Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000364/LER-1981-009-03, /03L-0:on 810428 & 0501,pressurizer Pressure Indicator PI456 Declared Inoperable.Caused by Out of Spec Indicator Reading Which Occurred During Channel Check. Transmitter Replaced & Channel Returned to Svc + (ML19352A877)
- ML19352A878 + (ML19352A878)
- 05000364/LER-1981-010-03, /03L-0:on 810429 & 30,containment Atmosphere Radioactivity Monitoring Sys R-11 Declared Inoperable.Caused by Filter Paper Not Advancing Due to Paper Spool Slippage on Shaft.Drive Shaft Adjusted & R-11 Returned to Svc + (ML19352A879)
- ML19352A880 + (ML19352A880)
- ML19352A882 + (ML19352A882)
- 05000364/LER-1981-011-03, /03L-0:on 810426 & 27,power Operated Relief Valve 445A Declared Inoperable.Caused by Seat Leakage.Valve Stroke Adjusted.Leakage Reoccurred & Valve Isolated.Repair Will Be Accomplished When Plant Conditions Permit + (ML19352A883)
- ML19352A884 + (ML19352A884)
- 05000272/LER-1981-042-03, /03L-0:on 810426,Action Statement 3.3.1.1 Was Entered for Pressurize Level Channel 3 Being Inoperable. Channel 3 Was 6% High Relative to Channels 1 & 2.Caused by Packing Leak on Valve 1PS8.Valve Was Repacked + (ML19352A887)
- ML19352A888 + (ML19352A888)
- ML19352A889 + (ML19352A889)
- 05000259/LER-1981-018, Forwards LER 81-018/03L-0 + (ML19352A890)
- ML19352A891 + (ML19352A891)
- 05000259/LER-1981-018-03, /03L-0:on 810504,during Refueling,While Performing Automatic Depressurization Sys Timer Calibr,Relay 2E-K35 Was Operating in 126,exceeding Tech Spec Limits.Caused by Normal Aging & Use.Relay Was Recalibr + (ML19352A892)
- LD-81-024, Forwards Agenda for 810622 Meeting to Provide Responses to Mechanical Engineering Branch SER Questions + (ML19352A893)
- 05000295/LER-1981-020, Forwards LER 81-020/03L-0 + (ML19352A894)
- 05000295/LER-1981-020-03, /03L-0:on 810424,during Normal Operation,Oa Boric Acid Tank Found to Be at 13.2% Concentration.Caused by Addition of High Concentration of Batched Boric Acid to Oa Boric Acid Tank.Concentration Reduced to within Spec + (ML19352A896)
- 05000295/LER-1981-019, Forwards LER 81-019/03L-0 + (ML19352A897)
- 05000295/LER-1981-019-03, /03L-0:on 810425,during PT-10,radiation Monitor ORTPR25 Failed to Recover Following de-energization of High Voltage Power Supply.Caused by Failed Resistor R218 & Transistors Q203 & Q204.Defective Components Replaced + (ML19352A899)
- ML19352A900 + (ML19352A900)
- 05000295/LER-1981-018, Forwards LER 81-018/03L-0 + (ML19352A901)
- IR 05000409/1981008 + (ML19352A903)
- 05000295/LER-1981-018-03, /03L-0:on 810423,during Surveillance on Heat Trace,Heater Failure on Circuit 51013 & OLP42 Discovered. Caused by Corrosion of Copper Nelson Sheathed Heat Trace. Faulty Section Replaced.Circuit Placed in Operating Mode + (ML19352A905)
- ML19352A906 + (ML19352A906)
- IR 05000289/1981012 + (ML19352A910)
- ML19352A911 + (ML19352A911)
- ML19352A912 + (ML19352A912)
- ML19352A913 + (ML19352A913)
- ML19352A914 + (ML19352A914)
- ML19352A915 + (ML19352A915)
- ML19352A916 + (ML19352A916)
- IR 05000316/1981010 + (ML19352A917)
- ML19352A918 + (ML19352A918)
- ML19352A920 + (ML19352A920)
- ML19352A921 + (ML19352A921)
- ML19352A922 + (ML19352A922)
- ML19352A923 + (ML19352A923)
- IR 05000409/1981007 + (ML19352A925)
- ML19352A926 + (ML19352A926)
- ML19352A928 + (ML19352A928)
- ML19352A929 + (ML19352A929)
- ML19352A931 + (ML19352A931)
- ML19352A932 + (ML19352A932)
- ML19352A934 + (ML19352A934)
- IR 05000322/1981009 + (ML19352A936)
- ML19352A939 + (ML19352A939)
- 2CAN058112, Forwards Suppl to 810414 Response to NRC 810323 Request for Addl Info Re Analysis of Fuel Misloading Event + (ML19352A944)
- ML19352A945 + (ML19352A945)
- ML19352A946 + (ML19352A946)
- ML19352A947 + (ML19352A947)
- ML19352A948 + (ML19352A948)
- ML19352A950 + (ML19352A950)