Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000267/LER-1979-005-03, /03L-0 on 790209:during Semiannual Loss of Outside Electrical Power Test,Output Circuit Breaker Did Not Close.Cause Unknown.Breaker Replaced W/Equivalent Spare + (ML19282C165)
- ML19282C166 + (ML19282C166)
- ML19282C167 + (ML19282C167)
- 05000317/LER-1979-007, Forwards LER 79-007/04T-0 + (ML19282C168)
- ML19282C169 + (ML19282C169)
- 05000278/LER-1979-006-03, /03L-1 on 790212:at Power & During Surveillance Test,Setpoint of B Core Spray Pump Start Timer Was Less than Tech Spec Min.Caused by Setpoint Drift on GE Model CR-2820 Time Delay Relay.Relay Readjusted & Tested + (ML19282C170)
- 05000348/LER-1979-012, Forwards LER 79-012/03L-0 + (ML19282C171)
- ML19282C172 + (ML19282C172)
- 05000317/LER-1979-007-04, /04T-0 on 790228:sulfuric Acid Was Discharged Onto Ground Via Storm Drains Near Storage Tank.Caused by Pipe Weld Failure.Spill Isolated & Contained,Leak Located & Welded + (ML19282C173)
- ML19282C174 + (ML19282C174)
- ML19282C175 + (ML19282C175)
- 05000348/LER-1979-012-03, /03L-0 on 790214:review of Solid State Protective Sys Train A/B Operability Test Indicated That Portion of Program Did Not Verify Spray Test Actuation Logic.Caused by Sys Train Design Change.Procedure Modified + (ML19282C176)
- ML19282C177 + (ML19282C177)
- ML19282C178 + (ML19282C178)
- ML19282C179 + (ML19282C179)
- ML19282C180 + (ML19282C180)
- ML19282C181 + (ML19282C181)
- ML19282C182 + (ML19282C182)
- ML19282C183 + (ML19282C183)
- ML19282C185 + (ML19282C185)
- 05000259/LER-1979-003, Forwards LER 79-003/01T-1 + (ML19282C186)
- ML19282C187 + (ML19282C187)
- ML19282C188 + (ML19282C188)
- ML19282C189 + (ML19282C189)
- 05000259/LER-1979-003-01, /01T-1 on 790120:during Cold Shutdown,Local Leak Rate Test Indicated Excessive Total Leakage.Caused by Leaking Valve Seating Surface in Eight Valves.Valves Repaired & Retested + (ML19282C190)
- ML19282C191 + (ML19282C191)
- ML19282C192 + (ML19282C192)
- ML19282C193 + (ML19282C193)
- ML19282C194 + (ML19282C194)
- ML19282C195 + (ML19282C195)
- ML19282C196 + (ML19282C196)
- ML19282C197 + (ML19282C197)
- ML19282C198 + (ML19282C198)
- ML19282C199 + (ML19282C199)
- ML19282C200 + (ML19282C200)
- ML19282C202 + (ML19282C202)
- ML19282C203 + (ML19282C203)
- ML19282C204 + (ML19282C204)
- NRC-2019-0155, Comment (87) of Larry Parker & Steve Meyer on Reactor Oversight Process Enhancement Initiative + (ML19282C205)
- ML19282C206 + (ML19282C206)
- ML19282C207 + (ML19282C207)
- ML19282C208 + (ML19282C208)
- ML19282C209 + (ML19282C209)
- ML19282C210 + (ML19282C210)
- ML19282C211 + (ML19282C211)
- ML19282C213 + (ML19282C213)
- ML19282C214 + (ML19282C214)
- ML19282C215 + (ML19282C215)
- ML19282C216 + (ML19282C216)
- ML19282C217 + (ML19282C217)
- ML19282C218 + (ML19282C218)