I U.S. NUCLEAR REGULATORY COMMISSION-
.
0FFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-322/81-09 Docket No. 50-322 Category R
License No. CPPR-95 Priority
--
Licensee:
Long Island Lighting Company 175 East Old Country Road Hicksville, New York 11801 Facility Name:
Shoreham Nuclear Power Station Meet 1ng at:
Shoreham..'New York Meeting conducte May 12 1981 M
8[A A/ b/
Inspectors:
t, da;, signed
~.
rrow -
torInspecto/rW Sl%l l L
)
J. C. H1ggins, Senior Resident Inspector dat's signed
.
date signed
[5 SN /
Approved by:
-
'
E. J Brunner, Chief, Projects Branch #1, DR&PI
~date signed
,
Meeting Sumary:
Meeting on May 12, 1981 (Report No. 50-322/81-09)
Scope: Special, announced management meeting to discuss the results of the NRC board convened to evaluate the Licensee's Performance from March I,1980 to February 28, 1981 as part of the NRC's Systematic Assessment of Licensee Performance
,
(
(SALP) Program.
Areas addressed included: Quality Assurance; Substructure and
'
Foundations; Concrete; Liner; Safety-Related Structures; Piping and Hangers; Safety-Related Components; Electrical Equipment; Electrical; Instrumentation; Fire Protection; Preservico Inspection; Reporting; Environmental; Plant Operations; Fuel Receipt Storage and Handling; Radiation Protection; Maintenance; Security and Safeguards; Surveillance and Preoperational Testing; Emergency Planning; Training; Procurement; Comittee Activities; Engineering / Design; and Management.
Results: A sumary of the licensee performance evaluation was presented.
Areas of concern were discussed with corporate and site management.
No new enforcement actions were identified.
The licensee's performance was rated " Average",
i Region I Form 12
.(Rev. April 77)
8196020371 l
-
-
.
-. _-
.
.
_ - _.., _ _ _ _. _ _.
.
_. _. -,. -.
_., _, _ ~. _.. - - - -
,
.
.o i
,
,
DETAILS 1.
Licensee Attendees M. S. Pollock Vice President, Nuclear s
M. C. Corda o,-Vice President, Engineering T. F. Ger.cke, Engineering Quality Assurance Manager J. P. Novarro, Project Manager W. J. Museler, Assistant Project Manager, Construction E. J. Youngling, Assistant Project Manager, Start-Up
'J. Rivello, Plant Manager E. J. Bajada, Manager, Quality Systems Division J. M. Kelly, Manager, Field Quality Assurance Division
W. E. Steiger, Chief Operating Engineer 2.
NRC' Attendees B. H. Grier, Director, USNRC, Region I E. J. Brunner, Acting Director, DR&PI, Region I H. B. Kister, Chief, Reactor Projects Section #1C L. Narrow, Reactor Inspector, Reactor Projects Section #28 J. C. H.iggins, Senior Resident Inspector, Reactor Projects Section #1C
.
3.
Discussion A brief summary of the Systematic Assessment of Licensee Performance
_
(SALP) Program was presented to explain the basis and purpose of the evaluation.
The NRC Region I evaluation board meeting was discussed, including the assessment period, performance data and the results of the board's evaluation.
The licensee's overall performance is rated average.
Twenty-five functional areas as well as facility management were evaluated.
The Itcensee's performance was rated below average in two functional areas.
Nine functional areas were not rated because the activity is essentially complete, the activity has not started, or activity is at too low a level to provide a basis for evaluation.
-
-
- - _. --
-..
..
.
.
.
- '*
.
SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE
_
REGION I EVALUATION BOARD MEETING
,
Facility: Shoreham Nuclear Power Station Licensee:
Long Island Lighting Company Unit Identification:
Docket No.
License No./Date of Issue Unit No.
50-322 CPPR95/ April 14, 1973
Reactor Information:
NSS: General Electric Company MWT:
2436 Assessment Period: March 1,1980 to February 28, 1981
.
Evaluation Board Meeting Date: April 27, 1981
-
Reviewdea-JSembers:
B. H. Grier, Director, Region I J. M. Allan, Deputy Director, Region I E. J. Brunner, Ac.ing Dir ector, Division of Resident and Project Inspection, RI G. H. Smith, Director, Division of Emergency
,
Preparedness and Operational Support, RI T. T. Martin, Acting Director, Division of Engineering and Technical Inspection, RI J. N. Wilson, Licensing Project Manager, Licensing Branch 1, OL Other NRC Attendees:
H. B. Kister, Chief, Reactor Projects Section '1C E. C. McCabe, Chief, Reactor Projects Section 28
J. C. Higgins, Senior Resident Inspector, Reactor Projects Section 1C L. Narrow, Reactor Inspector, Reactor Projects Section 2B s
B. M. Bordenick, Hearing Counsel, Office of Executive Legal Director L. S. Dewey, Hearing Counsel, Office of Executive Legal Director
-
-
.
..
_,
_ -,.,
. _,
i I
-
.
_
SHOREHAM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA Assessment Period: March 1, 1980 to February 28, 1981 A.
Number and Nature of Noncompliance Items 1.
Noncompliance Category:
Old Enforcement Criteria:
Numbers Violations
Infractions
Deficiencies
New Enforcement Criteria:
-
Severity Levels I-III
.
.
'l Severity Level VI-
.
2.
Areas of Noncompliance:
Numbers Design / Engineering
Quality Assurance
Preoperational Testing
l
'
a
.
,
i
_
SHOREHAM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA'
'
Assessment Period: March 1, 1980 to February 28, 1981 B.
Number and Nature of Licensee Event Reports During the assessment period, four construction deficiency reports
.
(COR's) were submitted by the licensee; all of them the result of design /
manufacturing errors.
1.
. Type of Eecnts A.
Personnel Error
B.
Design / Manufacturing Error
C.
Engineering Error
D.
Construction /QC Error
2.
Causally Linked Events There were four CORs. All involved manufacturing defects.
Two involved Square-O motor control centers, with the problems being improper lubrication.of rubber bumpers on movable starter armatures
,
(design control inadequacy) and improper terminations (manufacturer QC inadequacy). The other two CORs were based on manufacturer modifications. One involved Bailey concrollers, with power supply capacitor damage caused by contamination from packing materials.
The other was a generic design defect (inadequate thrust bearing lubrication) in the DeLaval Diesel Generators.
The following repetitive factors were identifed:
Manufacturing Defects-4 Same Manufacturer
- 2 (Square-0)
Notified by Manufacturer - 2 (Bailey, DeLaval)
The small number of CORs prevents definitive conclusion.
Routine vendor checks should be capable of determining if the Square-D personnel error (terminations) and management error (design control)
are linked through the manufacturer's QA prcgram.
3.
Lfcensee Event Reports Reviewed See Summary.
i
..
.-
_
-.
.~
~
,.
,
SHOREHAM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA Assessment Period: March 1,1980 to February 28, 1981 C.
Escalated Enforcement Actions Civil penalties None.
Orders None.
Immediate Action Letters None.
D.
Management Conferences Held During Past Twelve Months
.
None.
E.
Licensee Activities
,
During the assessment period the licensee's efforts have been concentrated primarily in two areas. The first area is an effort to complete final construction of the various' systems and subsystems and turn the systems over from construction to startup for preoperational testing.
The bulk of the-remaining work is in the area of electrical, instrumentation, and pipe hangers, supports and restraint. At the end of February, 1981 189 of a total 287 systems / subsystems had been turned over to startup. The second major effort was to perform the Integrated Systems Flush, which would involve the Reactor Vessel and attached systems and which is the first major milestone identified on the licensee's critical path schedule to fuel load. Current projects call for its performance in April and May, 1981 about 2 months behind schedule.
Licensee management has esti-mated fuel load would occur between June and September, 1982. The NRC Case Load Panel reviewed construction status in May,1980 and estimated a fuel load date of September, 1982.
Site work force averaged approximately 3200 people during the assessment pariod; 2300 manual, 700 non-nanual, and 200 QA/QC, As of December 1980 the licensee estimated that the plant was 88% complete.
'
i I
!
-.. -...,.
... -. - -
..
.-
t
.
SHOREHAM NUCLEAR POWER STATION LICENSEE PERFORMANCE DATA Assessment Period: March 1,1980 to February 28, 1981 F.
Inspection Activities Construction Phase During the assessment period there were seven region based construction inspections comprising 264 inspection hours.
Functional-areas inspected were primarily instrumentation, electrical, pipe hangers and supports, and preservice inspection.
Project inspection areas'have been electrical, pipe hangers and supports, review of construc-tion deficiency reports, IE Bulletins and Circulars and followup on previous inspection findings t.id allegations. With the exception of the electrical, instrumentation, and pipe hangers, supports, and restraints, the construction inspection program is essentially complete.
Preoperational phase
.
There has been one preoperational phase resident inspector at the site
-
since September 30, 1979. During the assessment period the resident
,
inspector has performed inspections in the construction, preoperational and permanent plant staff areas.
Resident inspection hours totaled 759 for the period. Additionally during the period there was one inspection by a region based preoperational test inspector and one by the environmental section.
Note: Overall total inspection hours during the asessment period were 1144.
I
. - -
_-,
.
, _. -,.
_
,
.
' *, ~,.
'
SHOREHAM NUCLEAR P0t'ER STATION
'
BERFURMANCE RATING l
CONST/PREOPS Above Below Unsatis-A.
Functional Areas Average Average Average factory 1.
Quality Assurance / Control X-l
2.
Substructure and Foundations NA 3.
Concrete
'
X 4.
Liner NA 5.
Safety-Related Structures X
6.
Pioing ind Hangers
.
X 7.
Safety-Related Comconents NA 8.
Electrical Eculoment NR 9.
Electrical (Tray and Wire)
X 10.
Instrumentation X
11.
Fire Protection un 12.
Preservice Insoection (PSI)
y X
13.
Recorting
-
14.
Environmental (Protection)
y 15.
Plant Ocerations X
,
16.
Fuel Receiot Storage and Handling NA 17.
Radiation Protection NB 18. Maintenance X
19.
Security and Safeguards NA 20. Sug an g a,ni m X
'
21.
Emergency Planning NA 22. Training X
23.
Procurement X
24.
Committee Activities x
25.
Engineering / Design X
B.
Facility Management X
C.
Overall Rating X
A i.
egiona[ director
.
.
'P 21.1%f)
'l D$te)
~
.
- -
-
- -. - -
..
.,.