Discusses Licensee Position Re Generic Ltr 89-13, Svc Water Sys Closeout.Plant Shut Down Permanently & in Cool Down Mode,Per 890901 ltr.Non-nuclear Heat Being Added to Core to Maintain Required Reactor Vessel Liner Temps
ML19324B500
Person / Time
Site: Fort Saint Vrain 
Issue date: 10/23/1989
From: Heitner K
Office of Nuclear Reactor Regulation
To: Weiss S
Office of Nuclear Reactor Regulation
References
GL-89-13, TAC-74005, NUDOCS 8911060463
Download: ML19324B500 (2)


Text

.s hp [ (,

^

+'

R 'i,.,;g Octobsr 23, 1989

)

',h f ',

{

+

r

'*' l-. Docket No. 50-267 v

L, MEMORANDUM FOR: Seymour H ' Weiss, Director

,Non-Power Reactors Decomissioning andEnvironmentalProjectsDirectorate h

Division of Reector Projects. III, IV,'V and Special Projects FROM:

Kenneth L. Heitner, Project Manager h

' Non-Power Reactors,.Decomissioning T'

and Environmental Projects Directorate Division of Reactor Projects - III, IV, V and Special Projects '

SUBJECTi GENERIC LETTER 89 13, SERVICE WATER SYSTEMS - CLOSE0VT FOR FORT ST VRAIN (FSV)

J (TAC NO.'74005) l t

'By letter dated September 1, 1989, the Public Servico Company of Colorado announced that FSV was permanently shut down. Since that date, the plant has been in a cooldown mode. Current reports have only a 30 degree F tenperature.

differential across the core. Non nuclear heat is being added to the core to.

maintain the required reactor vessel liner temperatures.

l In, view of these conditions, further effort to evaluate the service water system is not warranted. The plant's safety is not dependent on active systems.

l

[

Therefore, this generic issue is considered closed for FSV. TAC i;o. 74005 is l-

. closed.

l-Original signed byn l'

Kenneth L..Heitner, Project Manager Non-Power Reactors, Decomissioning i

L and Environmental Projects Directorate Division of Reactor Projects. III, l,:

IV, Y and Special Projects 1

- i,

't 1

' DISTRIBUTION

\\(DiaiE TTTe-~a NRC PDR Local PDR L'

PDNP: Reading S. Weiss K. Heitner EjHylton 1

n

PDI 3/ LPM
GCB g 3 0FG- :PDNP/
PDNP/PM H H :PDNP/D t

c

.:.......y...:............:............:.........

t

.....g.....

.....:............:.... 7

.NAME:E8.th..n

KHeitner:
SWeiss)
AChu-
VHodge DATEt:10/f/89..-
10/)9/89
10(/89
10/2j/89
10/J /89 3

i s

0FFICIAL RECORD COPY 0\\

Docurrent Name:

FSV 907 F

\\\\D 8911060463 891023 s-PDR ADOCK 05000267 i

P P N U.

.. cy * #

4,o p

UNITED STATES

'g

(-

g

' NUCLEAR REGULATORY, COMMISSION t' t

' WASHINGTON, D. C.' 20655

\\q

/

october 23, 1989 Docket No. 50-267 MEMORANDUM FOR: Seymour H. Weiss, Director

~;

Non-Power Reactors Decomissioning' and Environmental Projects Directorate Division of Reactor Projects - III, IV, Y and Special Projects FROM:

Kenneth L. Heitner, Project Manager Non-Power Reactors, Decomissioning and Environmental Projects Directorat'e Division of Reactor Projects - III, IV, V and Special Projects

SUBJECT:

GENERIC LETTER 89-13. SERVICE WATER SYSTEMS - CLOSE0VT FOR FORT ST. VRAIN (FSV)

(TAC NO. 74005)

By letter dated September I,1989, the Public Service Company of Colorado

+

announced that FSV was permanently shut down. Since that date, the plant has been in c cooldown mode. Current reports have only a 30 degree F temperature differential across the core. Non nuclear heat is being added to the core to f

maintain the required reactor vessel liner temperatures.

In view of these conditions, further effort to evaluate the service water i

system is not warranted. The plant's safety is not dependent on active systems.

Therefore, this generic issue is considered closed for FSV. TAC No. 74005 is closed.

h4 L.h-L Kenneth L. Heitner, Project Manager Non-Power Reactors, Decomissioning and Environmental Projects Directorate Division of Reactor Projects - III, IV, Y and Special Projects 4