Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18106A418 + (ML18106A418)
- LR-N980158, Provides Response to NRC Requesting Util Review Concern Re Item in TP-6,Section II.4,as It Applies to ASME Code Re Inservice Testing Program.Util Will Clarify Statement in TP-6 Re Testing of Check Valves + (ML18106A420)
- ML18106A421 + (ML18106A421)
- LR-N980038, Application for Amends to Licenses DPR-70 & DPR-75, Respectively,Incorporating Note at Bottom of Salem Unit 2 T3/4.8.2 Into Salem 1 TS & Adding Asterisks to Word Inverters + (ML18106A422)
- ML18106A423 + (ML18106A423)
- ML18106A424 + (ML18106A424)
- ML18106A425 + (ML18106A425)
- LR-N980125, Application for Amend to License DPR-70,changing Applicability Statement from Mode 3 to Modes 1 & 2 + (ML18106A427)
- ML18106A428 + (ML18106A428)
- ML18106A429 + (ML18106A429)
- ML18106A430 + (ML18106A430)
- ML18106A431 + (ML18106A431)
- ML18106A432 + (ML18106A432)
- LR-N980141, Forwards 90-day Response to GL 97-06, SG Tube Insp Techniques + (ML18106A433)
- LR-N980146, Provides Administrative Clarification of Phrase Included in 971014 License Amend Request + (ML18106A434)
- 05000311/LER-1998-006-01, :on 980227,incorrect Scaling of First Stage Turbine Impulse Pressure Transmitters Noted.Cause Indeterminate.Implemented Procedure Changes & re-scaled Affected Turbine Impulse Pressure Transmitters + (ML18106A435)
- ML18106A439 + (ML18106A439)
- ML18106A440 + (ML18106A440)
- IR 05000272/1998004 + (ML18106A442)
- ML18106A444 + (ML18106A444)
- 05000272/LER-1998-004-01, :on 980302,failure to Perform TS 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Were Taken to Correctly Document Safety Factors + (ML18106A445)
- ML18106A446 + (ML18106A446)
- ML18106A447 + (ML18106A447)
- ML18106A449 + (ML18106A449)
- LR-N980160, Responds to NRC Re Violations Noted in Insp Repts 50-272/97-21 & 50-311/97-21.Corrective Actions:Tris Database Was Updated & CR Switches Were Promptly Tagged to Document off-normal Position for These Valves + (ML18106A450)
- ML18106A455 + (ML18106A455)
- ML18106A456 + (ML18106A456)
- ML18106A457 + (ML18106A457)
- ML18106A458 + (ML18106A458)
- LR-N98-0193, Monthly Operating Rept for Mar 1998 for Salem Unit 2 + (ML18106A459)
- GO2-18-056, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 + (ML18106A501)
- ML18106A519 + (ML18106A519)
- ML18106A528 + (ML18106A528)
- ML18106A539 + (ML18106A539)
- ML18106A542 + (ML18106A542)
- ML18106A546 + (ML18106A546)
- LR-N98-0192, Monthly Operating Rept for Mar 1998 for Salem,Unit 1 + (ML18106A556)
- ML18106A557 + (ML18106A557)
- ML18106A560 + (ML18106A560)
- 05000272/LER-1998-008, :on 980323,inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.Caused by less-than-adequate Work Practices During Replacement of Equalizing Valve.Salem Unit 2 Airlocks Were Inspected + (ML18106A561)
- LR-N980198, Informs NRC That Analysis of Containment Liner Anchorage Loading Due to MSLB Completed & Available at Site for NRC Review + (ML18106A562)
- ML18106A563 + (ML18106A563)
- ML18106A564 + (ML18106A564)
- ML18106A565 + (ML18106A565)
- LR-N980144, Informs That Licensee Completed Requirements of CAL Issued on 950609 & Modified on 970806 to Allow Restart of Salem, Unit 2.Mod to Subject Cal,Requested to Allow Salem,Unit 1,to Restart + (ML18106A566)
- LR-N980137, Forwards Responses to NRC Questions Re Electrical Power Sources During Shutdown + (ML18106A567)
- ML18106A570 + (ML18106A570)
- LR-N980197, Responds to NRC Re Violations Noted in Insp Repts 50-272/98-01 & 50-311/98-01.Corrective Actions:New Service Water Reliability Program Manager Has Been Assigned + (ML18106A573)
- ML18106A574 + (ML18106A574)
- ML18106A576 + (ML18106A576)
- ML18106A577 + (ML18106A577)