Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19257D744 + (ML19257D744)
- ML19257D745 + (ML19257D745)
- ML19257D748 + (ML19257D748)
- ML19257D752 + (ML19257D752)
- ML19257D754 + (ML19257D754)
- ML19257D755 + (ML19257D755)
- ML19257D756 + (ML19257D756)
- ML19257D757 + (ML19257D757)
- ML19257D758 + (ML19257D758)
- ML19257D759 + (ML19257D759)
- ML19257D761 + (ML19257D761)
- PNO-III-80-017, on 800123,resident Inspector Informed That Five Cables Were Found Cut in Cable Spreading Room.Cause Still Under Investigation.Site Currently 50% Complete + (ML19257D764)
- PNO-II-79-048, on 791227,portable Heater Caught Fire in Containment Area,Requiring Bldg Evacuation.No Injuries.Work Limited Prior to Atmospheric Testing.Unit Shut Down for Steam Generator Replacement + (ML19257D765)
- ML19257D766 + (ML19257D766)
- PNO-I-79-023, on 791129,operator Discovered Neutralizer Tank Had Overflowed,Resulting in Discharge of 8,400 Gallons of 12.1 Ph Caustic Effluent Into Chesapeake Bay.Caused by Failure of Neutralizer Tank Level Indicator + (ML19257D768)
- ML19257D769 + (ML19257D769)
- PNO-V-79-011, on 791207,resident Inspector Advised of Defects in Certain safety-related Valves.All Such Valves Presently on Hold.Part 21 Rept to Be Issued by 791212 + (ML19257D770)
- 05000324/LER-1980-017, Forwards LER 80-017/01T-0 + (ML19257D771)
- ML19257D772 + (ML19257D772)
- PNO-III-79-051, on 791129,Region 3 Informed That Two of 26 post-tensioning Field Anchor Heads Failed After Installation.Licensee Detensioning & Inspecting Remaining Anchor Heads.One Head Had Significant Cracks + (ML19257D773)
- 05000324/LER-1980-017-01, /01T-0:on 791228,during Scheduled Outage,Found Snubber 2SW-173 SS114 Inoperable.Repair Ordered.On 80018, After Return to Power,Snubber Found Not Repaired.Caused by Snubber Incorrectly Classified as Priority 4 Maint + (ML19257D774)
- ML19257D775 + (ML19257D775)
- PNO-III-79-053, on 791201,hot Leg Temp Element in Loop 2 Failed.Leak Found in Function Box Where Pipe Penetrates Hot Leg.Plans Call for Replacing Element W/Similiar Model + (ML19257D776)
- ML19257D777 + (ML19257D777)
- PNO-I-79-034, on 791212,const Worker Suffered Apparent Broken Wrist After Fall from Water Tower + (ML19257D778)
- ML19257D779 + (ML19257D779)
- ML19257D780 + (ML19257D780)
- ML19257D781 + (ML19257D781)
- ML19257D782 + (ML19257D782)
- ML19257D783 + (ML19257D783)
- ML19257D784 + (ML19257D784)
- ML19257D785 + (ML19257D785)
- ML19257D786 + (ML19257D786)
- ML19257D787 + (ML19257D787)
- ML19257D788 + (ML19257D788)
- ML19257D789 + (ML19257D789)
- ML19257D791 + (ML19257D791)
- ML19257D792 + (ML19257D792)
- ML19257D793 + (ML19257D793)
- PNO-I-79-033, on 791211,spent Fuel Assembly Was Inadvertently Raised from Storage Position.Radiation Alarms Sounded.Pocket Dosimeter Readings Were Less than 30 Millirems for 12-h Shift.Press Release Issued by Util + (ML19257D794)
- ML19257D795 + (ML19257D795)
- ML19257D796 + (ML19257D796)
- ML19257D797 + (ML19257D797)
- ML19257D798 + (ML19257D798)
- ML19257D799 + (ML19257D799)
- 05000325/LER-1980-005, Forwards LER 80-005/03L-0 + (ML19257D800)
- ML19257D801 + (ML19257D801)
- ML19257D802 + (ML19257D802)
- ML19257D803 + (ML19257D803)
- ML19257D804 + (ML19257D804)
- 05000325/LER-1980-005-03, /03L-0:on 800113,while Performing Control Rod Operability Check,Control Rod 42-35 Had No Position Indication at Notch 47.Caused by Fault in Reed Switch in Prototypic Inlet Piping Probe + (ML19257D805)