Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- PY-CEI-NRR-1080, Advises of Completion of Addl Licensed Operator Training on Response to Degraded Air Sys,Per Generic Ltr 88-14,dtd 890222 + (ML19324B488)
- ML19324B489 + (ML19324B489)
- ML19324B490 + (ML19324B490)
- ML19324B492 + (ML19324B492)
- ML19324B494 + (ML19324B494)
- ML19324B496 + (ML19324B496)
- ML19324B497 + (ML19324B497)
- ML19324B499 + (ML19324B499)
- ML19324B500 + (ML19324B500)
- ML19324B502 + (ML19324B502)
- ML19324B503 + (ML19324B503)
- ML19324B505 + (ML19324B505)
- 05000424/LER-1989-018-01, :on 891002,steam Generator 1 Train a MSIV Failed to Close,Resulting in Automatic Reactor Trip.Caused by Blown Fuse in Control Logic Power Supply.Grounding Corrected & Limit Switch & Fuse Replaced + (ML19324B512)
- ML19324B515 + (ML19324B515)
- ML19324B516 + (ML19324B516)
- 05000423/LER-1989-021, :on 890925,inadequacy Discovered in Procedure Used to Calculate ESF Response Times Re Slave Relays.Caused by Procedure Inadequacy Since Initial Procedure Development. Slave Relay Surveillances Revised + (ML19324B517)
- W3P89-1930, Responds to Generic Ltr 88-20, Individual Plant Exam for Severe Accident Vulnerabilities - 10CFR50.54(f). Util Expects to Submit Results by Mar 1992 + (ML19324B520)
- ML19324B522 + (ML19324B522)
- ML19324B527 + (ML19324B527)
- ML19324B533 + (ML19324B533)
- ML19324B534 + (ML19324B534)
- ML19324B537 + (ML19324B537)
- 3F1089-24, Informs of Determination That Instrumentation Necessary to Provide Operator W/Info to Allow Operation of High Pressure Injection Subj to More than Acceptable Error & Requests Meeting on 891031 to Discuss Restart of Facility + (ML19324B541)
- ML19324B546 + (ML19324B546)
- ML19324B555 + (ML19324B555)
- ML19324B558 + (ML19324B558)
- ML19324B559 + (ML19324B559)
- LIC-89-1005, Clarifies Issues Discussed in 891018 Telcon Re Design of New Control Room Charcoal Filters + (ML19324B567)
- ML19324B572 + (ML19324B572)
- AECM-89-0199, Provides Supplemental Info Re Antitrust to 890815 Proposed Amend to License NPF-29,establishing New Company,To Be Called Entergy Operations,Inc (Eoi),As sys-wide Nuclear Operating Company + (ML19324B578)
- ML19324B579 + (ML19324B579)
- ML19324B580 + (ML19324B580)
- ML19324B602 + (ML19324B602)
- ML19324B603 + (ML19324B603)
- ML19324B605 + (ML19324B605)
- ML19324B609 + (ML19324B609)
- ML19324B611 + (ML19324B611)
- ML19324B620 + (ML19324B620)
- 05000458/LER-1989-034, :on 890930,determined That 10 H Run of Standby Gas Treatment Sys Train B Not Performed within Allowable Surveillance Tolerance Which Had Ended on 890904.Caused by Human Error.Operations Personnel Trained + (ML19324B622)
- ML19324B623 + (ML19324B623)
- ML19324B624 + (ML19324B624)
- ML19324B630 + (ML19324B630)
- ML19324B634 + (ML19324B634)
- NRC-89-0191, Provides Staff W/Results of Inps & Repairs of Primary Containment/Torus Coatings During First Refueling Outage. Suppression Chamber Air Space Will Be Inerted During Plant Operation + (ML19324B639)
- ML19324B640 + (ML19324B640)
- ML19324B641 + (ML19324B641)
- ML19324B643 + (ML19324B643)
- ML19324B644 + (ML19324B644)
- ML19324B645 + (ML19324B645)
- A08591, Responds to Generic Ltr 89-16 Re Installation of Hardened Wetwell Vent.Cost Estimates & Staff plant-specific Backfit Analysis Will Be Used to Evaluate Efficiency of Requiring Installation + (ML19324B648)
- ML19324B651 + (ML19324B651)