Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005A006 + (ML20005A006)
- GO2-81-128, Responds to IE Bulletin 79-02,Revision 2, Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts. Results of Analysis on Plate Flexibility Sampling Testing Work Will Be Issued in First Quarter of 1982 + (ML20005A007)
- 05000366/LER-1981-049, Forwards LER 81-049/03L-0 + (ML20005A008)
- ML20005A009 + (ML20005A009)
- 05000321/LER-1981-046-03, /03L-0:on 810603,reactor Water Level Switch 1B21-NO17C Found to Actuate Outside Tech Spec.Caused by Switch Setpoint Drift.Switch Recalibr + (ML20005A010)
- 05000338/LER-1981-046, Forwards LER 81-046/03L-0 + (ML20005A011)
- ML20005A012 + (ML20005A012)
- A01482, Informs of Inability to Submit Info by 810622 Re Control of Heavy Loads in Response to to All Licensees of Operating Plants,Applicants for OLs & Holders of Cps. Response to Be Submitted by 810713 + (ML20005A013)
- 05000366/LER-1981-049-03, /03L-0:on 810602,hi Hi Setpoints for Reactor Bldg Vent Radiation Monitors Were Discovered High.Caused by Setpoint Drift.Setpoint Changed + (ML20005A014)
- 05000338/LER-1981-046-03, /03L-0:on 810527,svc Water Supply Header B to Unit 1 & 2 Charging Pumps Was Isolated to Repair Leak in Supply Line.Probably Caused by Sulfate Reducing Bacteria in Svc Water Piping.Piping Replaced.Investigation Underway + (ML20005A015)
- 05000369/LER-1981-062, Forwards LER 81-062/03L-0.Detailed Event Analysis Encl + (ML20005A016)
- ML20005A017 + (ML20005A017)
- 05000369/LER-1981-062-03, /03L-0:on 810421,while in Mode 3,Channel 4 of Steam Generator 1D Narrow Range Level Indicator Failed High. Caused by Loose Plug on Bellow Housing & Condensed Steam Draining from Impulse Line.Plug Tightened + (ML20005A018)
- 05000369/LER-1981-066, Forwards LER 81-066/03L-0.Detailed Event Analysis Encl + (ML20005A019)
- ML20005A020 + (ML20005A020)
- 05000369/LER-1981-066-03, /03L-0:on 810424,while in Mod 3,during Liquid Waste Release from Waste Monitor Tank,Chart Recorder Observed Not Functioning.Caused by Inadvertent Isolation of Flow Transmitter Associated W/Pump.Release Terminated + (ML20005A021)
- ML20005A022 + (ML20005A022)
- ML20005A023 + (ML20005A023)
- ML20005A025 + (ML20005A025)
- ML20005A026 + (ML20005A026)
- ML20005A028 + (ML20005A028)
- W3P81-1517, Forwards Matl Re SER Open Items 48, Reanalysis of Category 1 Structures & 49, Re-Evaluate Foundation Mat for Changes in Value of Subgrade Modulus + (ML20005A029)
- ML20005A030 + (ML20005A030)
- AECM-81-192, Final Deficiency Rept Re Seismically Unqualified 24-inch Starter/Breaker plug-in Drawers,Initially Reported on 810227.Drawers to Be Replaced W/Qualified Drawers of Varying Sizes + (ML20005A031)
- ML20005A032 + (ML20005A032)
- ML20005A034 + (ML20005A034)
- 05000321/LER-1981-049, Forwards LER 81-049/03L-0 + (ML20005A035)
- ML20005A036 + (ML20005A036)
- 05000369/LER-1981-059-03, /03L-0:on 810418,during Mode 3,while Settling Pond Water Being Released,Conventional Waste Water Discharge Flow Meter Strip Chart Recorder Did Not Match Meter Digital Readout.Caused by Switch Not Set to Level + (ML20005A037)
- 05000321/LER-1981-049-03, /03L-0:on 810605,reactor Core Isolation Cooling Valve Would Not Open by Control Switch During Testing.Caused by Relay Cover Binding on Logic Relay.Relay Cover Installed Correctly + (ML20005A038)
- ML20005A039 + (ML20005A039)
- ML20005A041 + (ML20005A041)
- ML20005A042 + (ML20005A042)
- 05000369/LER-1981-063, Forwards LER 81-063/03L-0 + (ML20005A043)
- ML20005A044 + (ML20005A044)
- 05000321/LER-1981-051, Forwards LER 81-051/03L-0 + (ML20005A045)
- ML20005A046 + (ML20005A046)
- 05000369/LER-1981-063-03, /03L-0:on 810422,outer Door of Lower Personnel Air Lock Closed,But Locking Pins Stuck & Seals Failed to Inflate.Caused by Missing Shear Pin on Limit Switch Actuating Shaft.Pin Replaced & Door Declared Operable + (ML20005A047)
- 05000369/LER-1981-064, Forwards LER 81-064/03L-0 + (ML20005A048)
- ML20005A049 + (ML20005A049)
- 05000369/LER-1981-064-03, /03L-0:on 810421,during Mode 3 Initial Fuel Loading,Wrong semi-daily Surveillance Item Checklists Run on Two Successive Shifts.Caused by Use of Wrong Procedures. Correct Checklist Completed & Personnel Cautioned + (ML20005A050)
- ML20005A051 + (ML20005A051)
- 05000321/LER-1981-051-03, /03L-0:810607,turbine Failed to Trip at Less than or Equal to 5,000 Rpm During Testing.Caused by Broken Turbine Trip Ball,Scored Trip Piston & Out of Calibr Diaphragm Oil Control Valve.Ball Replaced & Valve Cleaned + (ML20005A053)
- ML20005A054 + (ML20005A054)
- 0CAN068108, Responds to Generic Ltr 81-07 Re NUREG-0612, Control of Heavy Loads.... Work on Interim Actions Completed.Extension of Select Response Dates Requested.Addl Info on Crane Design Compliance for Overhead Load Handling Sys Encl + (ML20005A055)
- ML20005A056 + (ML20005A056)
- ML20005A057 + (ML20005A057)
- ML20005A059 + (ML20005A059)
- ML20005A060 + (ML20005A060)
- ML20005A061 + (ML20005A061)