Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19207B835 + (ML19207B835)
- ML19207B837 + (ML19207B837)
- ML19207B838 + (ML19207B838)
- ML19207B840 + (ML19207B840)
- ML19207B841 + (ML19207B841)
- ML19207B842 + (ML19207B842)
- ML19207B844 + (ML19207B844)
- ML19207B848 + (ML19207B848)
- ML19207B851 + (ML19207B851)
- RAIO-0719-66435, LLC Response to NRC Request for Additional Information No. 194 (Erai No. 8884) on the NuScale Design Certification Application + (ML19207B852)
- ML19207B853 + (ML19207B853)
- ML19207B854 + (ML19207B854)
- ML19207B855 + (ML19207B855)
- ML19207B856 + (ML19207B856)
- 05000278/LER-1979-024, Forwards LER 79-024/01T-0 + (ML19207B858)
- ML19207B859 + (ML19207B859)
- ML19207B860 + (ML19207B860)
- ML19207B861 + (ML19207B861)
- ML19207B862 + (ML19207B862)
- ML19207B863 + (ML19207B863)
- ML19207B864 + (ML19207B864)
- 05000278/LER-1979-024-01, /01T-0:on 790815,during Response Tests for IE Bulletin 79-02,three or Four Failed Anchor Bolts Were Found on Support to 3D RHR Pump Section Piping.Caused by Improper Installation.Bolts Replaced & Passed Insp + (ML19207B865)
- ML19207B866 + (ML19207B866)
- ML19207B867 + (ML19207B867)
- ML19207B868 + (ML19207B868)
- 05000313/LER-1979-013, Forwards LER 79-013/03L-0 + (ML19207B869)
- ML19207B870 + (ML19207B870)
- ML19207B871 + (ML19207B871)
- ML19207B872 + (ML19207B872)
- ML19207B873 + (ML19207B873)
- ML19207B875 + (ML19207B875)
- ML19207B878 + (ML19207B878)
- ML19207B879 + (ML19207B879)
- 05000368/LER-1979-059, Forwards LER 79-059/03L-0 + (ML19207B881)
- ML19207B882 + (ML19207B882)
- ML19207B883 + (ML19207B883)
- 05000368/LER-1979-059-03, /03L-0:on 790730,during Mode 1 Operation,Power Supply Failed Causing Isolation of Control Room Ventilation. Caused by Circuitry Failure.Power Supply Was Repaired, Operationally Checked & Radiation Monitor Returned to Svc + (ML19207B884)
- 05000313/LER-1979-013-03, /03L-0:on 790808,decay Heat Boron Concentration Was Not Monitored During Prescribed Interval & Inservice Decay Heat Loop Was Switched W/O Switching Sample Lineup. Caused by Communications Breakdown Between Depts + (ML19207B885)
- ML19207B886 + (ML19207B886)
- ML19207B887 + (ML19207B887)
- ML19207B888 + (ML19207B888)
- ML19207B889 + (ML19207B889)
- ML19207B890 + (ML19207B890)
- ML19207B892 + (ML19207B892)
- ML19207B893 + (ML19207B893)
- ML19207B894 + (ML19207B894)
- ML19207B896 + (ML19207B896)
- ML19207B897 + (ML19207B897)
- ML19207B898 + (ML19207B898)
- ML19207B899 + (ML19207B899)
- ML19207B900 + (ML19207B900)