Responds to Generic Ltr 89-07 Re Contingency Planning for Surface Vehicle Bombs.Util Implemented Contingency Procedures Taking Listed Actions & Procedure Inspected
ML19324B645
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 10/31/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
89-356, GL-89-07, GL-89-7, NUDOCS 8911070247
Download: ML19324B645 (2)


Text

-

i i

VIRGINIA ELECTRIC AND power COMPANY RICHMOND, VIRGINIA 23261 i

october 31, 1989 i

United States Nuclear Regulatory Commission Serial No.

89 356 Attn: Document Control Desk NODfrAH:jmj j

Washington, D. C. 20555 Docket Nos.

50 280 50 281 i

50 338 50 339 License Nos. DPR 32 i

DPR 38 NPF 4 j

NPF 7

)

Gentlemen:

i VIRGINIA ELECTRIC AND POWER COMPANY J

SURRY POWER STATION UNITS 1 AND 2 NORTH ANNA POWER STATION UNITS 1 AND 2 RESPO CONTINGR!4CY PLANNING FOR SURFACE VEHICLE BOMBS Virginia Electric and Power Company has reviewed Generic Letter 89 07, Contingency Planning for Surface Vehicle Bombs, and has developed and implemented contingency procedures at North Anna and Surry Power Stations as t

required.

The following actions were taken to develop the procedures:

1

1. The safe standoff distances for vital equipment were determined and survival zones identified.
2. Credible surface vehicle accesr approach paths were determined by reviewing site features.
3. Short range measures, to be implemented within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> of notification by the NRC to protect against unauthorized vehicle access, have been identified.

3

4. Plans and arrangements to facilitate the short range contingency measures have been written and implemented.

j Also, arrangements have been made internally and with principal off site agencies l

such as the Virginia Department of Emergency Services, the Virginia Department of l

Aff 8911070247 h,hggo fee PDR ADOCK PDC p

' pt, H l

,a gr r

i

State Police and the local law enforcement agencies to support the impWmentation of the short range measures, Safeguards contingency procedures, addressing Generic Letter 89 07, have been developed and approved by the Station Nuc^ ear Safety Operating Committees at both stations. The procedure has been examined during a recent inspection of security at Surry Power Station by the NRC Region 11 staff.

Should you have further questions or require additional information, please contact us.

Very truly yours, W. L. Stehdri g

Senior Vice President Power cc: U. S. Nuclear Re0ulatory Commission Region ll 101 Marietta Street, N. W.