ML19296B017

From kanterella
Jump to navigation Jump to search
Forwards LER 80-007/03L-0
Date released: 11/06/2019 Download: ML19296B017


LER 80-007/03L-0:on 800116,ref Position Verification for Group 5,rod 11,was Made 1-h & 40 Minutes Late.Caused by Operator Oversight Due to Lack of Adequate Reminder Sys. Multiple Timer Sys Will Prevent Recurrence
ML19296B022
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1980
From: Swanger F
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19296B022 (2)
Forwards LER 80-007/03L-0
ML19296B016
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 02/12/1980
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19296B016 (1)