Submits Rept Re Failure of or Challenges to Safety/Relief Valves at Facility Through Dec 1980,per NUREG-0737.Provides Synopsis of 800907 Event
ML20003B141
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 02/04/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM NUDOCS 8102100416
Download: ML20003B141 (2)


Text

.,

/

{

SOUTH CAROLINA ELECTRIC a GAS COMPANY POST OFFICE 80x 764 COLUMBIA. SOUTH CAROLINA 29218

[

T. C. NicMots, J R.

Vict Potstormt A80 Gaove Cascv?vyt February 4, 1981 NucLEAm O.cnams L

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 I

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 t

Unexpected Lifting of Pressurizer Safety Valve

Dear Mr. Denton:

This report is submitted in accordance with the requirements of

'NUREG 0737, Item IIK.3, Table C.3 Item 3.

It reflects all events con--

cerning the fa11ure of or challenges to safety / relief valves which occurred at the Virgil C. Summer Nuclear Station through December, 1980.

i Following is a synopsis of our single such event.

I On September 7, 1980, pressurizer safety valve 8010B unexpectedly

[

lifted during the performance of Preoperational Test RC-3, " Pressurizer Pressure and Level Control Functional Test".

This procedure calls for f

Reactor Coolant System (RCS) pressure to be manually increased to verify control functions, alarms, etc.

As RCS pressure was increased, the sub-I ject valve lifted at 2380 psig which is below the proper lift pressure of-2485 psig.

The valve will be reset as a part of the preoperational test program.

There were no failures of valve components or associated systems.

The cause of this event has been determined to be improper setpoint set-ting and is therefore classified as a " challenge.to" pressurizer safety i

valve 8010B.

If further information is needed concerning this matter, please contact me.

a to Very truly yours, p

Ir W

m

?l

[;-[

T. C. Nichols, Jr.

I

. t _a s.

e, s

ARK:TCN;bsg k

I cc: Page Two-l

~

q'

.t; 8102100 k 3

e,

-.~.

E('

b

~

i:

Mr. E.trold R. Denton Page Two e

cc: Messrs. V.C. Summer G.H. Fischer T.C. Nichols, Jr.

E.H. Crews,'Jr.

O.W. Dixon, Jr.

W.A. Williams, Jr.

O.S.'Bradham D.A. Nauman R.B. Clary

-A.R.

Koon A.A. Smith J.B. Knotts, Jr.

J.L. Skolds l

B.A. Bursey NPCF/Whitaker File J

i s

a i

4 I.

l 4

i-i f

4 1,

l g

g 83-9 ge-

'(+--er-viy

'r-W w 'g gr='=ug.

,9ev.=

-+w4--y 7ge4 g-1

-4 +-w/ Sp

-9

.'iWa*

g-p g-ge m

g g

yy y Mf4-er-Fr + - r Tys

+

t-

'tY

e

-