ML20003B155

From kanterella
Jump to navigation Jump to search
Forwards LER 81-008/03L-0
Date released: 01/17/2020 Download: ML20003B155


LER 81-008/03L-0:on 810107,primary Coolant Iodine Isotopic Analysis Not Made within 2-6 Hour Per Tech Spec Re Power Changes Exceeding 15% Per Hour.Caused by Failure of Operations Personnel to Follow Procedures.Sample Analyzed
ML20003B161
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/02/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003B161 (2)
Forwards LER 81-008/03L-0
ML20003B154
Person / Time
Site: North Anna Dominion icon.png
Issue date: 02/02/1981
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20003B154 (1)