ML19352A945
| ML19352A945 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 05/26/1981 |
| From: | Baynard P FLORIDA POWER CORP. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19352A946 | List: |
| References | |
| 3-051-46, 3-51-46, NUDOCS 8106020394 | |
| Download: ML19352A945 (1) | |
Text
..
r P.ower g;.c.,.. ;
o ~...
,u May 26, 1981 g --
JL,*l0 11981 3
- 3-051-46 t2 9
3-C-1-C (2)
% '3,'Ec D d 7 P o i kG a
$Ti~Tf% ^.
Director Office of Ir.spection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Subject:
Crystal River Unit #3 Docket No. 50-302 Monthly Operationg Report September,1979 License No. DPR-72
Dear Sir:
Attached is a copy of the revision of Crystal River Unit 3 September,
- 1979, Monthly Operating Report.
The revision consists solely of designating the 337.7 hour8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> outage for event 79-17 as forced rather than scheduled.
This report is submitted in accordance with Technical Specifica-tion 6.9.1.6.
Very truly yours, k
P. Y. Baynard Manager l
l Nuclear Support Services Attachment 1
i cc:
Office of Inspection 3nd Enforcement
[
l U.S. Nuclear Regulatory Commission g00g Suite 3100 101 N. Marietta Street Atlanta, Georgia 30303 Averett(Dkt.50-302)(D12)
/[
General Office 3201 Thirty iourtn street sootr;. r o Box 14o42. St Petersbu'9. F.onda 33733 813-866 5151 810a o2 o P 4