Notice of Violation from Insp on 810502-31
ML20009B579
Person / Time
Site: Clinton Constellation icon.png
Issue date: 07/13/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20009B578 List:
References
50-461-81-12, NUDOCS 8107160317
Download: ML20009B579 (1)


Text

.

Appendix A 10TICE OF VIOLATION Illinois Power Company Docket No. 50-461 As a result of the inspection conducted on May 2 through May 31, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified:

10 CFR 50, Appendix B, Criterion V states: " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings, of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings.

Instructions, procedures, or drawings shall include app opriate quantitative or qualita-tive acceptance criteria for detemining that important activities have been satisfactorily accomplished.

Clinton Power Station Final Safety Analysis Report (FSAR), Paragraph 17.2.5 states: Each Company organization is responsible for developing, reviewing, approving, issuing, and using fomal instructions, procedures, drawings, or related material, as appropriate, for perfoming activities affecting the quality or functions of applicable systems, structures, or components at CPS.

Baldwin Associates Quality Assurance Manual, Paragraph 5.4.2 states:

Activities affecting quality shall be controlled by documented instructions, procedures, or drawings.

Contrary to the above, the rigging, aandling, and installation of the Residual Heat Removal Pump Colum Assembly (IE12-C002B) was perfomed without applicable detailed written procedures or instructions.

This is a Severity Level V violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:

(1) corrective action taken and the results achieved; (2) corrective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved.

Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affimation.

Consideration may be given to extending your response time for good cause shown.