, and components, i

b.

Evaluation and/or audit of handling, storage, and shipping documents.

i c.

Review of engineering specifications and procurement documents to assure that proper handling, storage, and shipping requirements have been specified.

l 2.

The Materials Management Section shall be responsible for establishing procedures which prescribe:

a.

Specification and accomplishment of special handling, i

preservation, storage, cleaning, packaging, and shipping l

requirements by suitably tralned individuals in accordance with predetermined work and inspection instructions for critical, sensitive, perishable or high value items, I

i b.

Preparation of instructions in accordance with design and i

specification requirements to control the cleaning, I

handling, storage, packaging, shipping and preservation of safety classified materials, components and systems to preclude damage, loss or deterioration by environmental conditions such as temperature or huntdity.

c.

Provisions for the storage of chemicals, reagents (including shelf Ilfe), lubricants, and other consumable materials under their control.

d.

Provisions to satisfy Regulatory Guide 1.38 Revision 2 (ANSI Standard N45.2.2 - 1972), as pertains to handling, storage and shipping, e.

Provisions for a Preventive Maintenance Program for l

materials, items and components, as applicable, under their control.

i 1

25150

Title:

SecQ1on xt!!.

Handlino. Storace and Shtoo na Page:

?. of 2 Rev. No.:

Date:

/89 3.

The Chemistry Section is responsible for establishing procedures which prescribe provisions for the storage of cheetcals and reagents (including shelf Ilfe) under their control.

4.

All departments shall be responsible for:

a.

Developing implementing documents for handling, storage and shipping of materials and equipment to satisfy the procedures estabitsbed per 2. above as necessary, b.

Providing suitable facilities and equipment for handling, storage, and shipping of materials as necessary.

c.

Inspecting and testing special hand 11ng tools and equipment.

~

d.

Providing and controlling special handling tools and equipment to ensure safe and adequate handling.

S e

4 e

4 4

4 25150

Title:

Section XIV.

Inspection. Test &

Operatino Status Page:

) of I l

Rev. No.:

5 L

Date: 08/31/89 XIV.

INSPECTION, TEST AND OPERATING STATUS A. M This section establishes measures for indicating the status of items l

undergoing inspections and tests (via tags, labels, log books, l

etc.), to prevent the unintentional bypass of required tests.

In addition, this section establishes measures for indicating the operating status of components and systems to prevent their inadvertent operation.

l l

8.

RESPONSIBILITIES 1.

The Quality Programs Department shall be responsible fdr the

~

evaluation of inspection, test and operating status of systems i

and components throughout fabrication, installation, and test.

2.

The Operations Department shall be responsible for:

The status of operating equipment or systems removed from a.

service for maintenance, test, inspection, repair, or change.

b.

Periodic review and update of standing orders.

c.

Periodic review, updating and cancellation of special orders, d.

Periodic review to evaluate plant operations and plan future activities. The important elements of the reviews shall be documented.

e.

Establishing procedures to satisfy the equipment control provisions of ANSI Standard N18.7 - 1976 (Section 5.2.6).

[

3..All departments shall be responsible for:

a.

Informing the Operations Department of the current status of equipment or systems removed for repair, maintenance, test, inspection, or change.

b.

Designating personnel who are responsible for the status of equipment and systems.

1 l

1 25150 l

Title:

Section XV.

Nonconforning a

Materials Parts and Components Page:

1 of 2 Rev. No.:

5 Date: 08/31/89 i

XV.

NONCONFORMING MATERIALS PARTS AND COMPONENTS L

i l

A. E This section establishes measures to control items, services or activities which do not conform to requirements.

8.

RESPONS!8!LITIES i

1.

The Plant Manager shall be responsible for reviewing significant j

nonconformance reports.

2.

The Quality Programs Department shall be responsible for:

a.

Evaluation of the system for controlling nonconforming material, parts and components, b.

Review and concurrence of dispositions and corrective actions of nonconformance reports provided by the applicable department.

i c.

Establishment of measures to provide'for the documented control of nonconforming materials, parts, and components in order to prevent their inadvertent use or installation.

l

\\

d.

Followup and closeout of nonconformances.

e.

Establishing procedures which prescribe:

1) Identification, documentation, disposition, inspection and segregation of nonconforming items.
2) Identification of those individuals or groups delegated the responsibility and authority for the disposition and written approval of nonconforming items.

3)

Inspection and test of reworked or repaired items which require reinspection and retest to original methods or methods equivalent thereto.

2515Q

Title:

Section XV.

Nonconforntno Materials. Parts and Components l

i i

l Page:

2 of 2 Rev. No.:

5 Date: 08/31/89 j

4)

Inclusion of nonconformance reports dispositioned

" accept as is" or " repair" as part of the inspection records furnished to the plant.

j

5) Periodic analysts of nonconformance reports to show quality trends with the results reported to management for. review and assessment.
6) Documentation of the identification, description, 1

disposition, inspection and. signature approval of the 4

disposition for nonconformances in a nonconformance 1

report.

3.

The Plant Engineering Department shall be responsible for:

a.

Review of nonconforming items which cannot be corrected by -

vendor action.

i b.

Preparation or approval of implementing documents for repair j

and/or rework of nonconforming items.

4 4.

The Materials Management Section shall be responsible for-

)

)

establishment of a feedback system between Maine Yankee and i

l Vendor Representatives in regard to nonconforming material.

l l

4 4

4 0

4 4

4

~

2515Q

~

Title:

Section XVI.

Corrective Action Page:

1 of 2 Rev. No.:

5 Date: 08/31/89 i

t i

XVI.

CORRECTIVE ACTION A. M i

This section establishes measures to assure that conditions adverse 4

i to quality are promptly identified and corrected.

For significant conditions adverse to quality, the measures phall assure that the l

cause of the condition is determined and documented, and corrective t

action taken 1s to preclude repetition.

i t

j B.

RESPONSIBILITIES 1.

The Quality Programs Department shall be responsible for:

a.

Evaluation and/or audit of plant activities which identify, review and correct conditions adverse to quality.

b.

Evaluation and/or review of documentation of corrective action.

i E.stablishing procedures which prescribe:

i c.

1)

Identification and correction of conditions adverse to quality.

l

2) Significant conditions adverse to quality, the cause.

l and action taken to preclude repetition are documented

  • l and reported to management.

2.

The Plant Engineering Department shall be responsible for:

a.

Reviewing significant or recurring design deficiencies to determine the cause.

~

b.

Instituting appropriate changes in the design process to prevent similiar deficiencies from recurring.

3.

All departments shall be responsible for:

a.

Identification and correction of conditions adverse to

quality, b.

Identification and documentation of the cause and preparation of recommendations to preclude repetition of signtficant conditions adverse to quality.

9 e

4 25150

Title:

Section XVI.

Corrective Action Page: 2 of 2 Rev. No.: 5 Date: 08/31/89 c.

Implementation of corrective action including..as appropriate, action to preclude repetition.

d.

Documentation of corrective action taken, j

2 3

h I

b e

F l

t l

4 t

4 b

j

. [

.g 4

4 25150

Title:

Section XVII. Quality Assurance Re ords i

Page:

l of 2 j

Rev. No.:

5 Date: 08/31/89 XVII. QUALITY ASSURANCE RECORDS A.

$G91 1.

This section establishes measures for maintenance of records which provide documentary evidence of the quality of items and of activities affecting quality. Requirements shall be I

s established for identification, transmittal, retrievability and retention of quality assurance records including duration,

?

l, location, prot.ection and assigned responsibility.

2.

The quality assurance records shall include plant history; operating logs; principal maintenance; design change activities; reportable occurrences; nonconformance reports; i

i.

results of reviews, inspection, tests, audits and material analyses; monitoring of work performance; qualification of i

personnel, procedures and equipment; drawings; specifications; procurement documents; calibration documents and reports; 4

corrective action reports; and other records required by Technical Specifications.

)

B.

RESPONS!8!LITIES 3

1.

The Quality Programs Department shall be responsible for:

a.

Evaluation and/or audit of quality assurance record review, control and retention,

'b.

Maintenance of audit, evaluation, inspection, and vendor surveillance records generated by the Quality Assurance Department.

2.

The Yankee Nuclear Services Division shall be responsible for:

a.

Maintenance of audit. Inspection and vendor surveillance records generated by YNSD.

b.

Maintenance of design documents generated by YNSD and not retained by Maine Yankee.

3.

The Administration Department shall be responsible for:

a.

Providing for the receipt, storage, preservation, safekeeping, retrieval and final disposition of QA records.

2515Q

Title:

Section XVII. Ous11ty Assurance Records Page:

2 of 2 Rev. No.:

5 Date: 08/31/89 b.

Maintaining factittles for the permanent and. temporary storage of records to prevent destruction of the records by fire, flooding, theft, and deterioration caused by a combination of extreme variations in temperature and humidtty conditions. Duplicate records shall be stored in a separate remote location when the type of document 1$ not included in the record storage facility.

c.

Establishing procedures to satisfy Regulatory Guide 1.88, Revision 2 (ANSI Standard N45.2.9 - 1974).

4.

All departments shall be responsible for:

Adhering to the records controls procedures estabitshed per a.

3.c. above, b.

Identifying department QA records and establishing retention periods in accordance with R.G. 1.88, Rev. 2 (ANSI N45.2.9-1974) and Maine Yankee Technical Specificattons.

e 4

6 4

a e

25150

Title:

Section XVIII. Audits Page:

1 of 3 Rev. No.:

5 Date: 08/31/89 XVIII. AUDITS A. M This section establishes measures for a system of planned and documented audits to verify compliance with all aspects of the Program and to assess the effectiveness of the Program.

B.

RESPONSIBILITIES 1.

The Quality Programs Department shall be responsible for:

a.

Providing approved audit procedures or check lists for audit of activities encompassed by the 18 criteria of 10CFR50 Appendix 8 ANSI N18.7 and Plant Technical Specifications.

b.

Providing for training of audit personnel, c.

Scheduling and coordinating of the In-plant Audit Program.

d.

Preparing, reviewing and/or approving implementing documents for In-plant audits which prescribes:

1) Documentation of audit results and review with tr.nngement having responsiblitty in the area audited.
2) Necessary action to be taken by responsible management to correct deficiencies revealed by the audit.

3)

Inclusion of an objective evaluation of quality-related practices, procedures and instructions and the effectiveness of implementation in the audtt; 4)

Inclusion of an objective evaluation of work areas, activities, processes and items and the review of documentation in the audit.

5)

Reaudit of deficient areas until corrections have been accomplished to preclude repetition of the deficiencies, as appropriate.

i 25150

1

Title:

Section XVI!!.

Audits Page: 2 of 3 Rev. No.:

5 Date: 08/31/89

6) Performance of audits where the requirements of Appendix B to 10CFR Part 50 and ANSI N18.7 are being implemented.
7) Performance of audits as required by the Plant Technical Specifications.
8) Scheduling of audits regularly on the basis of the-status and safety importance of the activities being performed.
9) Regularly scheduled audits shall be supplemented by audits as determined by the Manager. Quality Programs-for one or more of the following condttions:

(a) When significant changes are made in functional areas of the quality assurance program such as significant reorganization or procedure revisions.

(b) When it is suspected that the quality of the item is in jeopardy due to defletencies in the quality assurance program.

(c) When a systematic, independent assessment of program effectiveness is considered necessary.

(d) When necessary to verify implementation of required corrective act1on.

10) Independence of the auditors from direct responstb111ty for the area being audtted and independence from reporting to a management representative of the area being audited, e.

Conducting, reporting and following up on'audtts to satisfy Regulatory Gutde 1.144 - January 1979 (ANSI Standard N45.2.12 - 1977).

f.

Preparing information regarding the In-plant Audit Program for review by the Nuclear Safety Audit and Review Committee.

g.

Performing random informal evaluation of plant activities.

h.

Providing for audits of vendors.

2515Q

Title:

Section XVIII.

Audits Page:

3 of 3 Rev. No.:

5 Date: 08/31/89 2.

The Manager of each audtted organization shall be responsibh for:

a.

Providing reasonable and timely access of audit personnel to fac111tles, documents and personnel.

b.

Evaluation and approval of recommended corrective action f

for In-plant Audtt deficiencies.

3.

All departments shall be responsible for:

a.

Investigation and response to audit deficiencies.

b.

Implementation of corrective action approved by management.

(

r i

4 l

r l

l s

\\'

e 4

?

t o

i

?

e 2515Q

, ~. _...

m

i

Title:

Anoendix A.

Qualification Reautrements Page:

1 of 1 Rev. No.:

5 f

Date: 08/31/8g QUALIFICATION REQUIREMENTS FOR THE l

MANAGER QUALITY PROGRAMS The Manager. Quality Programs must meet the below IIsted qualification requirements:

EDUCATION:

Bachelor Degree in Engineering or related science, or the equivalent in practical experience.

EXPERIENCE:

Four (4) years experience in the field of quality assurance.

or equivalent number of years of nuclear plant expertence in a supervisory position preferably at an operating nuclear plant or a combination of the two. At least (1) year of this four years expertence shall be nuclear power plant expertence in the implementation of the quality assurance program. Six '(6) months of the one year experience shall be obtained within a quality assurance organization.

l An additional year of quality assurance program implementation experience may be substituted for 6 months expertence within a quality assurance organization.

1 l

l 1

i 1

s i

l

\\

.25150'

4

Title:

Appendix B.

Maine Yankee Responsibilities Page:

1 of 15 Rev. No.:

5 Date: 08/31/89 l.

Vice President - Yankee Nuclear Services Olviv.cn (YNS0)

Reports directly to the President.

i The Vice President (YNS0) is responsible for:

i a.

Providing review of designated activities via the Nuclear Safety i

and Audit Review Committee (NSARC), as required by the technical i

specifications or requested by Maine Yankee.

l Monitoring reshnses to NSAR committee and Maine Yankee Project j

b.

Manager recommendations and bringing all safety related disputes, i

disagreements, or discrepancies, which cannot be resolved at a lower level, to the attention of the Maine Yankee President.

c.

Providing personnel to perform independent audits of the Maine i

Yankee Operational Quality Assurance Program implementation as requested by Maine Yankee.

d.

Providing personnel to perform independent engineering reviews of safety class design changes as requested by Maine Yankee.

e.

Providing personnel to develop and maintain special process i

procedures, such as NDE, Welding, and Heat Treating.

f.

Providing personnel for technical, engineering, licensing.

compliance, operational, and quality assurance support as requested by Maine Yankee.

i l

j g.

Providing personnel to perform audits, evaluations, inspections.

[

and vendor surveillances as requested by the Vice President.

[

Licensing and Engineering.

h.

Providing emergency preparedness, environmental, fuel management, and nuclear engineering support as requested by Maine Yankee.

1.

Providing personnel to develop and maintain Yankee Nuclear Services Olvision General Specifications,

j. Providing & Fire Protection Engineer to review design changes to fire protection systems and conponents.

b

+

4 9

25150 s

. - - -. ~ ~,

Title:

Appendi x 8.

Maine Yankee Re5Donstbt1ities Page: 2 of 15 Rev. No.:

5 Date: 08/31/89 i

k.

Providing document control for all QA documents generated and 4

controlled by YNSD.

I 1.

Ensuring that all Yankee NSD personnel working in behalf of or at Maine Yankee are properly trained and qualified to perform their assigned tasks for activities requiring quality assurance.

I 2.

Vice President. Operations Reports to the President.

T.he ylce President. Operations is responsible for:

I a*..

Reviewing changes to the Operational Quality Assurahce Program.

1 b.

Revley of and compliance with Federal and State regulations and sta'idards for nuclear power fact 11tles.

c.

Providing, by assignment of responsibility to an appropriate organizational element, for review and approval of training programs.

[

d.

Reviewing and approving all design changes.

e.

Enforcing company quality assurance policies.

e f.

Advising the Plant Operations Review Committee (PORC) and the Nuclear Safety and Audit Review Committee (NSARC) In engineering, operations, and training, when requested, g.

Tral.ning and qualifying personnel assigned to the Maine Yankee

[

Plant and Training Department.

e 25150 1

Title:

ADDendix B.

Malne Yankee Responsiblitties Page:

?l of 15 Rev. No.:

b Date: 08/31/89

[

3.

Vice President. Licensino and Enatneering

[

Reports to the President.

[

The Vice President. Licensing and Engineering is responsible for:

[

a.

Ensuring that the Operational Quality Assurance Program is

  • [

implemented and maintained for his areas of responsibility.

[

b.

Reviewing changes to the Operational Quality Assurance Program-

[

that concern Nuclear Licensing and Engineering. Engineering and

[

Safety Engineering and Operat1onal Support.

[

c.

Enforcing company quality assurance policies.

l

[

d.

Training and qualifying personnel assigned to Nuclear Licensing

[

and Engitseering.. Engineering and Safety Engineering and Operational Support.

[

e.

Documenting and maintaining quality assurance records associated

[

with his areas of responsibility.

[

f.

Reviewing and approving all design changes.

[

g.

Provide liaison with Vice President (YNSD).

[

On l

1 p

4 i

25150

__.-_,_______m__

Title:

ADDendix 8.

Maine Yankee j

Responsiblitties i

Page: 4 of 15 l

Rev. No.: 5 Date: 08/31/89 t

4.

Vice President. Finance and Administration a

Reports to the President.

I The Vice President Finance and Administration is responsible for:

i 4

a.

Ensuring that the operational Quality Assurance Program is i

implemented for his areas of responsibility, b.

Reviewing changes to the Operational Quality Assurance Program that concern material management and ads.inistration.

Estabitshin!! company policy for materials management and c.

administrat on.

d.

Training and qualifying personnel assigned to Finance and Administration.

l t

l

\\

l Y

A I

25150 I

.. ~,.

l'

Title:

Appendix B.

Maine Yankee Responsibilities Page:

5 of 15 Rev. No.:

5 Date: 08/31/89 5.

Treasurer Reports to the Vice President, Finance and Administration The Treasurer is responsible for:

a.

Processing and control of requisitions for purchase orders, b.

Control and identification of material and equipment upon receipt, storage and issuance by Stores, c.

Control and temporary storage of quality assurance documentation of purchased materials.

d.

Control and maintenance of the plant spare parts inventory system, e.

Selection of quallfled vendors for purchasing material from the Approved Vendor's List or stipulation of additional controls from Quality Programs Department when an approved vendor is not utilized.

f.

Accurate translation of quality requirements to purchase documents.

I g.

Training and qualifying personnel assigned to Finance and

[

Administration Departments.

i I

i d

25150 l

Title:

Appendix B.

Maine Yankee l

Responsibilities Page: 6 of 15 Rev. No.: 5 Date: 08/31/89 6.

Plant Manaaer Reports to the Vice President, Operations.

The Plant Manager is responsible for:

a.

Overall plant activities, b.

Reviewing all changes to the Operational Quality Assurance Program.

c.

Execution of-the administrative. controls and quality assurance program at the plant to assure safety.

'd.

Compliance with all State and Federal license conditions, rules and regulations through the operating staff and supporting organizational elements.

e.

Advising the NSARC in the areas of maintenance, operation, testing and training when requested.

f.. Coordinating between Maine Yankee and Yankee Nuclear Services Division for site activities under his responsibility.

g.

Resolving and implementing recomendations to industry operating problems.

h.

Coordinating activities necessary to support plant-reporting requirements.

1.

Coordinating plant activities necessary to support the plant environmental surveillance program.

,1.

Tralising and qualifying personnel assigned to the Operations, Technical Support and Maintenance Departments.

g l

'2515Q

Title:

Appendix B.

Maine Yankee Responsibilities Page:

7 of 15 Rev. No.:

5 Date: 08/31/89 j

7.

Manaaer. Quality Programs I

Reports to the President.

The Manager, Quality Programs is responsible for:

Maintaining the Operational Quality Assurance Program to the a.

requirements of 10 CF.R 50, Appendix 8, and ANSI N18.7 - 1976.

l Revising the program as standards, regulations,'and experience b.

dictate.

c.

Reviewing design c Mnges, material purchase requests, nonconformances, and maintenance contro1* documents for quality l

requirements, i

d.

Providing personnel for audit, inspection and' surveillance of contractor and vendor activities at the plant to assure compliance with the applicable _ criteria of 10 CFR 50, Appendix 8, and ANSI N18.7 - 1976.

e.

Inspection, evaluation and/or audit of activities affecting the qua11ty of structures, systems and components important to safety.

f.

Atditing of in-plant QA Program implementation.

[

g.

Establishing requirements for and tuplementing the In-plant Audit

[

Program.

I h.

Reviewing and approving changes to the Operational Quality

[

Assurance Program.

[

1.

Reviewing and approving changes to Quality Assurance implementing procedures.

j. Coordinating quality assurance activities among the Company, L

Yankee Nuclear Services Division, and outside agencies, k.

Documenting and maintaining department quality assurance records.

1.

Stopping unsatisfactory work and controlling further-processing, delivery, or installation of a nonconforming item.

m.

Management overview and overall direction and coordination of quality assurance and quality control activities performed by the Quality Programs Department personnel located at the plant.

n.

Training and qualifying personnel assigned to the department.

)

o.

Preparing periodic reports to management.

l 25150

i

Title:

Appendix B.

Maine Yankee 1

Responsibili ti e s Page:

8 of 15 Rev. No.: -5 Date: 08/31/89

[

p.

Auditing of the Operational Quality Assurance Program is performed C

annually or at his option more frequently if circumstances warrant

[

by personnel not having direct responsibility in the areas audited.

[

q.

Ensuring that personnel performing Quality Assurance functions

[

have sufficient authority and organizational freedom to identify l

[

quality problems, to initiate, recommend, or provide solutions, C

and to verify laplementation of solutions.

8.

Manager, Nuclear Enoineerina and Licensing

[

Reports to the Vice President, Licensing and Engineering.

The Manager, Nuclear Engineering and Licensing is responsible for:

a.

Management overview and overall direction and coordination of reload core design and nuclear engineering analysis of plant l

systems.

l

[

b.

Management overview and overall direction and coordination of l

safety analysis activities supporting license amendments, FSAR, j

and demonstration that plant design bases are met.

{

[

c.

Managing Company relations with the USNRC, development of

[

licensing policy, direction and coordination of licensing documents, licensing information systems, and monitoring regulatory developments.

i

[

d.

Management of radiological environmental monitoring, emergency

[

preparedness, maintenance and implementation of plans and programs

[

relating to these areas. Management overview of radioactive and

[

toxic waste control and disposal, and radiological monitoring and

[

control.

e.

Representing the company to government and industry groups.

l f.

Arranging for and managing support activities of YNSD and-outside

'[

vendors and contractors in areas of his responsibility.

[

g.

Management of the Reactor Engineering function including Reactor System Surveillances and component design.

[

h.

Training and qualifying personnel assigned to the department.

[

1.

Providing personnel to supervise and coordinate reactor physics

-[

and nuclear tests for plant operation and adherence to applicable

[

Technical Specifications.

i I

i 25150

Title:

Appendix B.

Maine Yankee Responsibilities Page:

9 of 15 J

Rev. No.: 5 1

Date: 08/31/89 i

[

j.

Maintaining refueling procedures for fuel core components handling

[

and inspection.

[

k.

Providing personnel to perform fuel cycle, nuc1 car engineering and.

[

economic studies requested by the Plant Manager.

9.

Manager. Plant Engineering

[

Reports to the Vice President, Licensing and Engineering.

The Manager, Plant' Engineering is responsible for:

s r

a.

Coordinating the development, review, and implementation of design changes.

b.# Establishing and maintaining the Plant Inservice Inspection Pro

. % gram.

i c.

Providing person.iel to review material purchase requests, nonconformances, corrective actions, maintenance and repair activities, d.

Maintaining and disseminating information regarding engineering codes, standards, criteria and guidelines to appitcable personnel, e.

Coordinating plant engineering activities among Maine Yankee, Yankee Nuclear Services Division,'and outside agencies.-

f.

Providing personnel to perform surveillance programs and test

[

programs assigned by the Vice President, Licensing and Engineering.

g.

Adv1' sing PORC and NSARC in the plant engineering area when l

requested.

h.

Providing technical support to the plant.

1.

Documenting and maintaining quality assurance records associated with plant engineering.

j.. Training and qualifying personnel assigned to the department.

l

-k.

Est'ab11shing and maintaining procedures which prescribe control of L

6 special processes.

[

1.

Establishing and maintaining documentation which designates the

[

safety classification of plant systems.

l l

)

l l

'25150 i'

i

\\

Title:

Appendix B.

Maine Yankee-Responsibilities Page:

10 of 15 Rev. No.:

5 Date: 08/31/89 1

l

10. Manager. Safety Engineerina and Operational Support

[-

Reports to the Vice President Licensing and Engineering.

[

The Manager, Safety Engineering and Operational Support is responsible for:

a.

Advising PORC and NSARC in regulatory compliance areas when requested.

i-b.

Documentation and maintenance of department quality assurance records.

[

c.

Coordinating compliance activities among the company, Yankee Nuclear Services Division, and outside agencies.

[

d. Provide an independent and direct Nuclear Safety overview of plant

[

operation through the Nuclear Safety' Engineer position, j

e.

Coordinating the review of industry operating events to minimize-occurrence at the plant, f.

Providing personnel for operational support to the plant.

g.

Training and qualifying personnel assigned to the department.

i 2515Q

Title:

' Appendix 8.

Maine Yankee

' ~

Responsibilities Page:

11 of T5 Rev. No.:

5 Date: 08/31/89

11. Manager Trainino l

l Reports to the Vice President, Operations.

The Manager, Training is responsible for:

a.

Developing and implementing general employee training.

b.

Providing direct support for operations, skill, technician, and professional training activities.

c.

Advising management of any-practices, circumstances, deficiencies or personnel problems which impact on the quality, quantity, or availability of training.

i d.

Advising management on developments in training techniques, industry standards, and regulations which impact on Maine Yankee l

training policies and practices.

.j e.

Developing and maintaining Maine Yankee training policy and j

procedures.

f.

Coordinating with outside agencies for training matters.

g.

Maintaining the training documentation system.

h.

Training and qualifying personnel assigned to the department.

l

}

l 1

e i

1 I

2515Q l

~.

Title:

Appendix B.

Maine Yankee l

Responsibilities Page:

12 of 15 Rev. No.: 5 Date: 08/31/89 7

12. Manager. Maintenance Reports to the Plant Manager.

The Manager, Maintenance is responsible for:

The quality of work performed by the Maintenance Department.

a.

b.

Scheduling and directing approved maintenance activities.

Preparing and implementing maintenance procedures utilizing sound-c.

engineerin'g policies and practices for the installation of new material, equipment or spare parts.

d.

Establishing and maintaining programs for preventive maintenance, calibration and testing for instruments and mechanical / electrical equipment in conformance with approved procedures.

I Implementing a continuing surveillance program as required by' e.

Technical Specifications.

f.

Documenting and maintaining Maintenance Department quality assurance records.

g.

Training and qualifying personnel assigned to the department.

e 5

t b

e s

9

(

25150

_ _ ___ _ _ _ _ _ _ ~.. _ _ _ _ _ _ _. _ _. _ _ _ _. _ _

Title:

Appendix B.

Maine Yadkee Responsibilities Page:

13 of 15 Rev. No.:

5 Date: 08/31/89

  • N i
13. Manager. Operations Reports to the Plant Manager, The Nanager, Operations is responsible for:

a.

Conducting plant operations in accordance with approved documents and specifications.

b.

Conducting Operations Department systems surveillance and l

operational - testing.

c.

Verifying systes and/or component operability following maintenance, or changes using approved test procedures containing' acceptance criteria as specified in applicable design documents, d.

Safe handling of core 'and reactor components during refueling operations.

i e.

Preparing and maintaining' quality assurance records of Operations Department activities.

I l

l f.

Developing, controlling and maintaining operating.and emergency l

operating procedures.

- 1 l'

g.

Training and qualifying personnel assigned to the ' department.

e 4

9 4

S 9

6 1

2515Q

l

Title:

Appendix 8.

Maine Yankee Responsiblitties Page:. 14 of 15 Rev. No.: 5 Date: 08/31/89

14. Manaaer. Technical Support

- Reports to the Plant Manager.

The Manager, Technical Support is responsible for:

C l

[

l a.

Documenting and maintaining quality assurance records in l-chemistry, radiological controls, and computer via the applicable group.

b.

Controlling and maintaining plant computer systems.

c.' Preparing and maintaining' procedures associated with radiological, chemistry and computer via the applicable group.

l d.

Supervising and coordinating the Hazardous Waste Program.-

e.

Su'pervising and coordinating the Fire Protection and Housekeeping

Programs, f.

Training and qualifying personnel assigned to the department.

7 e

m 4

0 9

..g 4

.(

25150

Title:

Appendix B.

Maine Yankee ResDonsibilities Page:

15 of 15 Rev. No.: 5 Date: 08/31/89 7

L

15. Manacer. Administration Reports to the Vice President. Finance and Administration.

l The Manager, Administration is responsible for:

I a.

Controlling distribution of the Operational Quality Assurance Program.

l.

b.

Controlling distribution, storage and retrieval of quality assurance records.

l-c.

Controlling distribution of Quality Assurance Manual procedures.

l d.

Controlling distribution of vendor procedures used at the plant I.

that affects safety classified structures systems and components.

e.

Administration of the Security Plan.

f.

Training and qualifying personnel assigned to the department.

l 1

\\

l l

l I

t 0

1 i

l l

25150

Title:

Appendix C.

Maine Yankee Classifications Page:

i of 8 Rev. No.:

5 Date: 08/31/89 9

MAINE YANKEE CLASSIFICATION OF STRUCTURES. COMPONENTS AND SYSTEMS APPLICABILITY This Appendix lists the sytems and structures which are subject to QA Program-l controls.

Items added to the list will be subject to QA Program control beginning on the date the addltion is approved.

i I.

STRUCTURES Containment (Including penetrations) - Safety Class 2 II.

ELECTRICAL SYSTEMS AND COMPONENTS _

Electrical and Instrumentation systems and components designed in-l t

accordance with IEEE Standard 279, " Criteria for Protection Systems for Nuclear Power Generating Stations" and IEEE Standard 308, l

" Criteria for Class IE Electric Systems for Nuclear Power Generating-l Stations" have been classified as safety class, and are listed below:

l A.

4160 Volt Switch gear (Engineered Safety Featur.es Buses) 8.

4160 - 480 Volt Transformers (Associated with Engineered. Safety Features) l C.

.4000 and 460 Volt Motors _(Associate with Engineered Safety Features)

D.

480 Volt Switch gear (Engineered Safety Features-Buses) l E.

480 Volt Motor Control Centers (Associated with Engineered Safety i

Features)

F.

125 Volt DC Batteries (Associated with Engineered Safety Features) j G.

Battery Chargers (Associated with Engineered Safety Features)

N.

Inverters, 125 Volt DC to 120 Volt AC (Vital Instrument Buses)

'I.

Vital Instrument Bus Panels l

J.

Regulated Instrument Buses Panels (240/120 Volts AC Single Phase) 1 K.

125 Volt DC Power Panels (Associated with Engineered Safety-Features)

L.

Transformers, dry type, 280-120/240 Volt (Associated with Regulated l

Instrument Buses)

M.

Power Cables (Associated with Engineered Safety Features System)

N.

Instrumentation and Control Cables (Associated with Engineered Safety Feature System)

O.

AC Control Room Lighting 25150

l

Title:

Appendix C.

Maine Yankee-Classificattens l

Page: 2 of 8 Rev. No.:

5 Date: 08/31/89 P.

Diesel Generators (DG-1A, DG-15)

Q.

Diesel Generator Control Panels-(for DG-1A, DG-18)

R.

Heat Tracing for Boric Acid Injection S.

Reactor Protective Systems T.

Engineered Safety Features Actuation Systems U.

Emergency Feedwater Pump Motors P

SECTION II NOTES:

1.

For those electrical and lastrumentation systems designated above, Quality Assurance electrical and instrumentation program requirements are applicable only to those portions of systems.

defined in Section IV as necessary to perform the system safety function; 2.

Instrumentation components included within each instrumentation system-include power supply, sensors, relays, wiring and final operating device (solenold, relay, etc.) as necessary to perform the system safety function..

3.

Electrical components included within each electrical system '

include power source, breaker, control circuit, cable, _ relaying and operating device (motor, solenold, heater, relay, etc.) as necessary to perform the system safety function.

4.'

Certain components are excluded from the QA program requirements if they meet the criteria described in Section III.

III.

ELECTRICAL AND INSTRUMENTATION SYSTEM COMPONENT EXCLUSION CRITERIA p

L 1.

Any component of an electrical or instrumentation system (Section L

II) is excluded from the QA Program requirements if it meets the following criteria:

i a.

A failure of the component by the electrical shorting, open circuiting, grounding or mechanical failure would not render the system incapable of performing its intended safety function.

i b.

A failure of the fluid pressure boundary of the component would not render the system incapable of performing its intended safety function.

c.

It is not used to operate or control a device required by Technical Specifications.

4 2515Q l'

d

~

Title:

Appendix C.

Maine Yankee

+

Classifications Page:

3 of 8 Rev. No.: 5 Date: 08/31/89 2.

Small spare parts having no traceability, such as commercial off the shelf items, may be purchased as non-safety related and then i

accepted for use in equipment requiring Quality Assurance, y

Examples of such items are resistors, capacitors, switches, indicators, coils, wire, connectors, solid state devices and alscellaneous hardware.

IV.

MECHANICAL SYSTEMS AND COMPONENTS Mechanical systems and components have been nuclear safety classified in accordance with ANSI Standard N18.2, " Nuclear Safety Criteria for the Design of Stationary Pressurized Water Reactor Plants".

Instruments, controls, motors, sensors, etc. associated with the nuclear safety classified ' components which assist the components in performing a safety function are in the same safety class as the-component to which they are associated except as noted in Section II above.

Corresponding component supports that provide a safety function are in the same safety class as the components for which they provide support.

Component safety class designations are listed in'the attached Table' y

C.I.

V.

OTHER ITEMS REQUIRING QUALITY ASSURANCE I

Items which require a degree of' quality between non-nuclear safety class, and IE or safety class 1, 2 or 3, shall be designated as QA

[

Related (QAR). QAR materials and components shall be in compliance with those parts of.the QA program necessary to achieve the desired

[

Intermediate level of' quality..A partial list of QA Related items follows:

1.

Fuel Assemblies 2.

Boric Acid 3.

Diesel Fuel Oil (For the Emergency Diesel Generators) 4.

Neld Rod.,

[

5.

Che.micals (Applies for use in Safety Class Systems) a.

Lithium Hydroxide b.

Hydrogen c.

Nitrogen d.

Morpholine e.

Hydrazine

[-

f.

Resins-(Except Makeup Water Treatment and Haste Processing) 6.

Reagents - Those Reagents used in performance of analyses required by Technical Specifications, t

2515Q

-Title: Appendix C.

Maine Yankee o

Classifications

)

Page: 4 of 8

]

Rev. No.: 5 l

Date: 08/31/89 1

6.

Packagin.g of radioactive material for transport.

(As required by 10CFR71) 7.

Control Element Assemblies 8.

Core Support Structure 9.

Structures (Seismic only)*

a.

Primary Auxiliary Building (PA8)-

b.

Fuel Building c.

Service Building d.

Containment Spray Butiding

10. Flued fire protection systems such as piping, valves and sprinkler heads for safety related areas per YA-GEN-9
11. Special Nuclear Material
12. Calibration Services for Controlled Measuring and Test Equipment
13. Liquid penetrant materials
14. Nonmetallic thermal insulation used on safety class austenttic stainless steel
15. Nuclear Grade Paint
16. Containment Ventilation / Purge Filter System l

l l

l

  • Limited to the portion of each structure designed to-safely resist l

hypothetical earthquake loads.

e 2515Q

Title:

Appendix C.

Maine Yankee Classifications Page:

5 of 8 Rev. No.:

5 H

Date: 08/31/89 TABLE C.1 l

(Sheet 1 of 4) 4 MECHANICAL SYSTEMS AND COMPONENTS CLASSIFICATION LI_ST t

SAFETY COMPONENT-CLASS 1

Reactor Coolant System I

Reactor Vessel 1

l Full Length Control Rod Drive Mechanism Housing i

Part Length Control Rod Drive Mechanism Housing 1

Steam Generator (tube side) 1 i

(shell side)-

2 Pressurizer 1

Reactor Coolant Piping and Fittings 1

l Reactor Coolant Surge Pipe and Fittings 1

j Pressurizer Safety Valves 1

Pressurizer Relief Valves 1

t l

Valves to Reactor Coolant System Boundary 1

j Reactor Coolant Pump Casing and Cover 1

l r

l Feedwater System

[

Emergency Feedwater Piping and Valves 3/2 Emergency Feedwater Pumps 3

Demineralized Water Storage Tank 3

Feedwater Piping (inside containment and outside containment to feed REG Isolation Valve) 2 Auxillary Feedwater Piping-and Valves 3/0 Auxiliary Feedwater Pumps 3

e Service Water System' Service Water Pumps 3

I Valves and Piping, 3

Containment Spray System R

Spray Chemical Addition Tank 2

Containment Spray Pumps 2

- 2515Q

d'-

=

Title:

ADDendix C.

Maine Yankee l

Classifications Page:

6 of 8 Rev. No.:

5 Date: 08/31/89 TABLE C.1 (Sheet 2 of 4)

SAFETY' COMPONENT CLASS Chemical and Volume Control System Regenerative Heat Exchanger 2

Letdown Heat Exchanger (tube side) 2 (shell side) 2 Reactor Coolant Purification Dominerallzers

-2 Reactor Coolant Filter 2

Charging Pumps Centrifugal _

2 Auxiliary Charging Pumps 2

Seal Water Supply Filters 2

Seal Water Return Filter 3

l Seal Water Heat Exchanger (tube side) 3 (shell side) 3 Boric Acid Storage Tank 3-Boric Acid Transfer Pumps 3

Boric Acid Filter 3

Boric Acid Mix Tank 3

Volume Control Tank 2

Letdown Flow Control Valves 2-Safety injection-System F.ef"ueling Water Storage Tank 2

Safety Injection Tanks 2

l Low Pressure Safety Injection Pumps 2

i '.

Residual Heat Removal Systes Residual Heat Exchangers (tube side)-

2 (shell side)

.3 s

' Radioactive Gaseous Waste System i

Waste Gas Compressor 3

Naste Gas Surge Tank 3

Gas Decay Drums 3

2515Q

~ -

(

r.

Title:

Appendix C.

Maine Yankee Classifications Page:

7 of 8 Rev. No.:

5 Date: 08/31/89 TABLE C.1.

(Sheet 3 of 4)

SAFETY Q.LA}]._

Q COMPONENT-Component Coolina Water Syjp g l

Component Cooling Water Pump 3

Component Cooling Water Surge Tank 3

Component Cooling Water Heat Exchangers 3

Main Steam System Main Steam Piping (from Steam Generator

~

up to and including non-return valves) 2-Safety Valves 2

Atmospheric Dump Valve 2-Steam Generator Blowdown System 3

Piping (up to and including isolation valve) 2 i

~Emeroency Diesel Generator System

]

Diesel Fuel Day Tank-3 i

{

Diesel Engines 3

l Diesel Fuel 011 Transfer System 3

Diesel Fuel Supply Tank 3'

l l

Emeroency Diesel Generator Startina Air System

[

Diesel Generator Air Tanks 3

Piping and Fittings 3

3 Valves Filter Housings 3

J Instrument Air System Back-up air supply to Containment Purge and Isolation Valves (downstream of check valves) 3 Isolation air supply to Emergency Feedwater System Flow Control Valves (downstream of check. valves) 2 Isolation' air supply to Emergency Feedwater System-i Isolation Valves (downstream of check valves) 3

..25150

7 l

Title:

Annendix C.

Maine Yankee g

1 assifications Page:

of 5 1

Rev. No.: 1 Date: i.8/31/ss TABLE C.1 (Sheet 4 of 41 ll

..i SAFETY I-CQMPQNINT M

Soent Fuel Pool Cooline and Cleance System 4

Spent Fuel Pool Coolln'g Pumps 3

l Spent Fuel Pool Heat Exchanger 3

i Spent Fuel Pool Cooling Loop Valves

~3

)

- Spent Fuel Pool Cooling Loop Piping 3

J Spent Fuel Pool Purification Pump

-3 Handlino Eautoment for Fuel and Reactor Vessel Internals 1

Fuel Transfer Tube Outer Sleeve i

Expanston Joints I

Fuel Transfer Tube and Flange 2

j

'l 4

Eautonent Drainane System l

1 High Pressure Drain Cooler 2

E Primary Drain Tank 3

'l Primary Drains Degasifier 3

Primary Drain Pumps 3

Hydrogen Recombiner Taos Piping

-v

-f Valves R

Ventilation Filter Systems Spent Fuel Pool Deep Bed Filters 3

Control Room Breathing Air System 3

1 Control Room Recirculating Air Systes 3

S l

l l

25150