Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19224D768 + (ML19224D768)
- ML19224D769 + (ML19224D769)
- ML19224D771 + (ML19224D771)
- ML19224D772 + (ML19224D772)
- ML19224D773 + (ML19224D773)
- ML19224D775 + (ML19224D775)
- 05000346/LER-1979-067, Forwards LER 79-067/01T-0 + (ML19224D776)
- ML19224D777 + (ML19224D777)
- 05000333/LER-1979-038, Forwards LER 79-038/03L-0 + (ML19224D778)
- ML19224D779 + (ML19224D779)
- ML19224D780 + (ML19224D780)
- ML19224D781 + (ML19224D781)
- 05000346/LER-1979-067-01, /01T-0 on 790628:short Circuit Caused Loss of Essential Bus Y4 Sypplying Power to Safety Feature Actuation Sys.Blown Inverter Fuse Was Replaced & Y4 Bus Returned to Normal Supply + (ML19224D782)
- ML19224D784 + (ML19224D784)
- 05000333/LER-1979-038-03, /03l-0 on 790611:main Steam Line Tunnel High Temp Detectors 02-TS-121A Through 02-TS-124D Could Not Be Demonstrated as Fully Operable Due to Calibr Failure of Instrument 02-TIC-200 + (ML19224D785)
- ML19224D786 + (ML19224D786)
- ML19224D787 + (ML19224D787)
- ML19224D788 + (ML19224D788)
- ML19224D790 + (ML19224D790)
- ML19224D791 + (ML19224D791)
- ML19224D792 + (ML19224D792)
- 05000298/LER-1979-012, Forwards LER 79-012/03L-0 + (ML19224D793)
- ML19224D794 + (ML19224D794)
- ML19224D795 + (ML19224D795)
- 05000321/LER-1979-041, Forwards LER 79-041/03L-0 + (ML19224D796)
- 05000298/LER-1979-012-03, /03L-0 on 790503:vessel Water Temp Increased to 220 F W/Primary Containment Integrity Not Established.Caused by Omission in Operating Procedures.Setpoint of Interlock Verified & Procedures Revised + (ML19224D798)
- ML19224D799 + (ML19224D799)
- 05000348/LER-1979-025-03, /03L-0 on 790623:during Surveillance Test FNP-1-STP-256.11 Both Source Range Channels Inadvertently Were Deenergized. Caused by Procedure Deficiency. Power Restored & Procedure Changed + (ML19224D800)
- 05000321/LER-1979-041-03, /03L-0 on 790624:diesel Generator Tripped While Performing Procedure HNP-1-3801.Cause Not Yet Determined. Procedure Performed Again Successfully.Investigation Is in Progress + (ML19224D801)
- ML19224D804 + (ML19224D804)
- 05000298/LER-1979-013, Forwards LER 79-013/03L-0 + (ML19224D805)
- ML19224D806 + (ML19224D806)
- 05000298/LER-1979-013-03, /03L-0 on 790508:correct Drywell to Suppression Chamber Reading Not Established.Caused by Leaking Inlet Purge Valve.Valve Repaired & Leak Tested + (ML19224D808)
- ML19224D809 + (ML19224D809)
- ML19224D811 + (ML19224D811)
- ML19224D812 + (ML19224D812)
- ML19224D813 + (ML19224D813)
- ML19224D815 + (ML19224D815)
- 05000298/LER-1979-014, Forwards LER 79-014/03L-0 + (ML19224D816)
- ML19224D817 + (ML19224D817)
- ML19224D818 + (ML19224D818)
- 05000298/LER-1979-014-03, /03L-0 on 790509:chamber Vent Valve for Torus Level Transmitter Was Left Closed.Caused by Technician Error.Vent Valve Opened & PC-LT-12 Placed Back Into Svc + (ML19224D819)
- ML19224D822 + (ML19224D822)
- 05000336/LER-1979-015, Forwards LER 79-015/03L-0 + (ML19224D823)
- ML19224D824 + (ML19224D824)
- 05000366/LER-1979-056, Forwards LER 79-056/03L-0 + (ML19224D825)
- ML19224D826 + (ML19224D826)
- 05000336/LER-1979-015-03, /03L-0 on 790610:leak Identified in RCS & Traced to Isolation Valve.Cause Unknown.Isolation Valve Repaired & power-operated Relief Valve Declared Operable + (ML19224D828)
- ML19224D829 + (ML19224D829)
- ML19224D830 + (ML19224D830)
- 05000366/LER-1979-056-03, /03L-0 on 790620:during Startup Test,Reactor Core Isolation Exhaust & RHR Heat Exchanger Vents to Torus Increased Water Level to 150.9 Inches,Exceeding Tech Specs. Drainage Decreased Water Level Below Limit within One Hour + (ML19224D831)