ML18106A576

From kanterella
Jump to navigation Jump to search
Resubmits LER 98-005-00 as Previous Submittal on 980320 Contained Pages 2-6 Which Incorrectly Listed Facility Name & Docket Number for Salem Unit 2 Instead of Salem Unit 1
Date released: 11/29/2018 Download: ML18106A576


Corrected LER 98-005-00:on 980219,inoperability of 12 Fuel Oil Transfer Pump (Fotp),Noted.Caused by Installation of Incorrect Control Switch.Field Insp Performed to Verify Configuration of Switches for 11,21 & 22 FOTPs
ML18106A578
Person / Time
Site: Salem PSEG icon.png
Issue date: 03/20/1998
From: Knieriem B
Public Service Enterprise Group
To:
References
Download: ML18106A578 (6)
Resubmits LER 98-005-00 as Previous Submittal on 980320 Contained Pages 2-6 Which Incorrectly Listed Facility Name & Docket Number for Salem Unit 2 Instead of Salem Unit 1
ML18106A575
Person / Time
Site: Salem PSEG icon.png
Issue date: 04/27/1998
From: Dawn Powell
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18106A575 (1)