ML19282C175

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-03, Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Manufactured by Youngstown Welding & Engineering Co
ML19282C175
Person / Time
Site: Turkey Point, Saint Lucie  NextEra Energy icon.png
Issue date: 03/12/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 7903210138
Download: ML19282C175 (1)


Text

Rfoug' UNITED STATES

/

o NUCLEAR REGULATORY COMMISSION

[

c REGION 11 5

g 101 MARIETTA STREET, N.W.

I ATLANTA, GEOROBA 30303

%,*****/

MAR 121979 In Reply Refer To:

RII:JPO 50-335, 50-389 50-250, 50-251 Florida Power and Light Company Advanced Systems (nd Technology Attn:

Dr. R. E. Uhrig, Vice President P. O. Box 529100 Miami, Florida 33152 Gentlemen:

Enclosed is IE Bulletin No. 79-03, which requires action by you with regard to your power reactor facility (ies) with an operating license or a construction permit.

Should you have any questions regarding this Bulletin or the actions required by you, please centact this office.

Sincerely,

~

g James P. O'Reilly Director

Enclosures:

1.

IE Bulletin No. 79-03 2.

List of IE Bulletins Issued in I.ast Twelve Months 7903210138

MAR I 21979 Florida Power and Light Company cc w/ encl:

N. Weems, Assistant QA Manager P. O. Box 128 Ft. Pierce, Florida 33450 C. M. Wethy, Plant Manager St. Lucie Plant P. O. Box 128 Ft. Pierce, Florida 33450

11. E. Yaeger, Plant Manager Turkey Point Plant P. O. Box 529100 9250 West Flagler Street Miami, Florida 33152 9

e

  • s UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE CF INSPECTION AND ENFORCE!ENT WASHINGTON, D.C.

20555 March 12, 1979 IE Bulletin No. 79-03 LONGITUDINAL WELD DEFECTS IN ASME SA-312 TYPE 30h STAINLESS STEEL PJPE SPQ0LS MANUFACTURED BY YOUNGSTOWN WELDING AND ENGINEERING COMP R Description of Circumstances:

27, 1978, the Arizona Public Service Co=pany reported that On September defects had been discovered in longitudinal velds in ASME Section III class 2 pipe supplied for the Palo Verde Nuclear Generating Station (PVNGS). On November 17, 1978, the Southern California Edison Company reported similar defects in pipe supplied for the San Onofre Nuclear Generating Station, Units 2 and 3.

Pullman Power Products of Los Angeles, California supplies safety-related fabricated piping spools of various diameters for the PVNGS.

The defects were discovered by Pullman in ASME SA-312 type 30h stainless steel pipe supplied to Pullman by Youngstown Welding and Engineering Company of Youngstown, Ohio. The pipe is manufactured by rolling plate into cylinders and then fusion velding the longitudinal seam without filler metal.

Pullman discovered defects in the longitudinal velds while radiographing their circumferential shop velds. Further radiographic examination of the longitudinal velds revealed rejectable porosity and lack of fusion.

Pullman then performed ultrasonic examination of the full length of the longitudinal velds and discovered indications exceeding the acceptance criteria of ASME Section III. Further ultrasonic examination revealed indications in other piping subassemblies where pipe was supplied by Two indications verified by radiography were identified as Youngstown.

porosity and measured 0.350 inch by 0.125 inch in one case and 0.300 inch by 0.125 inch in another case in pipe with a nominal vall thickness of 0.375 inch.

The additional examinations revealed that of 103 spools and four pipe supports shipped to PVNGS, kh spools and one pipe support were found to contain ultrasonic indications exceeding those permitted by the AS!E Of 65 partially fabricated piping spools, 30 were found to be Code.

The acceptance criteria for the pipe supplied by similarly defective.

Youngstown includes 100 percent ultrasonic examination of the longitudinal 1 of 3 7903160138