ML19352A945

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Rept for Sept 1979
ML19352A945
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/26/1981
From: Baynard P
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19352A946 List:
References
3-051-46, 3-51-46, NUDOCS 8106020394
Download: ML19352A945 (1)


Text

..

r P.ower g;.c.,.. ;

o ~...

,u May 26, 1981 g --

JL,*l0 11981 3

  1. 3-051-46 t2 9

3-C-1-C (2)

% '3,'Ec D d 7 P o i kG a

$Ti~Tf% ^.

Director Office of Ir.spection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Crystal River Unit #3 Docket No. 50-302 Monthly Operationg Report September,1979 License No. DPR-72

Dear Sir:

Attached is a copy of the revision of Crystal River Unit 3 September,

1979, Monthly Operating Report.

The revision consists solely of designating the 337.7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> outage for event 79-17 as forced rather than scheduled.

This report is submitted in accordance with Technical Specifica-tion 6.9.1.6.

Very truly yours, k

P. Y. Baynard Manager l

l Nuclear Support Services Attachment 1

i cc:

Office of Inspection 3nd Enforcement

[

l U.S. Nuclear Regulatory Commission g00g Suite 3100 101 N. Marietta Street Atlanta, Georgia 30303 Averett(Dkt.50-302)(D12)

/[

General Office 3201 Thirty iourtn street sootr;. r o Box 14o42. St Petersbu'9. F.onda 33733 813-866 5151 810a o2 o P 4