Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PNO-IV-81-003, on 810203,employee Received Flash Burns to Eyes & Hands While Using Probe in Electrical Cabinet in 480 Volt Sys.Individual Transferred to Local Hosp.Unit 1 PWR Shutdown Since 810102 for 10-wk Refueling Outage + (ML20003B106)
- 05000267/LER-1981-006, Forwards LER 81-006/03L-0 + (ML20003B107)
- ML20003B109 + (ML20003B109)
- ML20003B110 + (ML20003B110)
- ML20003B111 + (ML20003B111)
- ML20003B112 + (ML20003B112)
- ML20003B114 + (ML20003B114)
- ML20003B116 + (ML20003B116)
- 05000293/LER-1981-001, Forwards LER 81-001/03L-0 + (ML20003B118)
- ML20003B119 + (ML20003B119)
- ML20003B120 + (ML20003B120)
- 05000267/LER-1981-003, Forwards LER 81-003/03L-0 + (ML20003B121)
- ML20003B122 + (ML20003B122)
- 05000293/LER-1981-001-03, /03L-0:on 801226,unidentified Drywell Leakage Measured at Rate Contrary to Tech Specs.Cause Not Known Excessive Leakage Eliminated by Backstating B Recirculation Pump Suction Valve Mo 202-4B & Discharge Valve Mo 202-5B + (ML20003B123)
- ML20003B124 + (ML20003B124)
- ML20003B125 + (ML20003B125)
- ML20003B126 + (ML20003B126)
- ML20003B127 + (ML20003B127)
- ML20003B128 + (ML20003B128)
- ML20003B129 + (ML20003B129)
- 05000267/LER-1981-003-03, /03L-0:on 810106,during Test,One Channel of 1D Helium Circulator Drain Malfunction Found Inoperable.Caused by Blown Switch Module Fuse.Fuse Replaced & Switch Returned to Svc + (ML20003B130)
- ML20003B131 + (ML20003B131)
- ML20003B132 + (ML20003B132)
- ML20003B133 + (ML20003B133)
- ML20003B134 + (ML20003B134)
- ML20003B135 + (ML20003B135)
- ML20003B136 + (ML20003B136)
- ML20003B137 + (ML20003B137)
- ML20003B138 + (ML20003B138)
- ML20003B140 + (ML20003B140)
- ML20003B141 + (ML20003B141)
- ML20003B142 + (ML20003B142)
- ML20003B144 + (ML20003B144)
- ML20003B145 + (ML20003B145)
- 05000339/LER-1981-006-03, /03L-0:on 810107,w/unit at 1% Power,Average RCS Temp Less than 541 F on Two Occasions.Caused by Overfeeding Steam Generators Due to Feedwater Control Problems.Condenser Steam Dumps Closed & Reactor Temp Increased + (ML20003B146)
- ML20003B147 + (ML20003B147)
- ML20003B148 + (ML20003B148)
- ML20003B149 + (ML20003B149)
- 05000339/LER-1981-011, Forwards LER 81-011/03L-0 + (ML20003B150)
- ML20003B151 + (ML20003B151)
- 05000219/LER-1981-029, Forwards LER 81-029/03L-1 + (ML20003B152)
- ML20003B153 + (ML20003B153)
- 05000339/LER-1981-008, Forwards LER 81-008/03L-0 + (ML20003B154)
- ML20003B155 + (ML20003B155)
- ML20003B156 + (ML20003B156)
- ML20003B157 + (ML20003B157)
- TXX-3274, Forwards 381 Electrical,Instrumentation & Control Drawings. Drawing List & Revision Status Encl.Aperture Cards in PDR + (ML20003B159)
- 05000339/LER-1981-008-03, /03L-0:on 810107,primary Coolant Iodine Isotopic Analysis Not Made within 2-6 Hour Per Tech Spec Re Power Changes Exceeding 15% Per Hour.Caused by Failure of Operations Personnel to Follow Procedures.Sample Analyzed + (ML20003B161)
- 05000339/LER-1981-011-03, /03L-0:on 810114,w/unit at 100% Power,Breaker for 2-QS-P-1A Spray Pump Racked Out & Suction Valve MOV-QS-200A Closed & de-energized.Caused by Dirty Seat on Vent Valve. Valve Seat Cleaned & Disc Lapped + (ML20003B163)
- ML20003B164 + (ML20003B164)
- 05000321/LER-1981-005, Forwards LER 81-005/03L-0 + (ML20003B165)