ML19257D804
| ML19257D804 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 01/18/1980 |
| From: | Stallings C TENNESSEE VALLEY AUTHORITY |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| PO-RMT:BAW, NUDOCS 8002060506 | |
| Download: ML19257D804 (1) | |
Text
,
VrnorNIA Er.ncruzc AND Pownn COMPA.VY nactrwonn.Vrmoxx rA coast g
k
$,:f M
- =
January 18, 1980 G
g s
-2 Mr. James P. O'Reilly, Director Serial No.
056 **
Office of Inspection and Enforcement P0/RMT:bav D
',~
~
U. S. Nuclear Regulatory Commission Docket No. 50-39 Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Pursuant to the provisions of 10CFR 50.55(e), the NRC Region II was notified on December 20, 1979, that the differential pressure switches on the service water strainers to the Unit 2 control room air conditioning chillers were not seismically qualified. These switches (PDS-HV-2228 A and B) serve to automatically initiate operation of self-cleaning strainers 2-HV-S-1A and IB on high differential pressure.
Equivalent differential pressure switches, with previous seismic qualifica-tion on file, have been ordered to replace the existing switches. This replacement will be completed prior to initial fuel loading of North Anna 2.
~
This report constitutes our final report on this matter.
If futher infor-mation is required please contact this office.
Very truly yours, b.
. $/dll$
C. M. Stallings Vice President-Power Supply and Production Operations cc:
Mr. Victor Stello, Director Office of Inspection and Enforcement Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation 1928 260 VOS{
80 0 2 06 05C6
_