Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19350C650 + (ML19350C650)
- ML19350C651 + (ML19350C651)
- ML19350C652 + (ML19350C652)
- ML19350C653 + (ML19350C653)
- ML19350C654 + (ML19350C654)
- ML19350C655 + (ML19350C655)
- ML19350C656 + (ML19350C656)
- ML19350C657 + (ML19350C657)
- ML19350C658 + (ML19350C658)
- ML19350C659 + (ML19350C659)
- ML19350C660 + (ML19350C660)
- ML19350C661 + (ML19350C661)
- ML19350C662 + (ML19350C662)
- ML19350C663 + (ML19350C663)
- ML19350C664 + (ML19350C664)
- ML19350C665 + (ML19350C665)
- ML19350C666 + (ML19350C666)
- TXX-3293, Forwards Response to NRC ,Confirming Cost of Delay Estimate Provided Orally on 810327 + (ML19350C667)
- ML19350C669 + (ML19350C669)
- ML19350C670 + (ML19350C670)
- BSEP-81-0683, RO 1-81-34:on 810328,two Snubbers & Two Pipe Guides Found Damaged on HPCI Injection Line.Damaged Snubbers & Pipe Guides Being Repaired & Other Supports Examined.Support Repair Completion Expected by 810331 + (ML19350C671)
- ML19350C672 + (ML19350C672)
- ML19350C673 + (ML19350C673)
- ML19350C675 + (ML19350C675)
- ML19350C679 + (ML19350C679)
- ML19350C680 + (ML19350C680)
- ML19350C681 + (ML19350C681)
- ML19350C682 + (ML19350C682)
- 05000324/LER-1981-036, Forwards LER 81-036/03L-0 + (ML19350C683)
- ML19350C684 + (ML19350C684)
- 05000324/LER-1981-036-03, /03L-0:on 810225 & 0303,during Normal Reactor Startup,Primary Containment Oxygen Analyzer Had Upscale & Downscale Indications of Drywell & Torus Oxygen Concentration.Caused by Moisture in Electromagnetic Unit + (ML19350C685)
- ML19350C686 + (ML19350C686)
- JAFP-81-0297, Forwards Rept Listing Mods Installed in Plant During 1980 & Summary of Safety Evaluations for Specified QA Category I Sys & Components + (ML19350C688)
- ML19350C689 + (ML19350C689)
- ML19350C690 + (ML19350C690)
- ML19350C691 + (ML19350C691)
- 05000327/LER-1981-027, Forwards LER 81-027/03L-0 + (ML19350C692)
- ML19350C695 + (ML19350C695)
- ML19350C696 + (ML19350C696)
- ML19350C700 + (ML19350C700)
- ML19350C702 + (ML19350C702)
- ML19350C703 + (ML19350C703)
- 05000324/LER-1981-031-03, /03L-0:on 810223,instrumentation Isolation Valve F014J,located at RIP X-56B,closed,isolating Reactor Protection Sys Main Steam Line High Flow Instruments 2-B21-dPIS-N008A & N008B.Caused by Ruptured Bourdon Tube + (ML19350C704)
- ML19350C705 + (ML19350C705)
- ML19350C706 + (ML19350C706)
- AECM-81-128, Forwards Response to Item 1 of Notice of Violation from IE Insp Rept 50-416/80-29 Re Temporary Alteration Control.Mod Corrected.Responsible Engineer Instructed on Correct Interpretation of Checkout & Turnover Organization Manual + (ML19350C707)
- 05000302/LER-1981-014, Forwards LER 81-014/03L-0 + (ML19350C708)
- ML19350C709 + (ML19350C709)
- ML19350C710 + (ML19350C710)
- AECM-81-120, Interim Deficiency Rept Re Klockner-Moeller Supplied Starter/Breaker plug-in Drawers Not Seismically Qualified, Initially Reported 810227.Investigation Is Continuing.Final Rept Expected by 810601 + (ML19350C711)
- 05000302/LER-1981-014-03, /03L-0:on 810301,Clark Relay Model 5UK6-3 in Reactor Bldg Isolation Channel B,Group 2,failed to Actuate When Coil Was de-energized During SP-130.Caused by Burr on Relay Shaft.Relay Replaced + (ML19350C712)