Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000320/LER-1980-047-03, /03L-0:on 801016,airlock Inner Door Was Leak Tested & Leak Rate Exceeded Tech Specs.Apparently Caused by Foreign Matl on Sealing Surface.Sealing Surface Cleaned & Leak Rate Tested Satisfactorily + (ML19343A929)
- ML19343A931 + (ML19343A931)
- 05000348/LER-1980-064, Forwards LER 80-064/03L-0 + (ML19343A933)
- ML19343A934 + (ML19343A934)
- ML19343A935 + (ML19343A935)
- 05000348/LER-1980-064-03, /03L-0:on 801021,Unit 1 Diesel Generator 1B Output Breaker Was Racked Out.Caused by Personnel Error.Individual Counseled + (ML19343A936)
- ML19343A937 + (ML19343A937)
- ML19343A939 + (ML19343A939)
- ML19343A940 + (ML19343A940)
- ML19343A941 + (ML19343A941)
- ML19343A942 + (ML19343A942)
- ML19343A943 + (ML19343A943)
- 05000339/LER-1980-086, Forwards LER 80-086/03L-0 + (ML19343A944)
- ML19343A945 + (ML19343A945)
- ML19343A946 + (ML19343A946)
- 05000339/LER-1980-086-03, /03L-0:on 801025,containment Sump Flow Integrator FTO-DA-215 Stopped Totalizing Flow.Caused by Foreign Matl Lodged in Integrator Mechanism.Matl Removed + (ML19343A947)
- ML19343A948 + (ML19343A948)
- ML19343A949 + (ML19343A949)
- ML19343A950 + (ML19343A950)
- ML19343A952 + (ML19343A952)
- ML19343A953 + (ML19343A953)
- ML19343A954 + (ML19343A954)
- 05000339/LER-1980-078, Forwards LER 80-078/03L-0 + (ML19343A955)
- ML19343A956 + (ML19343A956)
- 05000339/LER-1980-080, Forwards LER 80-080/03L-0 + (ML19343A957)
- ML19343A958 + (ML19343A958)
- 05000339/LER-1980-078-03, /03L-0:on 801024,seismic Hanger Auxiliary on Feedwater Pump 2-FW-P-3A Recirculation Line Discovered Missing.Caused by Inadequate Implementation of Established Procedures.Personnel Instructed + (ML19343A959)
- 05000339/LER-1980-080-03, /03L-0:on 801025,temp Indicator TI-2412B Associated W/Loop a Failed Low.Caused by Leads from Recorder Connected Upstream of Isolation Amplifier.Procedure Changed to Connect Recorder Leads to Isolated Points of Circuit + (ML19343A961)
- ML19343A962 + (ML19343A962)
- 05000312/LER-1980-043, Forwards LER 80-043/01T-0 + (ML19343A963)
- ML19343A965 + (ML19343A965)
- B10121, Application for Amend to License DPR-21,revising Tech Specs to Require That Standby Liquid Control Sys Produce Concentration of 660 Ppm Boron in Reactor Core.Changes Suppl Reload 7 Licensing Submittal + (ML19343A966)
- 05000312/LER-1980-043-01, /01T-0:on 801031,IE Bulletin 79-01B Review Determined That air-operated Valves Utilize Solenoid Pilot Valves Which Do Not Meet Current Environ Qualification Criteria.Cause Not Stated.Valves Will Be Replaced + (ML19343A968)
- ML19343A970 + (ML19343A970)
- ML19343A971 + (ML19343A971)
- ML19343A972 + (ML19343A972)
- ML19343A973 + (ML19343A973)
- ML19343A974 + (ML19343A974)
- ML19343A975 + (ML19343A975)
- ML19343A976 + (ML19343A976)
- ML19343A977 + (ML19343A977)
- ML19343A978 + (ML19343A978)
- 05000339/LER-1980-089, Forwards LER 80-089/03L-0 + (ML19343A980)
- ML19343A981 + (ML19343A981)
- ML19343A983 + (ML19343A983)
- 05000339/LER-1980-089-03, /03L-0:on 801031,PT-26.3 (Axial Power Distribution Monitoring Periodic Test) Not Performed as Required.Caused by Personnel Error.Test Performed + (ML19343A984)
- ML19343A985 + (ML19343A985)
- ML19343A986 + (ML19343A986)
- 05000338/LER-1980-090, Forwards LER 80-090/03L-0 + (ML19343A987)
- ML19343A988 + (ML19343A988)
- 05000338/LER-1980-090-03, /03L-0:on 801028,containment Particulate Radiation Monitor RM-RMS-159 Inoperable Due to Failed Filter Paper Drive Motor.Caused by Motor Overheating.Motor Replaced + (ML19343A989)