Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19296A966 + (ML19296A966)
- ML19296A968 + (ML19296A968)
- 05000312/LER-1980-003, Forwards LER 80-003/03L-0 + (ML19296A970)
- ML19296A972 + (ML19296A972)
- ML19296A973 + (ML19296A973)
- ML19296A974 + (ML19296A974)
- 05000312/LER-1980-003-03, /03L-0:on 800109,while Out of Svc for Fire Protection Mods,Hpi Pump B Was Restored to Standby.Makeup Pump Was Realigned to Normal.Caused by Operator Error. Standing Order Issued + (ML19296A976)
- ML19296A977 + (ML19296A977)
- ML19296A978 + (ML19296A978)
- ML19296A979 + (ML19296A979)
- ML19296A980 + (ML19296A980)
- 05000029/LER-1980-008, Forwards LER 80-008/01T-0 + (ML19296A981)
- ML19296A983 + (ML19296A983)
- 05000029/LER-1980-008-01, /01T-0:on 800201,during Cold Shutdown Mode 5, Safety Injection Accumulator Nitrogen Valves SI-TV-604,605 & 605 Found Inoperable.Caused by Improper Wiring of Polarity Sensitive Time Delay Relays.Wiring Corrected & Tested + (ML19296A984)
- ML19296A986 + (ML19296A986)
- ML19296A987 + (ML19296A987)
- ML19296A988 + (ML19296A988)
- ML19296A989 + (ML19296A989)
- ML19296A990 + (ML19296A990)
- ML19296A991 + (ML19296A991)
- ML19296A993 + (ML19296A993)
- 05000302/LER-1980-004, Supplemental Info to LER 80-004/04L-0:during Jan 1980, Analyses of Seawater Samples Collected at Six Sample Stations Not Performed Correctly Due to Equipment Malfunctions.Samples Recollected & Analyzed + (ML19296A994)
- 05000213/LER-1980-004, Forwards LER 80-004/03L-0 + (ML19296A995)
- ML19296A997 + (ML19296A997)
- ML19296A998 + (ML19296A998)
- ML19296B000 + (ML19296B000)
- ML19296B001 + (ML19296B001)
- 05000213/LER-1980-004-03, /03L-0:on 800204,while Operating at Steady State Full Power,Power Operated Pressurizer Relief Valve 570 & Isolation Valve MOV-569 Opened.Apparently Caused by Spurious Signal from Pressurize Pressure Control Channel 1 + (ML19296B002)
- 05000155/LER-1980-004, Forwards LER 80-004/01T-0 + (ML19296B004)
- ML19296B006 + (ML19296B006)
- ML19296B007 + (ML19296B007)
- ML19296B008 + (ML19296B008)
- ML19296B009 + (ML19296B009)
- 05000155/LER-1980-004-01, /01T-0:on 800201,investigation of Minor Temp & Pressure Changes in Reactor Cooling Water Auxiliary Sys Revealed Broken Air Tubing Line to Control Valve CV4029. Possibly Caused by Contractor Workers.Line Repaired + (ML19296B010)
- ML19296B011 + (ML19296B011)
- ML19296B012 + (ML19296B012)
- ML19296B013 + (ML19296B013)
- ML19296B014 + (ML19296B014)
- ML19296B015 + (ML19296B015)
- 05000346/LER-1980-007, Forwards LER 80-007/03L-0 + (ML19296B016)
- ML19296B017 + (ML19296B017)
- ML19296B018 + (ML19296B018)
- ML19296B019 + (ML19296B019)
- 05000346/LER-1980-007-03, /03L-0:on 800116,ref Position Verification for Group 5,rod 11,was Made 1-h & 40 Minutes Late.Caused by Operator Oversight Due to Lack of Adequate Reminder Sys. Multiple Timer Sys Will Prevent Recurrence + (ML19296B022)
- 05000280/LER-1980-006, Forwards Updated LER 80-006/03X-1 + (ML19296B023)
- ML19296B027 + (ML19296B027)
- ML19296B028 + (ML19296B028)
- ML19296B029 + (ML19296B029)
- ML19296B031 + (ML19296B031)
- 05000155/LER-1980-001, Forwards LER 80-001/03L-0 & Update of LER 79-027/03X-1 + (ML19296B032)
- ML19296B034 + (ML19296B034)