Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009B510 + (ML20009B510)
- IR 05000213/1981001 + (ML20009B511)
- ML20009B513 + (ML20009B513)
- ML20009B514 + (ML20009B514)
- ML20009B529 + (ML20009B529)
- ML20009B530 + (ML20009B530)
- ML20009B531 + (ML20009B531)
- ML20009B532 + (ML20009B532)
- 05000305/LER-1981-016-03, /03L-0:on 810515,tests Indicated That Two Foxboro RCS Flow Transmitters in Loop a Were Out of Calibr.Caused by Setpoint Drift.Transmitters Recalibr + (ML20009B533)
- ML20009B534 + (ML20009B534)
- 05000305/LER-1981-017-03, /03L-0:on 810515,discovered That High Pressure Reactor Trip Setpoints for Pressure Transmitters Were Higher than Tech Spec.Caused by Setpoint Drift.Instruments Recalibr + (ML20009B535)
- ML20009B537 + (ML20009B537)
- 05000305/LER-1981-018-03, /03L-0:on 810516,testing Indicated That Low Pressure Safety Injection & Reactor Trip Were Below Tech Spec Limits for Pressure Transmitters.Caused by Instrument Drift.Sensing Lines Flushed.Amplifier Replaced + (ML20009B538)
- ML20009B539 + (ML20009B539)
- 05000304/LER-1981-010, Forwards LER 81-010/03L-0 + (ML20009B540)
- ML20009B543 + (ML20009B543)
- ML20009B544 + (ML20009B544)
- IR 05000329/1981009 + (ML20009B545)
- 05000304/LER-1981-010-03, /03L-0:on 810513,following Maint Functional Tests, Loop B Overpower/Temp Delta T Channel Became Erratic.Cause Not Known.Channel Monitored for 84-h W/O Recurrence,Verified Operable & Returned to Svc + (ML20009B547)
- 05000301/LER-1981-004, Forwards LER 81-004/01T-0 + (ML20009B548)
- ML20009B549 + (ML20009B549)
- ML20009B550 + (ML20009B550)
- ML20009B551 + (ML20009B551)
- 05000301/LER-1981-004-01, /01T-0:on 810529,during Maint Shutdown,Msiv 2CV-2017 Failed to Shut.Caused by Two Vent Valves for Air Operator Failing to Open.Valves Replaced + (ML20009B552)
- ML20009B553 + (ML20009B553)
- ML20009B554 + (ML20009B554)
- 05000265/LER-1981-010, Forwards LER 81-010/03L-0 + (ML20009B556)
- ML20009B557 + (ML20009B557)
- ML20009B558 + (ML20009B558)
- ML20009B559 + (ML20009B559)
- ML20009B560 + (ML20009B560)
- ML20009B561 + (ML20009B561)
- ML20009B562 + (ML20009B562)
- ML20009B565 + (ML20009B565)
- ML20009B566 + (ML20009B566)
- 05000265/LER-1981-010-03, /03L-0:on 810515,diesel Generator Declared Inoperable When Trouble Alarm Received & Room Found Full of Smoke.Caused by Control Power Ground Fault.Ground & Damaged Components Repaired + (ML20009B568)
- ML20009B571 + (ML20009B571)
- 05000295/LER-1981-023, Forwards LER 81-023/03L-0 + (ML20009B572)
- 05000295/LER-1981-023-03, /03L-0:on 810422,discrepancies in PT-210 Were Not Reported.Fan Dampers Failed to Open on Fan Start,Fan Failed to Start & Relief Dampers Failed to Close on Fan Trip.Caused by Lack of Tech Spec Directions.Mods Under Investigat + (ML20009B574)
- TXX-3363, Submits Comments on Des.Overall Des Is Reasonable Assessment of Environ Effects of Operation of Facility.Comments Are Offered for Consideration in Preparation of Fes + (ML20009B575)
- 05000237/LER-1981-036-01, /01T-0:on 810602,CRD P-10 Inserted Slowly, Exceeding Limits for One Four Control Rod Array.Caused by Sticking Scram Solenoid Valve S02-0305-118.CRD Rebuilt & Returned to Svc + (ML20009B576)
- ML20009B577 + (ML20009B577)
- ML20009B579 + (ML20009B579)
- IR 05000461/1981012 + (ML20009B580)
- ML20009B581 + (ML20009B581)
- ML20009B582 + (ML20009B582)
- 05000155/LER-1981-010, Forwards LER 81-010/03L-0 + (ML20009B583)
- ML20009B585 + (ML20009B585)
- 05000155/LER-1981-010-03, /03L-0:on 810516,check Valve CV4094 Closing Time Exceeded Tech Specs Limit.Cause Unknown.Investigation Will Be Made During Future Outage.Valve Operating Cylinder & External Linkage Hinge Points Lubricated & Retested + (ML20009B586)
- ML20009B587 + (ML20009B587)
- ML20009B588 + (ML20009B588)